Terms to KnowInteger Programming, Mixed Integer Programming, Binary Variable, Binary Integer Programming, Mutually Exclusive Alternatives, Contingent Decisions, Tours-of-duty Planning Problem, Rostering Problem, Auxiliary Binary Variable, Binary Representation
![Page 3: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/3.jpg)
Terms to Know Cont.Set Covering Problems, Set Partitioning Problems, Exponential Growth, LP Relaxation, Branching Tree, Branching Variable, Relaxation, Incumbent, Fathom, Descendants, Lagrangian Relaxation, Cutting Plane, Cut, Minimum Cover, Global Constraints
![Page 4: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/4.jpg)
4
Applications of Binary VariablesBinary variables only allow two
choices◦ This makes them suited for problems that
are characterized by variables that can take on only two possibilities.
Examples:◦ Do a project or not do a project?◦ To hire or not to hire?◦ To build or not to build?◦ To Sell or not to sell?
![Page 5: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/5.jpg)
5
Case Study: California Manufacturing Company (CMC)The California Manufacturing
Company is a company with factories and warehouses throughout California.
It is currently considering whether to build a new factory in Los Angeles and/or San Francisco.
Management is also considering building one new warehouse where a new factory has been recently built.
Should the CMC build factories and/or warehouses in Los Angeles and/or San Francisco?
![Page 6: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/6.jpg)
6
Case Study: CMC Cont.
Binary DecisionDecisionVariable
NPV(Millions)
CapitalNeeded
(Millions)
Build a factory in Los Angeles FLA $9 $6
Build a factory in San Francisco
FSF 5 3
Build a warehouse in Los Angeles
WLA 6 5
Build a warehouse in San Francisco
WSF 4 2
Building Money Available: $10 million
![Page 7: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/7.jpg)
7
Case Study: CMC Cont.FLA, FSF, WLA,WSF are all binary
variables which take on the value of 1 if the specific item is done and zero if it is not done.
We also need to make sure that at most one warehouse is built and it is built where a factory is built.
![Page 8: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/8.jpg)
8
Mathematical Model for CMC
}1,0{,,,
1
0
0
10*2*5*3*6
:Subject to
*4*6*5*9,,,
WSFWLAFSFFLA
WSFWLA
WSFWSF
FLAWLA
WSFWLAFSFFLA
WSFWLAFSFFLAMaxWSFWLAFSFFLA
![Page 9: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/9.jpg)
Innovative Uses for Binary VariablesEither-Or ConstraintA Subset of Constraints Must
HoldA Constraint that Needs a Single
Value Out of Multiple PossibilitiesA Fixed Cost Is Only Associated
with a Positive Usage of a Variable
Binary Representation of General Integer Variables
![Page 10: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/10.jpg)
Either-Or ConstraintSuppose you have a situation
where you have two potential constraints, but only one of them can hold◦To handle this issue, you can add to
one constraint My1 to the RHS and to the other constraint M(1-y1) to the RHS where y1 is a binary variable
◦For example: 5x1+9x2 ≤ 24 + My1
8x1+6x2 ≤ 35 + M(1-y1)
![Page 11: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/11.jpg)
A Subset of Constraints Must HoldSuppose you have N constraints
where only K of the constraints hold (K<N)◦You would add to constraint i the
amount Myi and one other constraint where
◦For example: 5x1 + 12x2 ≤ 34 + My1
6x1 + 11x2 ≤ 43 + My2
7x1 + 10x2 ≤ 57 + My3
y1+ y2 + y3 = 1
![Page 12: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/12.jpg)
A Constraint that Needs a Single Value Out of Multiple PossibilitiesSuppose you have a constraint
where the function can take on one out of many values◦To handle this issue, you would multiply
value i by a binary variable yi and sum them all together while adding one more constraint that
◦For example:◦5x1 +31x2 = 25 or 50 or 75
5x1 +31x2 = 25y1+ 50y2+ 75y3
y1+ y2 + y3 = 1
![Page 13: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/13.jpg)
A Fixed Cost Is Only Associated with a Positive Usage of a VariableSuppose you have the situation
where your objective function only takes on a fixed cost ki if you use a corresponding variable xi > 0, if xi = 0 then ki = 0◦To handle this issue you would add to
the objective function kiyi and a new constraint xi ≤ Myi
◦For example, suppose that variable x1 has an associated set-up cost if you decide to use it
![Page 14: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/14.jpg)
Subject to:+ 3523+42
![Page 15: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/15.jpg)
Binary Representation of General Integer VariablesThere are some times when you
may want to represent a variable that is supposed to be an integer by transforming it into a binary representation◦This can be done by defining the
variable x =
![Page 16: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/16.jpg)
Goods Product Company ExampleObjective: Maximize ProfitsDecision Variables: Product 1,
Product 2, and Product 3Constraints:
◦Production time available for Plants 1 and 2
◦At most two out of the three products can be produced
◦Only one of the two plants can produce the new products
![Page 17: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/17.jpg)
Data for Goods Product Company Product 1 uses 3 hours of Plant 1 or 4
hours of Plant 2 per unit of production◦You can sell up to 7 at a profit of $5,000
Product 2 uses 4 hours of Plant 1 or 6 hours of Plant 2 per unit of production◦You can sell up to 5 at a profit of $7,000
Product 3 uses 2 hours of Plant 1 or 2 hours of Plant 2 per unit of production◦You can sell up to 9 at a profit of $3,000
Plant 1 has 30 hours available while Plant 2 has 40 hours
![Page 18: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/18.jpg)
Mathematical Model for Goods Product Company
Subject to:
We will examine the spreadsheet model in class
![Page 19: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/19.jpg)
Supersuds Corporation ExampleObjective: Maximize ProfitsDecision Variables: Number of TV
spots for Product 1, Product 2, and Product 3
Constraints: ◦Number of TV spots allocated to the
three products cannot be more than five
Major Issue: Proportionality Assumption is violated
![Page 20: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/20.jpg)
Data for SupersudsIf any of the products does not buy a
TV spot, it will not get any profitIf Product 1 buys 1, 2 , or 3 TV spot(s),
its profitability would be 1, 3, or 3 respectively
If Product 2 buys 1, 2 , or 3 TV spot(s), its profitability would be 0, 2, or 3 respectively
If Product 3 buys 1, 2 , or 3 TV spot(s), its profitability would be -1, 2, or 4 respectively
![Page 21: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/21.jpg)
Mathematical Model 1 for Supersuds
Subject to:
We will examine the spreadsheet model in class
![Page 22: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/22.jpg)
Mathematical Model 2 for Supersuds
Subject to:
We will examine the spreadsheet model in class
![Page 23: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/23.jpg)
23
Wyndor Case RevisitedTwo new products have been
developed:◦ An 8-foot glass door◦ A 4x6 foot glass window
Wyndor has three production plants◦ Production of the door utilizes Plants 1 and
3◦ Production of the window utilizes Plants 2
and 3Objective is to find the optimal mix of
these two new products.
![Page 24: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/24.jpg)
24
Wyndor Case Revisited Cont.
Production Time Used for Each Unit Produced
Plant Doors Windows Available Per Week
1 1 hour 0 hour 4 hour
2 0 hour 2 hour 12 hour
3 3 hour 2 hour 18 hour
Unit Profit $300 $500
![Page 25: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/25.jpg)
25
Wyndor Case Revisited Cont.
5) and 4 ts(Constrain 0 W0,D
3)t (Constrain 182W3D
2)t (Constrain212W
1)t (Constrain 4D
:Subject to
500300 Max WD, w.r.t.
WD
![Page 26: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/26.jpg)
26
Changing Wyndor to Account for Setup Costs Suppose that two changes are
made to the original Wyndor problem:
◦ If Wyndor chooses to produce doors, it must pay a one time set-up cost of $700, while if Wyndor produces windows it must pay a set-up cost of $1,300.
◦ We want to restrict the doors and windows to be integer values.
![Page 27: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/27.jpg)
27
Wyndor’s Mathematical Model With Set-Up Costs
{0,1} WSDS,
integers are nd 0, WD,
WS*99W
DS*99D
182W3D
212W
4D
:Subject to
1300700500300 Max WSDS, W,D, w.r.t.
a
WSDSWD
![Page 28: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/28.jpg)
28
Changing Wyndor to Account for Mutually Exclusive Products
Suppose Wyndor decides that it only wants to produce doors or windows rather than both.◦ This implies that either doors have to
be zero or windows have to be zero.
![Page 29: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/29.jpg)
29
Wyndor’s Mathematical Model With Mutually Exclusive Products
{0,1} WSDS,
integers are nd 0, WD,
1WSDS
WS*99W
DS*99D
182W3D
212W
4D
:Subject to
1300700500300 Max WSDS, W,D, w.r.t.
a
WSDSWD
![Page 30: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/30.jpg)
30
Changing Wyndor to Account for Either-Or Constraints
Suppose the company is trying to decide whether to build a new up-to-date plant that will be used to replace plant 3.◦ This implies that Wyndor wants to
examine the profitably of using plant 4 versus plant 3.
![Page 31: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/31.jpg)
31
Wyndor’s Data with Either/Or Constraint
Production Time Used for Each Unit Produced
Plant Doors Windows Available Per Week
1 1 hour 0 hour 4 hour
2 0 hour 2 hour 12 hour
3 3 hour 2 hour 18 hour
4 2 hours 4 hours 28 hours
Unit Profit $300 $500
![Page 32: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/32.jpg)
32
Wyndor’s Mathematical Model With Either/Or Constraint
{0,1}P4 P3,
integers are nd 0, WD,
14P3P
P3*99284W2D
P4*99182W3D
212W
4D
:Subject to
500300 MaxP4 P3, W,D, w.r.t.
a
WD
![Page 33: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/33.jpg)
33
The Challenges of RoundingIt may be tempting to round a
solution from a non-integer problem, rather than modeling for the integer value.
There are three main issues that can arise:◦Rounded Solution may not be
feasible.◦Rounded solution may not be close
to optimal.◦There can be many rounded
solutions
![Page 34: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/34.jpg)
Algorithms For Solving BIPs and MIPsBranch-and-Bound AlgorithmBranch-and-Cut Algorithm
![Page 35: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/35.jpg)
Branch-and-Bound AlgorithmThis algorithm has three main
steps in an iteration:◦Branching
This is where you create two new sub-problems
◦Bounding For each sub-problem, apply the simplex
method to the LP relaxation
◦Fathoming This where you are deciding whether to
dismiss the sub-problem from further consideration
![Page 36: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/36.jpg)
Fathoming TestTest 1: Its bound is less than Z*,
where Z* represents the value you get from the objective function for the current best incumbent solution
Test 2: The LP relaxation problem has no solution
Test 3: The optimal solution for the LP relaxation problem is binary/integer
![Page 37: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/37.jpg)
Branch-and-Cut AlgorithmsThese algorithms primarily rely upon:
◦Problem preprocessing Fixing variables that you know upfront must
be a particular variable Eliminating redundant constraints Tightening constraints in a way to reduce the
feasible region
◦Generating cutting planes This reduces the feasible region for the LP
relaxation which does not reduce the feasible solutions
◦Clever branch-and-bound techniques
![Page 38: Integer Programming Chapter 11: Hillier and Lieberman Dr. Hurley’s AGB 328 Course](https://reader033.vdocument.in/reader033/viewer/2022061415/56649e445503460f94b37c03/html5/thumbnails/38.jpg)
In-Class Activity (Not Graded)Create a spreadsheet model for
each of the Wyndor problems previously discussed