Integrated PlanningA Technical Analysis Using BlendOpt
J. Whitacre, S. Schellenberg and A. Iorio Paradyn Systems Pty Ltd
www.paradynsystems.com
![Page 2: Integrated planning strategies for coal mines presentation](https://reader031.vdocument.in/reader031/viewer/2022021812/58a3fe131a28ab64528b5c1b/html5/thumbnails/2.jpg)
Holistic Processing Strategies
Strategic Decisions
feed blendingwhat to bypasshow to process
Opex
Washability
Mine Schedule
Plant Operating Capacities
Product Ash
Sales Targets
Feed Qualities
![Page 3: Integrated planning strategies for coal mines presentation](https://reader031.vdocument.in/reader031/viewer/2022021812/58a3fe131a28ab64528b5c1b/html5/thumbnails/3.jpg)
Pit
CHPP
Blending at
train loading
Blending in
Port Stockyard
Blending onto ship
ROM Blending
Stockp
ile
Blends
Pit Train Vessel
Value Drivers in a Coal Supply Chain
Coal Aging/Oxidation
Cut-points, feed blending, wash or bypass, operating
constraints
ROM StockpilesProduct Stockpiles Port Stockpiles
Rail constraints
Feed Blends
![Page 4: Integrated planning strategies for coal mines presentation](https://reader031.vdocument.in/reader031/viewer/2022021812/58a3fe131a28ab64528b5c1b/html5/thumbnails/4.jpg)
Integrated Planning Study with BlendOptModel Inputs
![Page 5: Integrated planning strategies for coal mines presentation](https://reader031.vdocument.in/reader031/viewer/2022021812/58a3fe131a28ab64528b5c1b/html5/thumbnails/5.jpg)
BlendOptOutputs
![Page 6: Integrated planning strategies for coal mines presentation](https://reader031.vdocument.in/reader031/viewer/2022021812/58a3fe131a28ab64528b5c1b/html5/thumbnails/6.jpg)
Case Study 1Rule-based Processing Strategy
![Page 7: Integrated planning strategies for coal mines presentation](https://reader031.vdocument.in/reader031/viewer/2022021812/58a3fe131a28ab64528b5c1b/html5/thumbnails/7.jpg)
Case Study 1Results
Rule-based Strategy
BlendOpt• 6.8% higher revenue• 50% less washing
![Page 8: Integrated planning strategies for coal mines presentation](https://reader031.vdocument.in/reader031/viewer/2022021812/58a3fe131a28ab64528b5c1b/html5/thumbnails/8.jpg)
Case Study 2Processing Strategies using Excel Solver
…Understanding the Limits of Optimisation in Excel
![Page 9: Integrated planning strategies for coal mines presentation](https://reader031.vdocument.in/reader031/viewer/2022021812/58a3fe131a28ab64528b5c1b/html5/thumbnails/9.jpg)
Case Study 2 Planning by Premium Product
Planning Heuristic: use Excel Solver to optimise in order of price premium
![Page 10: Integrated planning strategies for coal mines presentation](https://reader031.vdocument.in/reader031/viewer/2022021812/58a3fe131a28ab64528b5c1b/html5/thumbnails/10.jpg)
Case Study 2 Results
Product Ash Spec Price Premium over P3P1 Low 23%P2 Mid 15%P3 High 0%
Tonnage P1 (Mt) P2 (Mt) P3 (Mt) Total (Mt) Revenue ($M)Heuristic 1.03 0.70 0.55 2.28 160.0BlendOpt 0.52 1.86 0.00 2.38 168.5
…Over-washing caused by an over emphasis on premium product
![Page 11: Integrated planning strategies for coal mines presentation](https://reader031.vdocument.in/reader031/viewer/2022021812/58a3fe131a28ab64528b5c1b/html5/thumbnails/11.jpg)
Case Study 3 DMC Cut-Point Strategies
Objectives
Planning Decisions
• Consistent Met Coal Product Quality • Maximise Revenue
• Cut-point Settings per Seam • Product Blending
![Page 12: Integrated planning strategies for coal mines presentation](https://reader031.vdocument.in/reader031/viewer/2022021812/58a3fe131a28ab64528b5c1b/html5/thumbnails/12.jpg)
Case Study 3 Results
Baseline 5yr change in product VM ~ 2
BlendOpt
DMC cut-point = 1.45
Processing Product Consistency Revenue
9% increase over baseline
![Page 13: Integrated planning strategies for coal mines presentation](https://reader031.vdocument.in/reader031/viewer/2022021812/58a3fe131a28ab64528b5c1b/html5/thumbnails/13.jpg)
Other Model Considerations
• Dual-Stage DMC Circuits
• Different Seam Feed Rates
• Managing Data Uncertainty
Plant Modelling• ROM and Product Stockpiles
• Rail Capacity Constraints
• “Wash Only” Contracts
• 3rd Party Coal
• “Energy Based” Contracts
Supply Chain Modelling
![Page 14: Integrated planning strategies for coal mines presentation](https://reader031.vdocument.in/reader031/viewer/2022021812/58a3fe131a28ab64528b5c1b/html5/thumbnails/14.jpg)
Conclusions
Incremental Adjustments in:• Wash vs Bypass• DMC cut-points • Product Blending
Non-Trivial Improvements to:• Yields• Costs• Revenue
CAN DISCOVER
Holistic View of Processing Uncertainty drives calculated risks not conservativism
…BUT ONLY IF