Universal Dry Ice Blasting
Hydroelectric Generator Cleaning
![Page 2: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/2.jpg)
Actions taken before cleaning
• Maintenance crew recorded insulation resistance (Megger test)
• Stator temperatures were recorded at various generator loads
• Scaffolding was constructed
• Covers were removed from Generator
• Generator surrounding area were covered in plastic
![Page 3: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/3.jpg)
Cleaning of Generator
• Upper windings cleaned with CO2
• Lower windings cleaned with CO2
• Field Poles are cleaned with CO2
• Stator cleaned with CO2 (may require repositioning of rotor)
• Windings are hand wiped to remove any remaining dust and oil
• Generator inspected for oil leaks and damage
• Generator can be painted with 2 coats of Glyptal
• All plastic is removed and floors are cleaned
Note: Depending on the size and condition of the unit this process
will take 4-7 days to complete.
![Page 4: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/4.jpg)
Floors and generator were covered in plastic sheeting
![Page 5: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/5.jpg)
Lower windings covered with oil and dirt
![Page 6: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/6.jpg)
Upper end of rotor and windings before cleaning
![Page 7: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/7.jpg)
Oxygen monitor and warning sign in place. An additional monitor was worn by the nozzle operator.
![Page 8: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/8.jpg)
Dry Ice is (-109.3 F) CO2 Pellets are accelerated at high velocity. Upon impact the solid CO2 pellet turns to gas that expand in volume nearly 800 times of the pellet instantly. This process causes Micro-Explosions that help assist removal of debris.
![Page 9: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/9.jpg)
Stator before CO2 Blasting
![Page 10: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/10.jpg)
Stator and air vents partially cleaned. The air vents were plugged with gummy oil and debris. Leaving no air flow to cool the generator
![Page 11: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/11.jpg)
Properly cleaning the generator without removing the rotor saves companies so much money on time and man hours that it would take to disassemble and put the unit back together.
![Page 12: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/12.jpg)
Stator and air vents after CO2 Blasting
![Page 13: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/13.jpg)
Some areas did require a second blasting
![Page 14: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/14.jpg)
View of stator after second blasting
![Page 15: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/15.jpg)
Blasting Generator inspection windows with CO2
![Page 16: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/16.jpg)
Each winding is hand wiped after blasting to remove any residual dust and debris
![Page 17: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/17.jpg)
Upper windings after CO2 Blasting
![Page 18: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/18.jpg)
Lower windings after CO2 Blasting
![Page 19: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/19.jpg)
Upper end of generator after CO2 Blasting
![Page 20: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/20.jpg)
Vacuuming out lose dirt and debris
![Page 21: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/21.jpg)
Painted surfaces were cleaned and degreased by hand
![Page 22: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/22.jpg)
Thorough inspection of the generator conducted after all clean up is finished
![Page 23: Hydroelectric Generator Cleaning Walk Through by Universal Dry Ice Blasting](https://reader031.vdocument.in/reader031/viewer/2022022414/587ae3461a28ab542b8b6ce5/html5/thumbnails/23.jpg)