Integrity Assessment Techniques
MAB1033 Structural Assessment & Repair
Prof. Dr. Azlan Abdul Rahman
Universiti Teknologi Malaysia (UTM)
![Page 2: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/2.jpg)
Introduction
Integrity assessment involves either,
·Determination of localised integrity of a
particular element, or
·General assessment of behaviour of entire
structure.
2
![Page 3: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/3.jpg)
Reasons for Integrity Assessment
·Assessment of fire damage or other accidental
damage.
·Assessment of effects of overloads.
·Detection of delaminations.
·Detection of construction defects.
·Identification of hidden construction details.
3
![Page 4: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/4.jpg)
Range of Testing Methods
·Rebound Hammer (surface hardness)
·Ultrasonic Pulse Velocity (UPV)
·Dynamic Response
·Radiography
·Radiometry
·Thermography
·Radar
4
![Page 5: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/5.jpg)
Surface Hardness Test
·A Rebound (or Schmidt) Hammer consists of a mass impacting the concrete surface with a standardized energy and causing localized crushing. ·The amount of rebound of the mass is measured & expressed as a ‘rebound number’. ·A quick & simple test but not recommended for
absolute strength assessment. ·Strength correlations provided with the equipment should only be used when confirmed by calibration trials for the condition of use.
5
![Page 6: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/6.jpg)
·m o w m o m M
of • ■ rrE Us a 1 •
The Rebound Hammer
Impact spring
Release catch
Window and scale
Hammer mass
Locking button
Concrete surface
Rider on guide rod
Hammer guide
Housing Compression spring
TO • • ••
‘ n % ... MOiee.
·+Y` _.._.`__t i J 1
Plunger
41.40',/ learzoricoverdrzoirogror
E r = 1 •Nm
·N I V I M I I N M I 3 1
·1 g‘k fi l i r d i r i r ' O W e X W e e . 0 i %
•
8 P.1 Ar.G- C inr _E ATIVE JV rbi -v.ds FILEND
![Page 7: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/7.jpg)
The Rebound Hammer
7
![Page 8: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/8.jpg)
The Rebound Hammer
Conventional Calibration Anvil Digital Rebound Rebound Hammer Hammer in Use
8
![Page 9: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/9.jpg)
1 h p
h 4
. - n i t - 7 .1.11.1
fl. I ow
ikrams I 111.1-11-
1 •-•11-1.1. u.b1.
14.a.aral imp
S ia lug M11W rl .L.1%1+11
·-1 awl{ Frre 15 mlaC &Ea la. • I Hama. El FL• . 71 1.1.-1-01•1 11w1mil Wm! 1111+ •• !I" I • I
efiliJOLC P •LITE11511.•
The Rebound Hammer Digitalized Rebound Hammer
S Pi nlAr.GCREJ.TJVE JV Fri Cr V Ja l FILE hi ON S
·I A
ProviSla Software
PP C{ - PROF CVE1 IP 3. LY2 .11a I IX 51.1 TEN
rxeti Eau: z it, xa. ·L • •
1'14 1141
II-I • 1111 7 1Y II ·Fir 21
I:. H id 11
Lcs .4ar
17 1121 11.111 i11 1— •
I•
: 1
![Page 10: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/10.jpg)
Use of the Rebound Hammer
10
![Page 11: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/11.jpg)
Rebound Hammer Test
11
![Page 12: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/12.jpg)
The Rebound Hammer (contd.)
·Results of rebound hammer are affected by conditions within 30mm of the surface & may be greatly influenced by localized carbonation hardening in concrete > 3 months old & member rigidity.
·Use is most reliable in determination of uniformity of
young concrete with CoV of 4% on good concrete.
·Details of test described in BS1881 Part 202.
12
![Page 13: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/13.jpg)
Rough Guide on Rebound Hammer
Rebound Hammer Nos.
Probable Concrete Strength (N/mm2)
Concrete
Quality Assessment
< 25 20 Poor
25 – 35 20 – 30 Intermediate
> 35 > 30 Sound
13
![Page 14: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/14.jpg)
Factors Affecting Rebound
Hammer Test ·Mix characteristics ·Concrete maturity ·Moisture conditions ·Nature of surface finish ·Instrument orientation (horizontal, vertical etc.) ·Surface carbonation hardening ·Inadequate member rigidity ·Test located on aggregate particle at the surface. ·Reinforcement close to the surface.
14
![Page 15: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/15.jpg)
Ultrasonic Pulse Velocity
·Measurements are made of the transit time of a high-frequency pulse (typically 54kHz) over a measured path length between transducers placed on the concrete surface
·Well established method, quick & reflects the characteristics of the interior of a concrete member.
·UPV test method is well documented in BS 1881 Part
203.
15
![Page 16: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/16.jpg)
The UPV Equipment
16
![Page 17: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/17.jpg)
Modern Version of PUNDIT
![Page 18: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/18.jpg)
Principle of Pulse Measurement
The UPV Measurement
R T
T
void
R
Pulse Path
18
![Page 19: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/19.jpg)
The Pulse Velocity
Path Length(m)
Transit Time (microsec)
= Pulse
Velocity (km/sec)
19
![Page 20: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/20.jpg)
Rough Guide UPV
Pulse Velocity
(km/sec)
Probable Concrete Quality
> 4.5 Excellent
3.5 – 4.5 Good
3.0 – 3.5 Fair (Doubtful)
2.0 – 3.0 Poor
< 2.0 Very Poor
20
![Page 21: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/21.jpg)
Direct UPV Measurements
R
T T R Direct Semi-direct
T R
Indirect
21
![Page 22: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/22.jpg)
UPV Measurement (contd.) ·Most reliable applications are for determination of
concrete uniformity & the location of internal defects. ·Strength estimation may be possible with the aid of correlation charts. ·Access is required to opposite faces of the concrete
member for the most reliable results & surface staining may result from use of couplants. ·Erroneous results may be caused by : poor surface
coupling, internal air-filled cracks or voids, reinforcement bars, small path length or small lateral dimensions. ·Corrections may be made for the presence of reinforcing bars close to the pulse path if unavoidable. ·A 2% change in UPV if often regarded as indicative of a significant difference in concrete properties.
22
![Page 23: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/23.jpg)
Dynamic Response : Pulse Echo Tests
·Involves the measurement at a concrete surface of the internally reflected shock waves from a single hammer blow or similar impact on the surface. ·An accelerometer placed on the concrete surface is used
to monitor stress waves resulting from the impact & the output is displayed visually as a digital reading of the amplitude using simple hand-held equipment or oscilloscope. ·Pulse-echo technique using instrumented hammer is
well-established in the field of pile testing and are widely used to assess length & uniformity.
23
![Page 24: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/24.jpg)
Principle of Pulse Echo
Receiver & Display
Hammer blow
Concrete surface or
major delamination
24
![Page 25: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/25.jpg)
Pulse Echo / Impact Echo
25
![Page 26: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/26.jpg)
Impact Echo
![Page 27: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/27.jpg)
Instrumented Hammer
27
![Page 28: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/28.jpg)
Pile Integrity Assessment
28
![Page 29: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/29.jpg)
Delamination or Flaw Detection
29
![Page 30: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/30.jpg)
Other Flaw-Detection Methods
Acoustic Emission
Ultrasonic Flaw Detection Method
Boroscope for Internal Examination
![Page 31: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/31.jpg)
Radiography
·This provides a ‘photograph’ of the interior of a concrete member indicating variations in density.
·A beam of gamma ray is directed through the concrete towards a film held against the opposite face (max. thickness 500mm)
·Voids, poor compaction & reinforcement can be located.
·Details of technique in BS1881 Part 205.
31
![Page 32: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/32.jpg)
X-ray sensitive
film
X-ray or Y-ray
source
Principle of Radiography
3 2
![Page 33: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/33.jpg)
High Energy Radiography
33
![Page 34: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/34.jpg)
Radiometry
·A beam of gamma rays is directed at the concrete & the intensity of radiation emerging is measured by means of a Geiger counter to indicate concrete density.
·Direct measurement may be made of radiation passing through a concrete body up to 600mm thick.
·In backscatter method, radiation is reflected back to
the same surface. Easier to perform.
34
![Page 35: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/35.jpg)
Radiometry : Backscatter Method
Detector Radioactive source
Neutron paths
35
![Page 36: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/36.jpg)
Thermography
·Based on measurement of surface temperature differentials on concrete member while heating or cooling. ·Infra-red measurement techniques are necessary to detect
& record small temperature differentials. ·The method does not require contact with the concrete surface & can be used with measurement equipment some distance away provided that effects of extraneous heat sources can be avoided. ·Applications : detection of delamination in bridge decks; location of moisture or major ducts or voids within walls or slabs; evaluation of pavements.
36
![Page 37: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/37.jpg)
Infrared Thermography for Building Inspection
![Page 38: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/38.jpg)
Radar Method
·Specialized surface-penetrating radar scanning equipment may be used to identify reinforcing bars, voids, delaminations, ducts & similar features. ·Equipment consists of transmitting & receiving antennae together with a control unit & recorder. ·Resolution obtained depends on frequency used (1 GHz is typically used for investigating concrete up to 500mm thick). ·Results either provided in the form of graphic recorder
trace, or as colour display with facilities for signal processing to aid interpretation (based on pattern recognition).
38
![Page 39: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/39.jpg)
·U M
Efi • E rrE Us 1-
Principle of Surface Penetrating Radar
Signal Transmitter
Receiver
Control Unit and Recorc:ber/Dieplay
Vold or other feature
. r. • • • • • • "-
...."•••••••••••.#
"...".•••••••••••
• P• 1 8 P ' I .G C REJTIVE i t IV Cr V A l FILE roorvos
![Page 40: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/40.jpg)
itfitiAkell ■LIrE Yip
Ground Penetration Radar (GPR) Receiver
• Reflection from Defe:-:1
Reflection from Bottom SuifER:c.:
Ground Penetrating Radar system over a defect.
Plot of Ground Penetrating Radar data from a post-tension tendon survey.
Concrete pour: 1 Tenth
0 ns
Concrete pour 2 weeks Commie pour .1 month
Pink 1ensivn
Floor surface
$.1rvite. • JO LA, ·'4.. .11
lad ...41111"94. a .1'
1 ° 1 1 1 Mk
•• • • fl
ki"
·
1. 11 rrn .1 ---
'0 1.
/04 W.4 I
stab base — d o c k / 0 4
A 1 !! )11
4 1i -• 4 - i •••
COrnpadcd Sand .440.4 I
Sand/Clay 101.eiraCe
ns Clay intrusion
PhgrAr.G e 41. Ar IVO VA 11", E- 15.411huin
![Page 41: Integrity Assessment of Concrete Structures](https://reader035.vdocument.in/reader035/viewer/2022081506/563db9c7550346aa9a9fdaff/html5/thumbnails/41.jpg)
T&rCtnc KcsCh