Download - Indra Sakti CV

Transcript
  • Name: Indra Sakti Updated: 27/05/2013 Page 1

    Name: Indra Sakti Trisany

    Nationality: Indonesian

    Qualifications:

    Bachelor Degree, Mechanical Engineering, University Muhammadiyah jakarta, 2011

    Diploma, Mechanical Engineering, ISTN, 2006

    Contact Number

    (021) 4601526 home 081285560584 (hp)

    Computing Skill:

    PDMS 11,6

    Autocad r2004~2010

    Sketch-up 8

    3D max

    Training:

    PDMS 11,6 Course by Upgreid, 2008

    Manual Draftsman by ITC, Jakarta 1997

    Cad Draftsman Piping and M&E by ITC,Jakarta 1999

    Cad 3D Piping by Multikom, Jakarta 1998

    Experience Summary

    Indra career spans almost 15 years in Engineering drafting and design almost 6 years in Oil & Gas industry and 9 years in

    high rise building. Experience covers coordination and arrangement of station (plant room), alignment sheet, isometric

    and detailed design drawing. he is familiar with various Oil & Gas Industrial Codes and Standards.

    he joined J P Kenny in November 2012 as a piping / pipeline draftsman

    SPECIFIC CAPABILITIES:

    Isometric and Spool drawing

    Pipeline alignment sheet drawing

    Composite drawing, piping layout, plantroom detail and sections

    Knowledge of equipment, piping,civil and structural modelling on PDMS software

    Designed piping and mechanical system for project and maintenance in the high rise building

    Key Projects Summary:

  • Name: Indra Sakti Updated: 27/05/2013 Page 2

    Work Experience:

    JPKENNY PT WOOD GROUP INDONESIA, NOVEMBER 2012 PRESENT

    Client : Pearl Oil (sebuku) LTD.

    Project : Pipeline detail engineering for ruby field development project.

    Position : Pipeline draftsman

    Responsibility : Supporting drafting pipeline alignment sheet 14 ruby to senipah terminal

    WGIM PT WOOD GROUP INDONESIA, SEPTEMBER 2012 NOVEMBER 2012

    Client : Amerada Hess (Indonesia-Pangkah) Limited

    Project : Ujung Pangkah Development Onshore Processing Facility.

    Position : Piping draftsman

    Responsibility : Prepared and redrawing for isometric, Tank and Vessel drawing

    PT BINTANG PERSADA ABADI, AUGUST 2012 NOVEMBER 2012

    Client : Pertamina Gas

    Project : Pembangunan pipa minyak mentah tempino-Plaju

    Position : Lead draftsman

    Responsibility : Prepared Station & manifold KM.03, KM.174, KM.265,Revised alignment sheet Pipeline 8, 265 km

    HYUPJIN VINA CO.,LTD, JULY 2011 APRIL 2012

    Client : Binh Minh Import Production and Trade Co.LTD (BITEXCO)

    Project : JW Marriot Hanoi, Vietname

    Position : Drawing EngineerDesign /Designer

    Responsibility : Prepared all General arrangement Plant room

    PT. TOTAL BANGUN PERSADA, MEI 2009 JUNE 2011

    Client : PT. Garama Dhana Laksmi

    Project : Sovereign Plaza

    Position : Designer

    Responsibility : Prepared all General arrangement Plant room, Composite drawing

    MOHAMED ASKANANI INTL.- ADHI KARYA TBK JO, FEBRUARY 2006 MARCH 2009

    Client : AL-RAYYAN TOURISM INVESTMENT COMPANY

    Project : Doha City Centre Expansion Phase III (East)

    Position : Designer

    Responsibility : Prepared all General arrangement Plant room, Composite drawing

  • Name: Indra Sakti Updated: 27/05/2013 Page 3

    SHIMIZU TOTAL SCBK JO , AUGUST 2003 DECEMBER 2005

    Client : PT. MANDIRI EKA ABADI

    Project : Pakubuwono Resident Project

    Position : MEP Inspector

    Responsibility : Make RIT ( Plan Inspect & Test ), coordination and lead execution of construction work

    PT. CITRA PANJI MANUNGGAL, NOVEMBER 2000 SEPTEMBER 2001

    Client : PT. SABUT MAS ABADI

    Project : Palm Oil Mill Ext.30~60 ton/hr (central Kalimantan

    Position : Piping Draftsman

    Responsibility : Preparation Piping & Mechanical Works

    PT. CITRA PANJI MANUNGGAL, DESEMBER 1997 JULY 2000

    Client : PT. BADAK NGL. CO Bontang East Kalimantan

    Project : Construction of Plant-1 Project, Train D&F WP#1~4

    Position : Site Piping Draftsman

    Responsibility : Preparation Piping layout , Isometric, MTO & Asbuilt

    PT. MULTI TECHNIK, ENGINEERING JANUARY 1997 APRIL 1997

    Client : KONDUR PETROLEUM SA

    Project : EPC-1996 Facilities Development Project Pekanbaru South

    Position : Piping/Pipeline Draftsman

    Responsibility : Preparation pipeline alignment sheet

    PT. KOMATSU INDONESIA, AUGUST 1994 JULY 1996

    Position : Welder 3G


Top Related