T
Technco
stan
for i
nicalonnecndard
Inspeinstallat
Expctionds fo
B
ection antion of D
O
www.ewa.bh
pert ton guidor theahra
nd TestiDistribu
2.2
October 201
h
o devdeline Kinin
ing Chected Sola
7
velopnes agdom
cklists ar PV Pla
p grind m of
ants
d
1 SCO
2 For
2.1
2.2
3 Sol
3.1 3.1.3.1.3.1.
3.2 3.2.3.2.3.2.
4 Me
4.1
4.2 4.2.4.2.4.2.
4.3 4.3.4.3.4.3.
4.4 4.4.4.4.4.4.
4.5 4.5.4.5.4.5.
4.6 4.6.4.6.4.6.
4.7 4.7.4.7.4.7.
OPE ...........
reword ......
Reference
Terms and
lar PV Desig
PV plants .1 Descript.2 Pass/fail .3 Checklist
Above 11 .1 Descript.2 Pass/fail .3 Checklist
echanical In
Overview
General on.1 Descript.2 Pass/fail .3 Checklist
Document.1 Descript.2 Pass/fail .3 Checklist
Civil work.1 Descript.2 Pass/fail .3 Checklist
PV module.1 Descript.2 Pass/fail .3 Checklist
Electrical e.1 Descript.2 Pass/fail .3 Checklist
Mechanica.1 Descript.2 Pass/fail .3 Final res
.................
.................
e documents
d definitions
gn Check‐lis
up to 11 kWion .................criteria .........t .....................
kW ............ion .................criteria .........t .....................
nspection Ch
..................
n PV plant aion .................criteria .........t .....................
ts required .ion .................criteria .........t .....................
s and Suppoion .................criteria .........t .....................
es ...............ion .................criteria .........t .....................
equipment iion .................criteria .........t .....................
al Inspectionion .................criteria .........ult page .........
Tab
.................
.................
s ..................
..................
st ...............
W ....................................................................................
...................
......................
......................
......................
hecklists ....
...................
nd Participa..................................................................
...................
......................
......................
......................
ort structures..................................................................
...................
......................
......................
......................
nstallation a..................................................................
n Final result..................................................................
ble of cont
..................
..................
...................
...................
..................
...................
......................
......................
......................
...................
......................
......................
......................
..................
...................
ants ...............................................................................
...................
......................
......................
......................
s ...................................................................................
...................
......................
......................
......................
and protecti..................................................................
t ...................................................................................
tents
..................
..................
...................
...................
..................
..................................................................................
..................................................................................
..................
...................
..................................................................................
..................................................................................
..................................................................................
..................................................................................
on .............................................................................
..................................................................................
..................
..................
...................
...................
..................
.....................................................................................
.....................................................................................
..................
...................
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
.................
.................
...................
...................
.................
.....................................................................................
.....................................................................................
.................
...................
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
Page | 2
............. 5
............. 7
............... 7
............... 7
............. 9
............... 9................. 9................. 9................. 9
............. 10............... 10............... 10............... 10
........... 12
............. 12
............. 12............... 12............... 12............... 12
............. 13............... 13............... 13............... 13
............. 14............... 14............... 14............... 14
............. 15............... 15............... 15............... 15
............. 15............... 15............... 15............... 16
............. 17............... 17............... 17............... 17
5 Tes
5.1
5.2 5.2.5.2.5.2.
5.3 5.3.5.3.5.3.
5.4 5.4.5.4.5.4.
5.5 5.5.5.5.5.5.
5.6 5.6.5.6.5.6.
5.7 5.7.5.7.5.7.
5.8 5.8.5.8.5.8.
6 Tes
6.1
6.2 6.2.6.2.6.2.
6.3 6.3.6.3.6.3.
6.4 6.4.6.4.6.4.
st without I
Overview
General on.1 Descript.2 Pass/fail .3 Checklist
Document.1 Descript.2 Pass/fail .3 Checklist
DC system.1 Descript.2 Pass/fail .3 Checklist
AC system.1 Descript.2 Pass/fail .3 Checklist
Labelling a.1 Descript.2 Pass/fail .3 Checklist
PV array t.1 Descript.2 Pass/fail .3 Checklist
Test witho.1 Descript.2 Pass/fail .3 Final res
st with Inte
Overview
General on.1 Descript.2 Pass/fail .3 Checklist
Document.1 Descript.2 Pass/fail .3 Checklist
Sensors ....1 Descript.2 Pass/fail .3 Checklist
Interconnec
..................
n PV plant aion .................criteria .........t .....................
ts required .ion .................criteria .........t .....................
m inspection ion .................criteria .........t .....................
m inspection ion .................criteria .........t .....................
and identificion .................criteria .........t .....................
est report ..ion .................criteria .........t .....................
out Interconion .................criteria .........ult page .........
erconnection
..................
n PV plant aion .................criteria .........t .....................
ts required .ion .................criteria .........t .....................
..................ion .................criteria .........t .....................
ction Check
...................
nd Participa..................................................................
...................
......................
......................
......................
...................
......................
......................
......................
...................
......................
......................
......................
cation ............................................................................
...................
......................
......................
......................
nection Fina..................................................................
n Checklist
...................
nd Participa..................................................................
...................
......................
......................
......................
...................
......................
......................
......................
klist ............
...................
ants ...............................................................................
...................
......................
......................
......................
...................
......................
......................
......................
...................
......................
......................
......................
...................
......................
......................
......................
...................
......................
......................
......................
al result .........................................................................
.................
...................
ants ...............................................................................
...................
......................
......................
......................
...................
......................
......................
......................
..................
...................
..................................................................................
..................................................................................
..................................................................................
..................................................................................
..................................................................................
..................................................................................
..................................................................................
..................
...................
..................................................................................
..................................................................................
..................................................................................
..................
...................
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
..................
...................
.....................................................................................
.....................................................................................
.....................................................................................
.................
...................
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
.................
...................
.....................................................................................
.....................................................................................
.....................................................................................
Page | 3
........... 18
............. 18
............. 18............... 18............... 18............... 18
............. 19............... 19............... 19............... 19
............. 19............... 19............... 20............... 20
............. 22............... 22............... 22............... 22
............. 23............... 23............... 23............... 23
............. 24............... 24............... 24............... 24
............. 25............... 25............... 25............... 25
........... 27
............. 27
............. 27............... 27............... 27............... 27
............. 28............... 28............... 28............... 28
............. 28............... 28............... 28............... 29
6.5 6.5.6.5.6.5.
6.6 6.6.6.6.6.6.
6.7 6.7.6.7.6.7.
7 Pow
7.1
7.2 7.2.7.2.7.2.
7.3 7.3.7.3.7.3.
7.4 7.4.7.4.7.4.
7.5 7.5.7.5.7.5.
Performan.1 Descript.2 Pass/fail .3 Checklist
Inspection.1 Descript.2 Pass/fail .3 Checklist
Test with .1 Descript.2 Pass/fail .3 Final res
wer Quality
Overview
General on.1 Descript.2 Pass/fail .3 Checklist
Document.1 Descript.2 Pass/fail .3 Checklist
Harmonic .1 Descript.2 Pass/fail .3 Checklist
Power Qu.1 Descript.2 Pass/fail .3 Final res
nce test ......ion .................criteria .........t .....................
n and Test ofion .................criteria .........t .....................
Interconnecion .................criteria .........ult page .........
y Measurem
..................
n PV plant aion .................criteria .........t .....................
ts required .ion .................criteria .........t .....................
Tests .........ion .................criteria .........t .....................
ality Measuion .................criteria .........ult page .........
...................
......................
......................
......................
f the Interfac..................................................................
tion Final re..................................................................
ments and T
...................
nd Participa..................................................................
...................
......................
......................
......................
...................
......................
......................
......................
rements and..................................................................
...................
......................
......................
......................
ce Protectio..................................................................
esult ..............................................................................
Tests Check
...................
ants ...............................................................................
...................
......................
......................
......................
...................
......................
......................
......................
d Tests Final..................................................................
..................................................................................
n ...............................................................................
..................................................................................
klist ............
...................
..................................................................................
..................................................................................
..................................................................................
result .......................................................................
.....................................................................................
.....................................................................................
.....................................................................................
..................
...................
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
.................
...................
.....................................................................................
.....................................................................................
.....................................................................................
.....................................................................................
Page | 4
............. 30............... 30............... 30............... 30
............. 31............... 31............... 31............... 31
............. 31............... 31............... 31............... 31
........... 33
............. 33
............. 33............... 33............... 33............... 33
............. 34............... 34............... 34............... 34
............. 34............... 34............... 34............... 35
............. 35............... 35............... 35............... 35
1 SC
This doproceduof a solaThe Figufinal consolar PVsets are
The FiguDistributtests. Ho
before tDependtests as
COPE
cument proures as descrar PV plant inure 1 shows nnection to V plant and wnecessary, w
F
ure 1 showstion Directoowever, EWA
Inspect test and
install the m
the solar PV ping on the cashown in the
ovides the cribed in the In order to cothe general the electric
we may see twhile for larg
igure 1 – Seq
s also that torate (EDD), A/EDD shall:
and approve
meters
plant can beapacity Pn oe following T
check‐lists tnspection anonnect it to thsequence ofnetwork. Thhat for plantger plants fo
quence of th
the Applicanor the Mun
e the installa
energized.f the Solar PTable 1.
o be used nd testing Guhe public Elef the testing he number ats whose nomur test sets a
he testing ac
nt ‐ under tnicipality for
ation as per t
PV plant the
to implemeuidelines [4]ectric Netwoactivities fro
and type of tminal powerare required
tivities for s
the eventua the Mecha
the Regulatio
Applicant sh
ent the Inspto be adoptrk in Bahrainom the end otests dependPn is up to 1.
olar PV plan
l supervisionnical Inspect
ons for Elect
hall carry out
pection andted after the n [1]. of constructds on the siz100 kW only
nts
n of EWA Ection ‐ shall
trical Installa
t the inspect
Page | 5
d Testing erection
ion to its ze of the two test
Electricity make all
tions [2],
tions and
D
LdrTaddr
M(s
IninarCCA
InPfuP
AhAm
(§) (*)
t(^) Furthermreported
Table
Description
Layout, SLD, drawings, etc.
Technical repodditional diagrawings, etc.
Mechanical insseparate inspe
nspection – genspection before carried out
Category 1 testCategory 2 testAdditional test
nterface protecPerformance munctions
Performance ra
Assessment of armonic conte
Additional measurements report to beno check listthe performif required a
more, accordd.
1 – Main ste
datasheets,
ort and grams,
spection ection)
eneral ore all tests
t regime t regime ts
ction monitoring
atio P
f the ent
delivered wt is providedance of thesfter assessm
ding to the d
eps of the Ins
Pn ≤ 11 kWSyst
X
-
Mecha-
Test withX
X - -
Test wiX X
X Power Quality
-
-
with the resuld in the presse tests, as wment of the h
description in
spection and
Capacity oW 11 kWtem document
anical Inspect
hout interconn
Faith interconnec
y measuremen
lts of the inssent documewell as on theharmonic con
n [4], the che
d Testing of t
of the Solar PVW < Pn ≤ 100ktation
X
X
tion (§) -
nection (§) X
X -
acultative (*)ction (§)
X X
X nts and tests (§
-
-
pections andent: contracte reporting antent in Erro
ecklists for t
the Solar PV
V plant (Pn) kW P
RecoFac
§)
d tests tor and custnd the deliver! Reference
he solar PV
V plants
Pn >100kW
X
X
X
X
X ommended (*)cultative (*)
X X
X
X
X (^)
tomer shall ery of the ree source not
plant design
Page | 6
)
agree on esults found.
n are also
2 FO
2.1 R
[1]
[2]
[3]
[4] [5] [6]
[7]
[8] [9] [10] [11] [12]
[13]
2.2 T
Active instantaactive poApparenelementVA. UndCable tyenvironm“H07RNData sheproduct Global hexpresseIMOD_MAX
This is oInspectiselectionIn‐planeupon anarray (PO
OREWORD
Reference
EWA – Stannetworks ofMinistry of electrical insEWA – Guidnetworks ofEWA – InspeIEC 60364‐6IEC 61010 –laboratory uIEC 61557 – d.c. IEC 61724‐1IEC 61724‐2IEC 61724‐3IEC 61730‐2IEC 62446‐1maintenancinspection IEC 62548 –
Terms and
power (P) neous prodower is the rnt power (St or two‐termder sinusoidaype – descrment to be F”) eet – basic pmanual) horizontal ired in W/m2
X_OCPR – PV mften specifieon – examinn and propee irradiance n inclined surOA) irradian
D
documen
ndards for Sf the KingdomElectricity
stallations (Sdelines for Sf the Kingdomection and Te – Low volta– Safety requse Electrical sa
– Photovolt – Photovolt – Photovolt – Photovolt1 – Photovoe. Part 1: G
Photovoltaic
d definitio
– under peuct of currereal part of tS) – productminal circuit al conditions,ription of a determined
product desc
rradiance (G
odule maximed by modulenation of an er erection of(Gi or POA) rface parallece. It is expr
nts
Solar PV Systm of Bahrainand Water,Second editioolar PV system of Bahrainesting Guidege electrical quirements f
fety in low v
aic system paic system paic system paic (PV modoltaic (PV) syGrid connect
c (PV) arrays
ns
eriodic condent and volthe complex t of the r.mand the r.m, the apparencable to en
d (Note: In
cription and s
GHI) – direct
mum overcure manufactuelectrical insf electrical eq– the sum ofl to the planeessed in W/m
tems to be n Electricity on, 2004) ems to be Con elines installationsfor electrica
voltage distri
performanceperformanceperformanceule safety quystems. Reqion systems
s. Design req
ditions, meatage expresspower. m.s. voltage m.s. electric cnt power is tnable its ramany coun
specification
plus diffuse
rrent protectrers as the mstallation usiquipment f direct, diffue of the modm2
connected
Distribution
onnected ion
s. Part 6: Verl equipment
ibution syste
. Part 1: Mon
. Part 2: Cap
. Part 3: Eneualification. Pquirements . Document
uirements
an value, tased in W. U
between tcurrent in thethe modulusting and suntries this is
n (Note: Typi
e irradiance
tion rating dmaximum serng all the sen
use, and grodules in the P
in parallel w
n Directorate
n in parallel
rifications t for measu
ems up to 10
nitoring acity evaluatrgy evaluatioPart 2: Requfor testing, ation, comm
aken over Under sinuso
he terminale element or of the compitability for s done via a
cally one or
incident on
etermined bries fuse ratinses in order
und‐reflectePV array, also
with the dis
e – Regulat
with the dis
rement, con
000 V a.c. an
tion methodon method irements fordocumenta
missioning, t
one periodoidal conditi
s of a two‐r circuit expplex power. a particulaa code num
two pages,
a horizonta
by IEC 61730ing) r to ascertai
ed irradianceo known as p
Page | 7
tribution
tions for
tribution
ntrol and
d 1500 V
d
r testing tion and tests and
, of the ions, the
‐terminal ressed in
r use or mber e.g.
not a full
l surface
‐2 (Note:
n correct
e incident plane‐of‐
Interfacplant andegradeInverteralternatIrradianIrradiatiPoint ofdistributPower fapparenPV arrayPV cell conversiPV modPV strinPV strinovercurrRecord –
RecordinReport –ReportinReportinResiduacurrent Sample SamplinSoiling rthe powSwitch –conditiofor a spconditioStandarjunctionTesting effectiveinstrumeVerificatrelevantstandardVoltage voltages
e Protectionnd/or any gee the safety ar – electric eing current ce (G) – incidion (H) – irraf Connectiontion networkfactor (λ) – unt power S y – assembly– most elemion of radianule – smalleg – circuit ofng combinerrent protecti– data record
ng interval (– aggregate vng period – tng – recordinl current deexceeds the – data acquing interval – ratio (SR) – rwer that wou– Mechanicaons and, whepecified timeons. d test condn temperatur– impleme
eness is proents, said vation – all mt ds is checked‐ Unless stas.
n (IP) ‐ The enerating unand reliabilitynergy conve
dent flux of adiance integn or POC ‐ Is k and where under period
y of electricamentary devnt energy intst complete f one or morr box – juncion devices, ded and stor
) – time betvalue based time betweeng of the resevice (RCD) operating vaired from a stime betweeratio of the ald be expectal device caen specified, e, currents
ditions (STC)re (25 °C), anentation of ved (Note: lues not beinmeasures by
d ated otherwi
electrical prnit is disconny of the distrrter that cha
radiant powegrated over athe location the main eleic conditions
lly interconnice that exho electrical eenvironmene series‐conction box whelectronics ared in data lo
tween recoron series of en reports ults of inspe– is a sensialue of the dsensor or meen samplesactual powered if the PV apable of main given opeunder speci
) – referencnd the referemeasures It includes ang detectably means of
ise, voltage
rotection reqnected for aribution netwanges direct
er per unit aa specified tiat which a ectricity mets, ratio of th
nected PV mohibits the phenergy ntally protectnected PV mhere PV striand/or switcog, based on
ds records
ection and teitive safety device easuring dev
r output of tarray were caking, carryerating overloified abnorm
ce values ofence spectralin an electascertaining le by inspectwhich comp
refers to the
quired to enany event thwork. electric curr
rea expresseme interval solar PV genter is installee absolute v
odules, PV stotovoltaic e
ted assemblymodules ngs are conch‐disconnecn acquired sa
esting device that
ice
he PV array clean and freing and breoad conditiomal circuit c
f in‐plane irrl irradiance dtrical instalvalues by mtion) pliance of t
e root‐mean
nsure that ehat could im
rent to single
ed in W/m2 expressed inerating pland. alue of the a
trings or PV sffect, i.e the
y of intercon
nnected whictors mples
switches of
under given ee of soiling aking currenons. In additioconditions, s
radiance (1 defined in IEClation by mmeans of ap
he electrica
‐square valu
either the gempair the int
e‐phase or p
n kWh/m2 nt is connecte
active power
sub‐arrays. e direct non
nnected PV c
ch may also
ff when the
soiling cond
nts in normon, it is able such as sho
000 W/m2)C 60904‐3 means of wppropriate m
al installatio
ue of phase‐
Page | 8
enerating egrity or
olyphase
ed to the
r P to the
‐thermal
ells
o contain
residual
ditions to
al circuit to carry,
ort‐circuit
, PV cell
which its measuring
n to the
to‐phase
3 SO
3.1 P
3.1.1 The folloplants u
3.1.2 A positiv
3.1.3
Solar P Basic sysProject idRated syskVA ACPV modu(manufacInstallatioCommissCustomeSite addr System dSystem dSystem dSystem dtelephone System inSystem inSystem inSystem intelephone Wiring d
Suitable Array – GPV stringPV arrayAC systeEarthing Other de
Planimet
OLAR PV
PV plants
Description
owing form ip to 11 kW a
Pass/fail cri
ve final resul
Checklist
PV Design
stem informatdentification rstem power (k
C) ules and invercturers, modelon date sioning date r name
ress
designer infordesigner, Comdesigner, contadesigner, postae, e-mail
nstaller informnstaller, Compnstaller, contanstaller, postae, e-mail
diagram Field
and readable fGeneral specifg information y electrical detem
and overvolta
esign informatField
try and String
DESIGN C
up to 11 k
s used to vaas described
iteria
lt requires th
n Check-l
tionreference kW DC and
ters ls, quantity)
rmation mpany
act person al address,
mation pany act person al address,
format fications
tails
age protection
tion
layout
CHECK-L
kW
lidate the doin the docum
hat only Yes o
list – Pn ≤
Yes Yes
Yes
Yes Yes Yes Yes
Yes Yes Yes
Yes Yes Yes
Yes Compl Compl Compl Compl
n Compl
Yes
IST
ocumentatioment EWA –
or Complete
≤ 11 kW
No No No
No
No No No No
No No No
No No No
Result / V No lete No lete No lete No lete No lete No
Result / V No
n at design A– Inspection a
or Not Appl
ot applicable
Value
Value
Approval stagand Testing G
icable boxes
ge for solar Guidelines [4
s are checked
Notes
Notes
Page | 9
PV 4].
d.
Solar P DatasheeIP (if appMechanicEmergenShading Esteem oproductio OperatioAll appli
Final r
3.2 A
3.2.1 The folloplants a
3.2.2 A positiv
3.2.3
Solar P Basic sysProject idRated syskVA ACPV modu(manufacInstallatioCommissCustomeSite addr System dSystem dSystem dSystem dtelephone System inSystem inSystem in
PV Design
et – PV modulplicable) cal design info
ncy system diagram
of the yearly eon
on and maintecable items
result
Above 11 k
Description
owing form ibove 11 kW
Pass/fail cri
ve final resul
Checklist
PV Design
stem informatdentification rstem power (k
C) ules and invercturers, modelon date sioning date r name
ress
designer infordesigner, Comdesigner, contadesigner, postae, e-mail
nstaller informnstaller, Compnstaller, conta
n Check-l
les, Inverters,
formation
nergy
enance inform
kW
s used to vaas described
iteria
lt requires th
n Check-l
tionreference kW DC and
ters ls, quantity)
rmation mpany
act person al address,
mation pany act person
list – Pn ≤
Yes
Yes Yes Yes Yes
mation Yes
Pass
lidate the dod in the docu
hat only Yes o
list – Pn >
Yes Yes
Yes
Yes Yes Yes Yes
Yes Yes Yes
Yes Yes
≤ 11 kW
No
No No No No No
No
sed N
ocumentatioument EWA –
or Complete
> 11 kW
No No No
No
No No No No
No No No
No No
ot applicable
Not passed
n at design A– Inspection
or Not Appl
ot applicable
Approval stagand Testing
icable boxes
P
ge for solar Guidelines [
s are checked
Page | 10
PV [4].
d.
Solar P System intelephone Technica
PreliminaForewordInput datCharacteand equipSystem adimensioDC sectioAC sectioCivil andShading Performa Wiring d
Suitable Array – GPV stringPV arrayAC systeEarthing Other de
PlanimetDatasheeIP MechanicEmergen OperatioAll appli
Final r
PV Design
nstaller, postae, e-mail
al report Field
ary informatiod (or differentta ristics of the mpment architecture anoning on on
d mechanical idiagram
ance calculatio
diagram Field
and readable fGeneral specifg information y electrical detem
and overvolta
esign informatField
try and String et – PV modul
cal design infoncy system
on and maintecable items
result
n Check-l
al address,
on tly named)
main devices
nd
installation
on
format fication
tails
age protection
tion
layout les, Inverters,
formation
enance inform
list – Pn >
Yes
Compl Compl Compl Compl
Compl
Compl Compl Compl Compl Compl
Yes Compl Compl Compl Compl
n Compl
Yes Yes
Yes Yes
mation Yes
Pass
> 11 kW
No
Result / Vlete No lete No lete No lete No
lete No
lete No lete No lete No lete No lete No
Result / V No lete No lete No lete No lete No lete No
Result / V No No
No No No
No
sed N
Value
Value
Value
ot applicable
Not passed
P
Notes
Notes
Notes
Page | 11
4 ME
Mechan
4.1 O
The purpas the inIt is imInterconThe chec
4.2 G
4.2.1 This parMechan
4.2.2 A positivStreet naParticipaindicate
4.2.3
Mecha General Name of Nominal P.O. BoxStreet namLocation City Voltage dPOC PV moduBuilding
ECHANICA
nical Inspecti
Overview
pose of the Mntegrity of alportant to nnection, whcklist is com
General on P
Documents
Civil works a
PV modules
Electrical eq
Mechanical
General on
Description
rt refers to nical Inspecti
Pass/fail cri
ve final resuame and numants indicated if not alrea
Checklist
anical Insp
on PV plant f the PV plant
Power [kW] x me and numb
n / Area
delivery
ule installationinstallation (i
AL INSPE
on applies to
Mechanical Il equipmentkeep this i
hich is focuseposed by the
PV plant and
required Che
and Support
Checklist
quipment ins
Inspection F
n PV plan
the generalon.
iteria
lt requires tmber that med as Facultady present.
spection C
ber
n if applicable)
ECTION C
o solar PV pla
Inspection isand their conspection loed on the elee following d
d Participants
ecklist
structures C
tallation and
Final result
t and Part
l data of th
hat all itemsay be alternatative may b
Check-list
240 V
On bui Flat ro
CHECKLIS
ants with Pn
s to verify theorrect displacogically sepectrical partsdocuments:
s Checklist
Checklist
d protection
rticipants
e PV plant
s are filled wative each otbe omitted
(1 phase)
ilding Otooftop Ro
STS
> 100 kW.
e mechanicacement. arated from.
Checklist
and to the
with correct ither. if they are
415 V (3 ph
her structure (oof flap F
al integrity of
m the subse
data of the
nformation,
not present
ases) 11
(e.g. canopy) açade Oth
P
f the PV plan
equent Test
e participant
except P.O.
t. Affiliation
kV (3 phases
Ground ther
Page | 12
nt as well
without
ts to the
Box and
shall be
s)
Mecha Building
Area of tPV techn
Tracking Participa
Test engiInstaller DesignerInspectorInspectorInspector
Result
4.3 D
4.3.1 This part
4.3.2 A positiv
4.3.3
Mecha Documen
Final desvariationDeclaratiCommunfrom EWNotificatiApplican
Result
anical Insp
type (if appli
the PV array [nology
g system if any
ants Role
ineer (mandat(mandatory) r (facultative) r (facultative) r (facultative) r (facultative)
t
Document
Description
t refers to th
Pass/fail cri
ve final resul
Checklist
anical Insp
nts required Field
sign or As-buins ion of Conform
nication of avaWA
ion of the datent
t
spection C
cable)
m2]
y
tory)
ts required
he document
iteria
lt requires th
spection C
d ilt design in ca
mity ailable periods
es from the
Check-list
Villa o School Hotel/R Detent
Mono- Thin-f No trac
d
ts required o
hat all Yes bo
Check-list
Rease of Ye
Yes Ye
Ye
or small housel/University Restaurant tion/Correctio
-crystalline silfilm (specify) acking Sin
Name
Pas
on‐site to pe
oxes are prop
esult / Valuees No
es No es No
es No
ehold Apa Healthcar
Entertainmonal Other
licon Mu. . . . . . . . .
ngle-axis track
ssed N
rform the M
perly checke
Passed
artment block e/Hospital ent Agricr . . . . . . . . . .
lti-crystalline Other (spec
king Two
Independe
Not passed
echanical Ins
d.
No
Not pa
P
k Offices Industrial
cultural/Stable. . . . . . . . . . .
silicon cify) . . . . . . . o-axes tracking
Affiliation ent licensed e
EWA
d
spection.
otes
assed
Page | 13
e . .
. . . . g
engineer
4.4 C
4.4.1 With refto the dof comp
4.4.2 A positiv
4.4.3
Mecha Civil wor
FoundatideterioraStructuratolerancePlacemenfoundatioGeneral cand relateWaterproRoof inteprotectiomountingAccess dVentilatioof the cabIntegrity conduits Support sField Mountingand of fixCondition(damagesloss of gacorrosionPlanaritysupportinInclinatiothe toleraBolts andcorresponcheck)
Result
Civil works
Description
ference to 10rawings andponents and
Pass/fail cri
ve final resul
Checklist
anical Insp
rks Field
ons (state, breation of the sural alignments: es set by designt of inserts anons and precasconditions of ed foundationoofing of the cegrity and ingrn (water proog system to th
doors of the caon grills / air bins and layout of
structures
g of supportinxation elemenn of the comps, defects, welalvanic protecn) y of the PV mong structures (on of PV modances set in thd tightening tonding to desig
t
s and Sup
00% of the id design documaterials. Th
iteria
lt requires th
spection C
eakage, rface) within the
gn nd holes in st the cabins
ns cabins ress f) of e roof
abins conditioning
f cableways /
ng structures nts ponents ld quality,
ction,
odules (arrows, sags) dules: within he design orque gn (sample
pport stru
nstallation, tuments regahe following
hat only Yes o
Check-list
Resu Yes
Yes
Yes
Yes
Yes Yes
Yes Yes
Yes
Result / V Yes
Yes
Yes
Yes
Yes
Passe
uctures
this part refearding the qu checks shall
or N/A boxes
ult / Value No N/A
No N/A
No N/A
No N/A
No N/A No N/A
No N/A No N/A
No N/A
Value No N/A
No N/A
No N/A
No N/A
No N/A
ed No
ers to the veuantity, typel be perform
s are checke
A
A
A
A
A A
A A
A
NotesA
A
A
A
A
ot passed
erification of e, sizing, instaed.
d.
No
P
f the correspallation and
otes
Page | 14
pondence integrity
4.5 P
4.5.1 With refto the dof comp
4.5.2 A positiv
4.5.3
Mecha Visual in
Mechanicmodules incompleIntegrity modules discoloraLabeling Fixation Bolts andcorresponsample bNo obstrumodule Quality oField TighteninCorrect in(clamps, narrow, eAssemblyconnecto
Result
4.6 E
4.6.1 With refto the dof comp
4.6.2 A positiv
PV module
Description
ference to 10rawings andponents and
Pass/fail cri
ve final resul
Checklist
anical Insp
nspection of PField
cal integrity o(faults, break
ete assembly) functional pa(delamination
ation, dirt, etc. of modules system
d tightening tonding to desigasis) uctions shadin
of cabling
ng of cable glanstallation of sharp edges, f
etc.) y and crimpin
ors
t
Electrical e
Description
ference to 10rawings andponents and
Pass/fail cri
ve final resul
es
00% of the id design documaterials. Th
iteria
lt requires th
spection C
PV modules
of the downs or
arts of the n, .)
orques gn (on a
ng any PV
ands DC cables folds too
ng of plug-in
equipmen
00% of the id design documaterials. Th
iteria
lt requires th
nstallation, tuments regahe following
hat only Yes o
Check-list
Resu Yes
Yes
Yes Yes Yes
Result / V Yes Yes
Yes
nt installa
nstallation, tuments regahe following
hat only Yes o
this part refearding the qu checks shall
or N/A boxes
ult / Value No N/A
No N/A
No N/A No N/A No N/A
Value No N/A No N/A
No N/A
P
ation and p
this part refearding the qu checks shall
or N/A boxes
ers to the veuantity, typel be perform
s are checke
A
A
A A A
NotesA A
A
Passed
protection
ers to the veuantity, typel be perform
s are checke
erification of e, sizing, instaed.
d.
No
Not pass
n
erification of e, sizing, instaed.
d.
P
f the correspallation and
otes
sed
f the correspallation and
Page | 15
pondence integrity
pondence integrity
4.6.3
Mecha Electrica
PositionicombinerPV stringInstallatiocable shePositioniequipmenswitchgeMechanicequipmenSwitch-dvisible answitch podesign) Emergencall pointof PV plahazard buabove flo ProtectioField IP degreecombinerInstallatiocombinerInstallatioconnectoequipmenPositioniconduits ladders Protectiv(polyuretinlets of cand insecLabeling equipmen
Result
Checklist
anical Insp
al equipment iField
ng and fixatior boxes for cogs on of racewayeaths string ng in the cabint: inverters, tar, etc. cal integrity ont (e.g. faults,
disconnectors ond reachable (osition accord
ncy remote cont) to disconneant (ordinary uildings, min.oor)
on of assemble
e of equipmenr boxes, etc. on of equipmer boxes, etc. on of cable gl
ors related to thnt ng of cable duon metallic ca
ve measures agthane foam to conduits and octs (anti-insect of cables, cabnt
t
spection C
installation
on of string onnection of
ys and/or
ins of the transformers,
of the said , breaks) on DC side (all buildings, ding to
ntrol (manual ct a portion and higher eight 1.1 m
led componen
nt, string
ent, string
lands and he above
ucts / ableways /
gainst rodentsobstruct
of cabins) t grilles) ble ducts and
Check-list
Resu Yes
Yes
Yes
Yes
Yes
Yes
ts (IP degree)Result / V
Yes
Yes
Yes
Yes
Yes
Yes
ult / Value No N/A
No N/A
No N/A
No N/A
No N/A
No N/A
) Value
No N/A
No N/A
No N/A
No N/A
No N/A
No N/A
P
A
A
A
A
A
A
NotesA
A
A
A
A
A
Passed
No
Not pass
P
otes
sed
Page | 16
4.7 M
4.7.1 This part
4.7.2 The Megive pos
4.7.3
Mecha Participa
Test engi Installer Designer Inspector Inspector Inspector Notes
Final r
Mechanica
Description
t reports the
Pass/fail cri
chanical Inspsitive result (
Final result
anical Insp
ants Role
ineer (mandat
(mandatory)
r (if present)
r (if present)
r (if present)
r (if present)
result
al Inspect
e final outcom
iteria
pection will Passed).
page
spection F
tory)
ion Final
me of the M
be successf
Final resul
result
echanical Ins
ful (Passed)
lt
Name
Pas
spection.
if all the che
ssed N
ecklists in th
Not passed
P
he above do
Signatur
d
Page | 17
ocuments
e
5 TE
Test wit
5.1 O
The purrequiremThe chec
5.2 G
5.2.1 This parwithout
5.2.2 A positivStreet naParticipaindicate
5.2.3
Test w General Name of Nominal P.O. BoxStreet naLocationCity Voltage dPOC PV moduBuilding Building
Area of t
EST WITH
hout interco
Overview
pose of the ments of thecklist is com
General on P
Documents
DC system in
AC system in
Labelling an
PV array tes
Test without
General on
Description
rt refers to tInterconnec
Pass/fail cri
ve final resuame and numants indicated if not alrea
Checklist
without Int
on PV plant f the PV plant
Power [kW] x ame and numbn / Area
delivery
ule installationinstallation (itype (if appli
the PV array [
OUT INTE
onnection ap
Test withou PV plant beposed by the
PV plant and
required Che
nspection Ch
nspection Ch
d Identificat
t report Che
t Interconne
n PV plan
the general dction.
iteria
lt requires tmber that med as Facultady present.
terconnec
ber
n if applicable) icable)
m2]
ERCONNE
plies to all so
ut Interconnefore its conne following d
d Participants
eck‐list
heck‐list
heck‐list
ion Check‐lis
ck‐list
ection final re
t and Part
data of the
hat all itemsay be alternatative may b
ction Chec
240 V
On bui Flat ro Villa o School Hotel/R Detent
ECTION C
olar PV plant
ection is to vnection to thdocuments:
s Check‐list
st
esult
rticipants
PV plant and
s are filled wative each otbe omitted
ck-list
(1 phase)
ilding Otooftop Roor small housel/University
/Restaurant tion/Correctio
CHECKLIS
ts.
verify and tee grid.
d to the dat
with correct ither. if they are
415 V (3 ph
ther structure (oof flap Fehold Apa Healthcar
Entertainmonal Othe
ST
est the safet
a of the par
nformation,
not present
hases) 11
(e.g. canopy) açade Otartment blocke/Hospital
ment Agricr . . . . . . . . . .
P
ty and the fu
rticipants to
except P.O.
t. Affiliation
kV (3 phases
Ground ther k Offices
Industrial cultural/Stable. . . . . . . . . . .
Page | 18
unctional
the Test
Box and
shall be
s)
e . . .
Test w PV techn
Tracking Participa
Test engiInstaller DesignerInspectorInspectorInspector
Result
5.3 D
5.3.1 This part
5.3.2 A positiv
5.3.3
Test w Documen
Final descase of vDeclaratiCommunperiods fNotificatApplicanMechaniPn>100 k
Result
5.4 D
5.4.1 The purpIEC 6036
without Int
nology
g system if any
ants Role
ineer (mandat(mandatory) r (facultative) r (facultative) r (facultative) r (facultative)
t
Document
Description
t refers to th
Pass/fail cri
ve final resul
Checklist
without Int
nts required Field
sign or As-buivariations ion of Conform
nication of avafrom EWA tion of the datent cal InspectionkW )
t
DC system
Description
pose of this 64‐6 and IEC
terconnec
y
tory)
ts required
he document
iteria
lt requires th
terconnec
ilt design in
mity ailable
es from the
n Report ( if
m inspecti
document is62548.
ction Chec
Mono- Thin-f No tra
d
ts required o
hat only Yes o
ction Chec
Resul Yes N
Yes N Yes N
Yes N
Yes N
on
s to check th
ck-list
-crystalline silfilm (specify) acking Sin
Name
Pas
on‐site to pe
or N/A boxes
ck-list
lt / Value No
No No
No
No N/A
Pa
hat the entire
licon Mu. . . . . . . . .
ngle-axis track
ssed N
rform the Te
s are checke
assed
e DC system
lti-crystalline Other (spec
king Two
Independe
Not passed
est without In
d.
No
Not passe
has been ins
P
silicon cify) . . . . . . . o-axes tracking
Affiliation dent licensed e
EWA
d
nterconnect
otes
ed
spected acco
Page | 19
. . . . g
engineer
ion
ording to
5.4.2 A positiv
5.4.3
Test w DC syste
The DC sand insta60364 anThe maxthe array All systestructurewithstandsuch as wcorrosionRoof fixiweatherp DC systeField
Protectivvoltage (
Protectioinsulation
DC systeField Galvanicinverter o
Function
PV ArraydetectionrequiremPV Arraydetectionrequirem DC systeField For systeprotectivmaximumthe possibFor systeprotectivaccommocurrent fr
Pass/fail cri
ve final resul
Checklist
without Int
em – general F
system has bealled to the reqnd IEC 62548 imum PV arra
y location m components have been sed the expectedwind, sandstorn ings and cableproof (where a
em – Protectio
ve measure proSELV / PELV
on by use of cln adopted on t
em – Protectio
c separation inor on the AC s
nal earthing of
y Earth Insulan and alarm sy
ments of IEC 6y Earth Residun and alarm sy
ments of IEC 6
em – Protectio
ems without stve device: IMOD
m series fuse rble reverse cu
ems without stve device: strinodate the max
from parallel s
iteria
lt requires th
terconnec
ield een designed, quirements of
ay voltage is s
ts and mountinelected and erd external inflrm, temperatu
e entries are applicable)
on against ele
ovided by extrV)
lass II or equivthe DC side
on against the
n place inside tside
f any DC cond
ation Resistancystem is instal2548 ual Current M
ystem is instal2548
on against ove
tring overcurrD_MAX_OCPR (thrating) is greaurrent tring overcurrng cables are sximum combintrings
hat only Yes o
ction Chec
specified IEC
suitable for
ng rected to uences re and
ectric shock
ra low
valent
e effects of ins
the
ductor
ce led – to the
Monitoring led – to the
ercurrents
ent he module ater than
ent sized to ned fault
or N/A boxes
ck-list
Result Yes N
Yes N
Yes N
Yes N
Result / Valu Yes N
(alternative toone)
Yes N(Alternative tprevious one)
sulation faultResult / Valu
Yes N(informative)
Yes N(Informative)
Yes N
Yes N
Result / Valu Yes N
Yes N
s are checke
t / Value No
No
No
No N/A
ueNo
o the next
No to the )
ts ue
No )
No )
No
No
ueNo N/A
No N/A
d unless diff
Notes
Notes
Notes
P
ferently indic
Notes
Page | 20
cated.
Test w For systedevice: sare fittedrequiremFor systeprotectivdevices arequiremFor systea DC bacback-feedmodule mcable am DC systeField Where thearthing functionaand insta62548 Where a earth on tinterrupteIEC 6254Array fraspecifiedIEC 6254Where prbonding parallel t DC systeField To minimthe area osmall as pMeasures(e.g. screWhere SPinstalled DC systeField The PV mpossible All DC coperationDC systeIEC 6254
without Int
ems with stringtring overcurr
d and correctlyments of IEC 6ems with arrayve devices: oveare fitted and c
ments of IEC 6ems where theck-feed into thd current is lomaximum fuse
mpere rating
em – Earthing
he PV system of one of the Dal earth connealled to the req
PV system hathe DC side: aer is provided48 ame bonding ad and installed48 rotective earthconductors ar
to, and bundle
em – Protectio
mize voltages of all wiring lopossible s are in place
eening or the uPDs are fittedto the require
em – Selection
modules are raDC system vo
components arn at DC and atem voltage and48
terconnec
g overcurrent rent protectivey specified to t2548
y / sub-array oercurrent protcorrectly spec2548
e inverter(s) cahe PV array ciower than bothe rating and th
g and bonding
includes funcDC conductor
ection has beenquirements of
as a direct cona functional ea
d to the require
arrangements d to the require
hing and/or eqre installed: thed with, the DC
on against the
induced by ligoops has been
to protect lonuse of SPDs) d, they have beements of IEC
n and erection
ated for the moltage re rated for cot the maximumd current as de
ction Chec
protective e devices the
overcurrent ective
cified to the
an produce ircuits: any h the he string
g arrangemen
tional rs: the n specified IEC
nnection to arth fault ements of
have been ements of
quipotential hey are C cables
e effects of lig
ghtning, n kept as
g cables
een 62548
n of electrical
maximum
ntinuous m possible efined in
ck-list
Yes N
Yes N
Yes N
nts Result / Valu
Yes N
Yes N
Yes N
Yes N
ghtning and oResult / Valu
Yes N
Yes N
Yes N
l equipment Result / Valu
Yes N
Yes N
No N/A
No N/A
No N/A
ueNo N/A
No N/A
No
No N/A
vervoltage ue
No
No
No
ueNo
No N/A
Notes
Notes
Notes
PPage | 21
Test w Wiring syerected toinfluencesolar radiMeans ofbeen provsub-arrayA DC swside of th62548 If blockinvoltage rPV string62548) Plug andof the sammanufactrequirem
Result
5.5 A
5.5.1 The pur60364‐6
5.5.2 A positiv
5.5.3
Test w AC syste
Means ofprovidedAll isolatconnectethe “load“source” Where anfeeding averified taccordingInvertersfor Solar
without Int
ystems have bo withstand thes such as winiation f isolation andvided for the Pys – to the req
witch disconnehe inverter to t
ng diodes are rating is at leasg in which the
d socket conneme type and frturer and com
ments of IEC 6
t
AC system
Description
pose of this6 and IEC 625
Pass/fail cri
ve final resul
Checklist
without Int
em – General F
f isolating thed on the AC sidtion and switc
ed such that PVd” side and the
side n RCD is instaan inverter, theto ensure it hag to the requir
s are fully comr PV Systems
terconnec
been selected he expected exnd, temperatur
d disconnectioPV array strin
quirements of Iector is fitted tthe requireme
fitted, their rest 2 × Voc (stc
ey are fitted (s
ectors mated tofrom the same
mply with the 2548
m inspecti
document i548.
iteria
lt requires th
terconnec
ield e inverter has bde ching devices V installation e public suppl
alled to the ACe RCD type h
as been selecterements of IEC
mpliant to the s
ction Chec
and xternal re, UV and
on have ngs and PV IEC 62548 to the DC ents of IEC
everse c) of the ee IEC
ogether are
on
is to check t
hat only Yes o
ction Chec
been
have been is wired to y to the
C circuit has been ed C 62548 standards
ck-list
Yes N
Yes N
Yes N
Yes N
Yes N
Passed
that the AC
or N/A boxes
ck-list
Result Yes N
Yes N
Yes N
Yes N
No N/A
No N/A
No N/A
No N/A
No N/A
Not p
system has
s are checke
t / Value No
No
No N/A
No
passed
been inspec
d unless diff
P
cted accordin
ferently indic
Notes
Page | 22
ng to IEC
cated.
Test w Interfaceinverter(sInterfacethe standInterfacefor SolarBackup istandardAn UPS system is
Result
5.6 L
5.6.1 The puraccordin
5.6.2 A positiv
5.6.3
Test w Labelling
All circuterminalsof IEC 60All DC juarray boxthat activa PV arrafrom the Means oflabelled Dual supof intercoA single site Installer ShutdowEmergen(where reAll signsdurable
without Int
e protection (IPs)
e protection (IPdards for Solare device is comr PV Systems interface devic
ds for Solar PVto support the
s present
t
Labelling a
Description
pose of this ng to IEC 603
Pass/fail cri
ve final resul
Checklist
without Int
g and identifiF
uits, protectives suitably labe0364 and IECunction boxesxes) carry a wve parts insideay and may stiPV inverter af isolation on
pply warning lonnection line wiring di
details are diswn procedures ncy procedureselevant) s and labels ar
terconnec
P) is external
P) is fully comr PV Systems
mpliant to the
ce is complianV Systems e Interface pro
and ident
document is364‐6 and IEC
iteria
lt requires th
terconnec
ication ield
e devices, switelled to the req
C 62548 s (PV generato
warning label ine the boxes areill be live afte
and public supthe AC side is
labels are fitte
iagram is disp
splayed on siteare displayed s are displaye
re suitably affi
ction Chec
to
mpliant to
standards
nt to the
otection
ification
s to check thC 62548.
hat only Yes o
ction Chec
tches and quirements
or and PV ndicating e fed from er isolation pply s clearly
d at point
played on
e on site
d on site
ixed and
ck-list
Yes N(informative)
Yes N
Yes N
Yes N
Yes N
Passed
hat the label
or N/A boxes
ck-list
Result Yes N
Yes N
Yes N
Yes N
Yes N
Yes N Yes N Yes N
Yes N
No )
No
No
No N/A
No N/A
Not p
ls and warni
s are checke
t / Value No
No N/A
No
No
No
No No No N/A
No
passed
ng sign have
d unless diff
P
e been prope
ferently indic
Notes
Page | 23
erly used
cated.
Test w
Result
5.7 P
5.7.1 The purpEach copparallel PV arrayIn case number indepenindicate
5.7.2 An analy
5.7.3
Test w PV Arra
PV array String
Array parametespecifiedString overcurreprotectivdevice String wi
String tes
without Int
t
PV array te
Description
pose of this dpy of the docon the samey shall be indof more thaof indepen
ndent PV arrd for each PV
Pass/fail cri
ysis of the m
All check bo
Sting overcu
Array isolato
String wiring
Voc reading
The array in
Checklist
without Int
ay number:
y test report
StrinPV mQuan
ers (as d)
Voc-Isc-s
ent ve
TypeRatinDC rCapa
iring TypeCros
st Voc Isc [A
terconnec
est report
document iscument maye PV array adicated in thean one indepndent PV arrray are preseV array.
iteria
easured dat
xes are chec
urrent protec
ors fit the sp
g fit the spec
matches the
sulation resi
terconnec
ng reference module ntity -stc [V] stc [A]
e ng [A] rating [V] acity [kA] e ss-sect [mm2] [V] A]
ction Chec
t
s to report thy contain test progressivee heading. pendent PVrays, or to aent, will be
a shall be ma
cked Y or N/A
ction devices
ecific applica
cific applicati
e expected v
stance is hig
ction Chec
Sheet n
ck-list
Passed
he tests madts on up to fe Sheet numb
array be prea multiple oused. A diff
ade in order
A
s fit the spec
ation
ion
value
gher than the
ck-list
number:
1
Not p
e on all the sfive strings. Iber and the
esent, a numof them if merent progre
to check the
cific applicati
e minimum v
2
passed
strings of then case of mosame PV ar
mber of documore than fessive PV Ar
e following:
on
value require
3
P
e PV array. ore than fiverray number
uments equfive strings prray number
ed
4
Page | 24
stings in for each
al to the per each r shall be
5
Test w PV Arra
PV array
Polarity cArray insulationresistanc
Earth conArray iso
Inverter
Result
5.8 T
5.8.1 This part
5.8.2 The Tesdocume
5.8.3
Test w Participa
Test engi Installer Designer Inspector Inspector Inspector
without Int
ay number:
y test report
Irradcheck OK
n e
Test Pos –Neg
ntinuity (wherolator Ratin
RatinLocaFuncManSeriaFunc
t
Test witho
Description
t reports the
Pass/fail cri
st without Ients give pos
Final result
without Int
ants Role
ineer (mandat
(mandatory)
r (if present)
r (if present)
r (if present)
r (if present)
terconnec
diance [W/m2]
voltage [V] – Earth [M] – Earth [M]
re fitted) Nng [A] ng [V] ation ctional check uf. and modelal number ctioning OK
out Interco
e final outcom
iteria
nterconnectitive result (
page
terconnec
tory)
ction Chec
Sheet n
Y
] N/A Y
l
P
onnection
me of the Te
tion will be Passed).
ction Fina
ck-list
number:
Y N Y
Y N Y
Passed
n Final res
est without In
successful
al result
Name
Y N Y
Y N Y
Not pas
sult
nterconnect
(Passed) if
Y N
Y N
ssed
ion.
all the chec
P
Y N
Y N
cklists in th
Signatur
Page | 25
Y N
Y N
he above
re
Test w Notes
Final r
without Int
result
terconnec
ction Fina
al result
Passsed NNot passed
P
d
Page | 26
6 TE
Test witsolar PV
6.1 O
The purthe PV pThe chec
6.2 G
6.2.1 This parwithout
6.2.2 A positivStreet naParticipaindicate
6.2.3
Test w General Name of Nominal P.O. BoxStreet naLocationCity Voltage dPOC PV moduBuilding Building
Area of t
EST WITH
th interconnV plants > 100
Overview
pose of the plant after itscklist is com
General on P
Documents
Measureme
Performance
Test with Int
General on
Description
rt refers to tInterconnec
Pass/fail cri
ve final resuame and numants indicated if not alrea
Checklist
with Interc
on PV plant f the PV plant
Power [kW] x ame and numbn / Area
delivery
ule installationinstallation (itype (if appli
the PV array [
INTERCO
ection applie0 kW.
Test with Ints connectionposed by the
PV plant and
required Che
ent system ch
e Test Check
terconnectio
n PV plan
the general dction.
iteria
lt requires tmber that med as Facultady present.
connection
ber
n if applicable) icable)
m2]
ONNECTIO
es to all sola
terconnection to the grid.e following d
d Participants
eck‐list
heck‐list
k‐list (for PV
on final resul
t and Part
data of the
hat all itemsay be alternatative may b
n Check-l
240 V
On bui Flat ro Villa o School Hotel/R Detent
ON CHEC
ar PV plants
on is to verif
documents:
s Check‐list
plants > 100
lt
rticipants
PV plant and
s are filled wative each otbe omitted
list
(1 phase)
ilding Otooftop Roor small housel/University
/Restaurant tion/Correctio
CKLIST
. However, p
fy and test th
0 kW)
d to the dat
with correct ither. if they are
415 V (3 ph
ther structure (oof flap Fehold Apa Healthcar
Entertainmonal Othe
performance
he performa
a of the par
nformation,
not present
hases) 11
(e.g. canopy) açade Otartment blocke/Hospital
ment Agricr . . . . . . . . . .
P
e test only a
ance require
rticipants to
except P.O.
t. Affiliation
kV (3 phases
Ground ther k Offices
Industrial cultural/Stable. . . . . . . . . . .
Page | 27
pplies to
ments of
the Test
Box and
shall be
s)
e . . .
Test w PV techn
Tracking Participa
Test engiInstaller DesignerInspectorInspectorInspector
Result
6.3 D
6.3.1 This part
6.3.2 A positiv
6.3.3
Test w Documen
Final descase of vTest withreport OK for Tfrom EW
Result
6.4 S
6.4.1 This part
6.4.2 A positivFurtherm(A, B, or
with Interc
nology
g system if any
ants Role
ineer (mandat(mandatory) r (facultative) r (facultative) r (facultative) r (facultative)
t
Document
Description
t refers to th
Pass/fail cri
ve final resul
Checklist
with Interc
nts required Field
sign (or As-buvariations) hout Interconn
Test with InterWA
t
Sensors
Description
t describes t
Pass/fail cri
ve final resulmore, depenr C) the cells
connection
y
tory)
ts required
he document
iteria
lt requires th
connection
uilt design in
nection
rconnection
the sensors u
iteria
lt requires thnding on the related to th
n Check-l
Mono- Thin-f No tra
d
ts required o
hat only Yes o
n Check-l
Resul Yes N
Yes N
Yes N
used to perfo
hat only Yes oClass of the he used sens
list
-crystalline silfilm (specify) acking Sin
Name
Pas
on‐site to pe
or N/A boxes
list
lt / Value No
No
No
Pa
orm the Test
or N/A boxesmonitoring ors shall be
licon Mu. . . . . . . . .
ngle-axis track
ssed N
rform the Te
s are checke
assed
t with Interco
s are checkesystem or thproperly fille
lti-crystalline Other (spec
king Two
Independe
Not passed
est with Inter
d.
No
Not passe
onnection.
d. he measuremed.
P
silicon cify) . . . . . . . o-axes tracking
Affiliation dent licensed e
EWA
d
rconnection
otes
ed
ment system
Page | 28
. . . . g
engineer
adopted
6.4.3
Test wi List of sen
In-plane i
Global HoIrradiance
PV modu
Ambient a
Wind spe
Wind dire
Soiling ra
Array vol
Array cur
Array pow
Output vo
Output cu
Output po
Output en
Output po
Reduced l
System ourequest
Result
Checklist
ith Interco
nsors Sensor
irradiance (PO
orizontal e
le temperature
air temperatur
ed
ection
atio
ltage (DC)
rrent (DC)
wer (DC)
oltage (AC)
urrent (AC)
ower (AC)
nergy
ower factor
load demand
utput power fa
onnection
OA) Pyr Pho Este Pyr Pho Este
e MeaN/A
re Mea
MeaN/A
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
actor Yes
Pa
n Check-li
Type
anometer otodiode eemed anometer
otodiode eemed N/asured E
asured Es
asured E
s No
s No
s No
s No
s No
s No
s No
s No
s No
s No
s No
s No
assed
ist
A
PV Cell
PV Cell
/A Esteemed
steemed
Esteemed
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Not passe
Accuracy M
ed
Manufacturemodel
P
er and Ca
Ye
Ye N/
Ye N/ Ye
Ye N/ Ye N/ Ye N/ Ye N/ Ye N/ Ye N/ Ye N/ Ye N/ Ye
Ye
Ye N/ Ye N/ Ye N/
Page | 29
libration
es No
es No /A
es No /A es No
es No /A es No /A es No /A es No /A es No /A es No /A es No /A es No /A es No
es No
es No /A es No /A es No /A
6.5 P
6.5.1 This part
6.5.2 A positiindicateOnly YesPV plant
6.5.3
Test w General
SamplingRecordinStart testhh:mm] Stop testhh:mm] Valid datClass of t Test repoRelevantDescriptiDescriptiDefinitiotaken durdefinitioncollectedDescripticollectedList of anprocedurSummarythe filtereUncertainSummary PerformaTest DurPerformaTemperaRatio (PR(facultatiReferenc(facultati
Performan
Description
t refers to th
Pass/fail cri
ive final resd as facultats or N/A boxts with a Pn >
Checklist
with Interc
Fieldg interval [s] ng interval [mit: date and tim
: date and tim
ta in the time the monitorin
ort t data on the Tion of the site ion of the syst
on of the meteoring the test n of the system
d during the teion of raw dat
d during the teny deviations re y of the correced data nty analysis y of the test re
ance ratios ration (when aance Ratio (PRature-correctedR) [%] ive) ce correction tive)
nce test
he results of
iteria
sult requirestive. es are check> 100 kW ma
connection
d
in] me [dd/mm/yyy
me [dd/mm/yyy
interval [%] ng system used
Test Engineer being tested
tem being testorological dat
m output data st ta that were st from the test
ction factors f
esults
applicable) R) [%] d Performance
emperature [°
the Test wit
s that all ite
ked in their cay use only a
n Check-l
yy
yy
d A
Yes Yes
ted Yes ta Yes
Yes
Yes
Yes
for Yes
Yes Yes
e
°C]
h Interconne
ems are fill
ells. a Class A or B
list
Result / Valu
B C
No No No No
No
No
No N
No N
No N No
ection calcul
ed with cor
B monitoring
ue
N/A
N/A
N/A
ated in the p
rrect inform
g system.
P
period consid
mation, exce
Notes
Page | 30
dered.
pt those
Test w
Result
6.6 In
6.6.1 This part
6.6.2 A positiv
6.6.3
Test w Inspectio
The enabProtectioThe thresEWA The timerequired Interfacepower faInterfaceAfter a pProtectio
Result
6.7 T
6.7.1 This part
6.7.2 The Testgive pos
6.7.3
Test w Participa
with Interc
t
nspection
Description
t refers to th
Pass/fail cri
ve final resul
Checklist
with Interc
on and Test ofField
bled functions on are those resholds are tho
es of interventiby EWA
e device switchailure on comme Protection power recoveryon recloses the
t
Test with I
Description
t reports the
Pass/fail cri
t with Intercsitive result (
Final result
with Interc
ants Role
connection
n and Test
he inspection
iteria
lt requires th
connection
f the Interfacd
of the Interfaequired by EWse required by
ion are those
hes off in casemand of the
y the Interfacee Interface dev
nterconn
e final outcom
iteria
connection wPassed).
page
connection
n Check-l
Pas
t of the In
n and test of
hat only Yes o
n Check-l
ce Protection
ace WA
Yes
y Yes
Yes
e of Yes
e vice
Yes
Pas
ection Fin
me of the Te
will be succes
n Final re
list
ssed N
nterface P
f the Interfac
or N/A boxes
list
Result / Valu No
No
No
No
No
ssed N
nal result
est with Inter
ssful (Passed
esult
Name
Not passe
rotection
ce Protection
s are checke
ue
Not passe
rconnection.
d) if all the ch
d
n and its relat
d.
d
hecklists in th
P
ted devices.
Notes
he above do
Signatur
Page | 31
ocuments
re
Test w Test engi Installer Designer Inspector Inspector Inspector Notes
Final r
with Interc
ineer (mandat
(mandatory)
r (if present)
r (if present)
r (if present)
r (if present)
result
connection
tory)
n Final re
esult
Passsed NNot passed
P
d
Page | 32
7 PO
Power Q
7.1 O
The purpthe powstandardThe chec
7.2 G
7.2.1 This parQuality M
7.2.2 A positivStreet naParticipaindicate
7.2.3
Power General Name of Nominal P.O. BoxStreet naLocationCity Voltage dPOC PV moduBuilding Building
Area of tPV techn
OWER QU
Quality Meas
Overview
pose of the Qwer deliveredds. cklist is com
General on P
Documents
Harmonic Te
Power Quali
General on
Description
rt refers to thMeasuremen
Pass/fail cri
ve final resuame and numants indicated if not alrea
Checklist
r Quality M
on PV plant f the PV plant
Power [kW] x ame and numbn / Area
delivery
ule installationinstallation (itype (if appli
the PV array [nology
UALITY ME
surements an
Quality Measd by the PV p
posed by the
PV plant and
required Che
ests Check‐li
ity Measurem
n PV plan
he general dnts and Test
iteria
lt requires tmber that med as Facultady present.
Measurem
ber
n if applicable) icable)
m2]
EASUREM
nd Tests app
surements aplant is not h
e following d
d Participants
eck‐list
st
ments and Te
t and Part
data of the P.
hat all itemsay be alternatative may b
ments and
240 V
On bui Flat ro Villa o School Hotel/R Detent
Mono- Thin-f
MENTS AN
plies to solar
and Test is toarmful for th
documents:
s Check‐list
est final resu
rticipants
PV plant and
s are filled wative each otbe omitted
d Tests Ch
(1 phase)
ilding Otooftop Roor small housel/University
/Restaurant tion/Correctio
-crystalline silfilm (specify)
ND TESTS
PV plants wi
o verify and the grid and is
ult
to the data
with correct ither. if they are
eck-list
415 V (3 ph
ther structure (oof flap Fehold Apa Healthcar
Entertainmonal Othe
licon Mu. . . . . . . . .
S CHECK
ith Pn > 100
test that the s under the l
of the partic
nformation,
not present
hases) 11
(e.g. canopy) açade Otartment blocke/Hospital
ment Agricr . . . . . . . . . .
lti-crystalline Other (spec
P
KLIST
kW.
harmonic colimits specifi
cipants to th
except P.O.
t. Affiliation
kV (3 phases
Ground ther k Offices
Industrial cultural/Stable. . . . . . . . . . .
silicon cify) . . . . . . .
Page | 33
ontent of ed in the
he Power
Box and
shall be
s)
e . . .
. . . .
Power Tracking Participa
Test engiInstaller DesignerInspectorInspectorInspector
Result
7.3 D
7.3.1 This parTests.
7.3.2 A positiv
7.3.3
Power Documen
Final descase of vTest withPreliminaEWA
Result
7.4 H
7.4.1 This parnetwork
7.4.2 A positiStandard
r Quality M
g system if any
ants Role
ineer (mandat(mandatory) r (facultative) r (facultative) r (facultative) r (facultative)
t
Document
Description
rt refers to th
Pass/fail cri
ve final resul
Checklist
r Quality M
nts required Field
sign (or As-buvariations) h Interconnectary Authoriza
t
Harmonic
Description
rt refers to tk.
Pass/fail cri
ive final resds for the Co
Measurem
y
tory)
ts required
he documen
iteria
lt requires th
Measurem
uilt design in
tion report ation from
Tests
the harmonic
iteria
sult requiresonnection of
ments and
No tra
d
nts required
hat only Yes o
ments and
Resul Yes N
Yes N Yes N
c tests made
s that all thPV Plants.
d Tests Ch
acking Sin
Name
Pas
on‐site to pe
or N/A boxes
d Tests Ch
lt / Value No
No No
Pa
e at Point of
he measured
eck-list
ngle-axis track
ssed N
erform the P
s are checke
eck-list
assed
f Connection
d values are
king Two
Independe
Not passed
Power Qualit
d.
No
Not passe
n of the PV p
e below tho
P
o-axes tracking
Affiliation dent licensed e
EWA
d
ty Measurem
otes
ed
plant with th
ose indicate
Page | 34
g
engineer
ment and
he public
d in the
7.4.3
Power Voltage h
FielTHD 3rd 5th 7th 9th 11th 13th 15th Current THD 3rd 5th 7th 9th 11th 13th 15th
Result
7.5 P
7.5.1 This part
7.5.2 The Testgive pos
7.5.3
Power Participa
Test engi Installer Designer Inspector
Checklist
r Quality M
harmonics d F
harmonics
t
Power Qua
Description
t reports the
Pass/fail cri
t with Intercsitive result (
Final result
r Quality M
ants Role
ineer (mandat
(mandatory)
r (if present)
r (if present)
Measurem
1 (Red)
ality Meas
e final outcom
iteria
connection wPassed).
page
Measurem
tory)
ments and
F2 (Yellow)
Passed
surements
me of the Po
will be succes
ments and
d Tests Ch
) F3 (B
Not p
s and Tes
ower quality
ssful (Passed
d Tests Fin
Name
eck-list
Blue) N
passed
sts Final r
Measureme
d) if all the ch
nal result
N (Black)
result
ents and Test
hecklists in th
P
Note
ts.
he above do
Signatur
Page | 35
es
ocuments
re
Power Inspector Inspector Notes
Final r
r Quality M
r (if present)
r (if present)
result
Measurem
ments and d Tests Fin
Pas
nal result
ssed NNot passed
P
d
Page | 36