ideal grid for all 04/12/2015 SLIDE 1
• IDE4L project overview and ANM concept
• Aggregator concept
• Developed functionalities
• Distributed automation system
• Demonstrations
• Conclusions
WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015
ideal grid for all 01/12/2015 WWW.IDE4L.EU - SLIDE 2
Lab Demo Site
Field Demo Site
ideal grid for all 01/12/2015 WWW.IDE4L.EU - SLIDE 4
Lab Demo Site
Field Demo Site Brescia, Italy
ideal grid for all
A2A
04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 6
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 7
A2A (LV network)
ASSETS: • 1 Secondary substation
• 10 LV feeders • 5/10 FDs with monitoring equipment
• 1/10 FD with monitor and control
• 10/10 FDs managed by algorithms
USE CASES: • RT monitoring
• Load and production forecaster
• State estimation
• Power control
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 8
A2A (LV network)
Secondary substation involved in the LV test phase
ideal grid for all
A2A
04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 9
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 10
A2A (LV network)
LV controllable breakers
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 11
A2A (LV network)
LV – BPL modem
SM PV
SM Load
LV customer
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 12
A2A (LV network)
DVR
STATCOM
PV inverter
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 13
A2A (LV network) • Solar eclipse March, 20th 2015
• Power reduction : 40%-75%
• Voltage reduction: 5 V (worst case)
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 14
A2A (LV network) • Voltage profile:
• 3 LV customers
• 1 week
• 6 samples per hour
ideal grid for all 01/12/2015 WWW.IDE4L.EU - SLIDE
18
Lab Demo Site
Field Demo Site
Seville, Spain
ideal grid for all
Telvent MV Use cases
• Network real-time monitoring
• Distributed FLISR
Hardware and software
• RTU • Telvent HU_AF + AB_AC
• Signal Generator • Omicrom CMC 353
• GOOSE compatible Switch • Netgear GS105Ev2
• PC tools • IEDs Web Server Connection
• IED Scout
• Wireshark
04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 19
Generator Controller&
Wireshark & IED Scout
Triphasic signal generator
Multiple RTU
ideal grid for all
Validation Cabinet
04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 20
Telvent
Components
• Light indicators for switch/circuit breakers position
• Configurable fault impedances
• 5 short-circuits testing points
ideal grid for all 01/12/2015 WWW.IDE4L.EU - SLIDE
21
Lab Demo Site
Field Demo Site
Tampere, Finland
ideal grid for all
TUT Use cases (MV and LV)
• Network real-time monitoring
• State estimation
• State forecast
• Power control (secondary control of congestion management)
• Distributed FLISR
Hardware and software
• RTDS
• Smart meters • Kamstrup Omnipower
• Landis&Gyr E650
• RTU • Monitoring: iRTU (iGrid)
• FLISR: Telvent HU_AF + AB_AC
• Voltage controllers • OLTC: ABB REU615
• DG: ABB Unitrol 1020
• GW: Modbus to IEC61850 (HMS)
• PSAU and SSAU
04/12/2015 SLIDE 22 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015
ideal grid for all
TUT – State estimation use case 04/12/2015 SLIDE 23
Customer (simulated)Street Cabinet (simulated)
MV/LV substation (simulated)
PDOLTC
CTRL
RTU
Switch
Switch
SM SMPV
CTRL
modbus
850
AC
DC
HV/MV substation (simulated)
PD
OLTC
CTRL
SSAU
61850 MMS client
61850 MMS server
DLMS/COSEM client
LV RT monitoring (step 1)
MV RT mon
MV PC
PSAU
61850 MMS client
61850 MMS server
Wireless
network real time MONitoring (MON)
State Estimation (SE)
Power Control (PC)
Topology Manager (TM)
LV State Forecast (SF)
DG
CTRL
Modbus
850
DG
CTRL
Modbus
850
Telecomm. device
IED
Building blocks
modbus
DLMS/COSEM
61850-MMS
(report)
61850-MMS
(control/substitute)
61850-GOOSE
104
WS
Data flows
FO
PLC
ETH
Wireless
Serial
Plain cable
Physical connections
RTU
WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015
ideal grid for all
TUT – Power control use case 04/12/2015 SLIDE 24
Customer (simulated)Street Cabinet (simulated)
MV/LV substation (simulated)
PDOLTC
CTRL
RTU
Switch
Switch
SM SMPV
CTRL
modbus
850
AC
DC
HV/MV substation (simulated)
PD
OLTC
CTRL
SSAU
61850 MMS client
61850 MMS server
DLMS/COSEM client
LV RT monitoring (step 1)
MV RT mon
MV PC
PSAU
61850 MMS client
61850 MMS server
Wireless
network real time MONitoring (MON)
State Estimation (SE)
Power Control (PC)
Topology Manager (TM)
LV State Forecast (SF)
DG
CTRL
Modbus
850
DG
CTRL
Modbus
850
Telecomm. device
IED
Building blocks
modbus
DLMS/COSEM
61850-MMS
(report)
61850-MMS
(control/substitute)
61850-GOOSE
104
WS
Data flows
FO
PLC
ETH
Wireless
Serial
Plain cable
Physical connections
RTU
WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015
ideal grid for all 01/12/2015 WWW.IDE4L.EU - SLIDE
25
Lab Demo Site
Field Demo Site Barcelona, Spain
ideal grid for all
IREC
04/12/2015 SLIDE 26
PCC to the distribution network (emulated)
Sw
itch
(o
nly
1 s
w)
AC
DCES
CTRL
DER
CTRL
EMUL
CTRL
microGrid (emulated)
AC
DC
uGrid concentrator
Aggregator
PQ Control
XML
Data flows
ETH
Wireless
Physical connections
Control center (conceptual)
Tertiary Control (TC)/Market Agent (MA)
Actual Flexibility Capacity Estimation
Flexibility Activation
DMS
Ask for
flexibility capacity (2)
Flexibility Activation
MATLAB VARIABLES or FILES
DN simulator
MATLAB
SimPowerSystems
or MATPOWER
AC D
C
DC A
C
Grid emulator
GE
so
cke
ts (
MA
TL
AB
or
PY
TH
ON
)
GE
MGMT
Cinergia
protocol
CA (MATLAB)
Allocate CRP control
setpoints among
flexible resources
Read activated CRP
product
Modbus server
(virtual Linux)
string
csv file
EMS
AC
DC
DC
AC
modbus
Send CRP control
setpoints
Ask for
flexibility capacity (1)
Flexibility Activation
Optimization of uGrid operation
Gateway to remote signals
Management of data traffic
Logging
Measured P (optional)
Measured P (optional)
Voltage setpointFlexibility Activation
MATLAB
VARIABLES or
FILES
files
WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015
ideal grid for all 04/12/2015 SLIDE 28
IREC – setup 1 ASSETS: • 1 Grid emulator 200 kW
• 1 Interconnection Switch
• 1 Microgrid central controller • Energy management system
• Safety controller
CONTROLLABLE NODES: • Up to 6 DER emulators of 4 kW each
• 1 supercapacitor bank of 5 kW
• 1 lithium-ion battery of 10 kVA (5 kW)
USE CASES (LV): • Flicker mitigation
• Grid emulator + Supercapacitors
• Microgrid islanding • 1 Interconnection Switch + Lithium-ion battery + Safety controller
WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015
ideal grid for all 04/12/2015 SLIDE 29
IREC – setup 2
ASSETS: • 1 LV microgrid
• 1 PV emulator
• 1 battery
• 1 residential load emulator
• 1 digital simulator with power amplification • 1 grid emulator
CONTROLLABLE NODES: • 1 HEMS with flexibility
functionality
USE CASES (MV/LV): • CRP activation
WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015
ideal grid for all 01/12/2015 WWW.IDE4L.EU - SLIDE
30
Lab Demo Site
Field Demo Site
Aachen, Germany
ideal grid for all
RWTH
04/12/2015 WWW.IDE4L.EU - Review meeting 5th May 2015 SLIDE 31
Switch
LV Cabinet (simulated)
MV/LV substation (simulated)
PMUOLTC
CTRL
Switch
HV/MV substation (simulated)
PMU
OLTC
CTRL
SSAU
61850 MMS client
61850 MMS server
DLMS/COSEM client
NTP
SCADA/DMS
Control center
Sw
itch
AC
DC
AC
DC
AC
DC
SM
ES
CTRL
PV
CTRL
EV
CTRL
Customer (simulated)
61850 MMS client
CC Network Reconfiguration (NR)
PSAU
61850 MMS client
61850 MMS server
network real time MONitoring (MON)
State Estimation (SE)
Power Control (PC)
network real time MONitoring (MON)State Estimation (SE)Power Control (PC)
SM
LV RT mon
MV RT monMV RT mon
MV RT mon
MV RT mon
LV PC
LV PC
MV PC
MV PC
MV RT mon
CC NR
CC NR
SMSTATCOM
CTRL
AC
DC
Switch
C37.118
Phasor Data Concentrator (PDC)
Telecomm. device
IED
Building blocks
modbus
DLMS/COSEM
61850-MMS
(report)61850-MMS
(control/substitute)
61850-GOOSE
104
WS
Data flowsFOPLCETHWirelessSerialPlain cable
Physical connections
Tertiary Control:
Market agent (MA)
Use case tested
• LV and MV Monitoring
• LV and MV State estimation
• LV and MV Power Control
• Control center power control
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 32
RWTH
Alstom PMUs and GPS Unit PMU prototype
RTDS
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 33
Testing Platform for MV & LV monitoring & control systems
PSAU
RTDS Rack
RSCAD
GTAO card (RTDS)
Voltage and current
converters
SimulationNetwork
Smart Meter PMU
GTNET (RTDS)
IED
Process Bus
Station Bus
SSAU
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 34
Testing Platform for MV & LV monitoring & control systems Use Case : Monitoring and state estimation
PSAU
RTDS Rack
RSCAD
GTAO card (RTDS)
Voltage and current
converters
SimulationNetwork
Smart Meter PMU
GTNET (RTDS)
IED
Process Bus
Station Bus
SSAU
Analog voltage signals
Analog current and voltage signals
MMS and DLMS/COSEMSV
MMS
MMS
MMS
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 35
Testing Platform for MV & LV monitoring & control systems Use Case : Low voltage and medium voltage control
PSAU
RTDS Rack
RSCAD
GTAO card (RTDS)
Voltage and current
converters
SimulationNetwork
Smart Meter PMU
GTNET (RTDS)
IED
Process Bus
Station Bus
SSAU MMS
MMS
MMS
ideal grid for all 01/12/2015 WWW.IDE4L.EU - SLIDE
36
Lab Demo Site
Field Demo Site
Bronholm, Denmark
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 37
ØSTKRAFT (LV network)
ASSETS: • 1 Secondary substation
• 4 LV feeders • monitoring equipment
• Smart meters 112
• Weather station
USE CASES: • RT monitoring
• Load Forecaster
• State estimation
• State forecast
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 38
ØSTKRAFT (LV network)
LV – Feeders
Smart meter Concentrator
LV monitoring
Weather Station
Substation 29 Tejn
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 39
ØSTKRAFT (LV network) • Example of a smart meter profile with 5 minute values:
ideal grid for all 04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 40
ØSTKRAFT (MV)
ASSETS: • 1 Primary substation
• 1 MV feeder
• 2 secondary substations
MV USE CASES: • FLISR
ideal grid for all
OST
04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 41
MV switch gear 29 Tejn
MV monitoring and control equipment
29 Tejn
ideal grid for all
OST
04/12/2015 WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015 SLIDE 42
Switch
SSAU
ideal grid for all 01/12/2015 WWW.IDE4L.EU - SLIDE
43
Lab Demo Site
Field Demo Site
Madrid, Spain
ideal grid for all 04/12/2015 SLIDE 44
UFD (LV)
ASSETS: • 2 Secondary substations; 10 LV feeders; 240 loads + DERs
CONTROLLABLE NODES: • LV network reconfiguration
• Control of DERs
USE CASES (LV): • RT monitoring
• State estimation
• Power control
• State Forecast
• Load & Generation
Forecast
WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015
ideal grid for all 04/12/2015 SLIDE 45
UFD
WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015
ideal grid for all
UFD deployment
04/12/2015 SLIDE 46
PV panels
Wind Turbine
Gas Generator
Electric Vehicle
LV Supervisor
Physical device
=
UCSLIN_1
Logical device
=
LININVMCA
GGIO1
Logical
Node
=
GGIO01
(Generic
Input/Output
Data)
Data Object
= AnIn
Analogue Input
Data Object
= AnOut
Contr.Analogue
Output
Data Object
= Ind
General Indication
Data Attributes
mag: Analog. Value
q: Quality
T: TimeStamp
Data Attributes
Oper: INT32
Data Attributes
stVal: INT32
Q: Quality
T: TimeStamp
Mapping information from MODBUS to IEC61850
WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015
ideal grid for all
UFD deployment
04/12/2015 SLIDE 47
61850 SERVER
Data from: PV
Wind Turbine
Gas Generator
Electric Vehicle
LV Supervisor
Meter Data
Concentrator
(instant values)
SAU
Data Base
Algorithms
• State Estimator
• Power Control
• Load Forecast
• State Forecast
WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015
ideal grid for all
Status Interface: last importation, status, error detection
UFD deployment
04/12/2015 SLIDE 48
Data Monitoring Interface:
WWW.IDE4L.EU – Tampere Dissemination Activity 4th December 2015