Download - Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva
![Page 1: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/1.jpg)
Introduction to GCOS
Richard K. Thigpen
Implementation Project Manager
GCOS Secretariat
Geneva
![Page 2: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/2.jpg)
People in GCOS
Dave Goodrich D/GCOS
Howard Diamond US GCOS Program Manager
Dick Thigpen Implementation Project Manager
Steering Committee Chair John Zillman
Atmospheric Advisory Panel Chair
Adrian Simmons
Advisory Working Group Chair Phil Jones
![Page 3: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/3.jpg)
GCOS Surface Network
Around 1000 StationsRoughly 150-300 Km SpacingMandatory Requirements:
Monthly CLIMAT Report of Mean Temps, Total Precip
Target RequirementsDaily Temp, Precip, Pressure
Operated by National Met Services
Biggest problems:
No Monthly CLIMAT Reports
Mis-Identification
Old , Un-Calibrated Equipment
![Page 4: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/4.jpg)
GSN
![Page 5: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/5.jpg)
GCOS Upper Air Network
About 150 StationsUniform Global Distribution (5-10 Deg)Minimum Requirement (Draft)
At least 25 soundings/month to 30HPa Temp, Humidity, Wind Speed and Direction
Target requirement (Draft)Temp, Wind, Humidity as High as PossibleCLIMAT TEMP
Biggest problems:
Operating Costs
Old Equipment
![Page 6: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/6.jpg)
GUAN
![Page 7: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/7.jpg)
The GCOS Upper Air Network
Considered baseline Calibration Networks
Permits calibration of other data i.e. satellite, AMDAR
Should be the best stations
Long History, good operation
Climate Monitoring Principles
PR has Agreed
![Page 8: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/8.jpg)
Things We Have Done to Improve GUAN
Direct Renovations
CBS Lead Centers for GCOS
Technical Support projects
![Page 9: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/9.jpg)
Early InitiativesCorrected Errors in Station Lists
Some Stations Closed, misidentified, GTS Routing Problems
Revised Reports:
Additional Reports established
Reporting Centers Using same Lists
Improved Distribution of network Stations:
Additional Stations Added in Sparse Areas
![Page 10: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/10.jpg)
Revitalization Activities
Equipment Replacement
Hydrogen Generators and Upper Air Systems
Gan, Maldives Dar es Salaam, Tanzania
Windhoek, Namibia Harare, Zimbabwe
Yerevan, Armenia Penrhyn, Cook Islands
Douala, Cameroon Antananarivo, Madagascar
Dakar, Senegal Addis Ababa, Ethiopia
Nairobi, Kenya Bauerfield, Vanuatu
Honiara, Solomon Islands Laoag, Philippines
Galapagos, Ecuador
Radiosondes and Balloons To Many
![Page 11: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/11.jpg)
New GUAN Station at Gan, Maldives
![Page 12: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/12.jpg)
New GUAN Station at Dar es Salaam
![Page 13: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/13.jpg)
Yerevan, Armenia
![Page 14: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/14.jpg)
Windhoek
![Page 15: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/15.jpg)
Douala, Cameroun
![Page 16: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/16.jpg)
Antananarivo, Madagascar
![Page 17: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/17.jpg)
How Did We Do Them?
Bi lateral Agreements
UKMO, New Zealand, South Africa
Works Good But……
GCOS Managed, WMO Procurement
Works Good But…..
Employed many Different Systems
![Page 18: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/18.jpg)
CBS Lead Centers for GCOS
Have Authority to Contact Country Directly
WMO Very Formal About Contact with Members
Japanese Met Service First for GSN
Then NCDC for GSN and GUAN
Recently IRAN for GSN and GUAN
Now Australia , Morocco , British Antarctic Survey, and Chile for GSN and GUAN
![Page 19: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/19.jpg)
Lead Center Representatives
Hiroshi Nakamigawa JMA
Matt Menne US
Mina Jabbari Iran
Phil Alford Australia
Rachid Sebbari Morocco
Jonathan Shanklin BAS
Jorge Carrasco Chile
![Page 20: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/20.jpg)
CBS Lead Centers
Early Training Session at WMO Mar 2006
Good Progress Already
Iran has contacted >12 Countries
Retrieved Historic Data
See Results Already
Language, Cultural, & Regional Differences
![Page 21: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/21.jpg)
CBS Lead Centers
Initial Recommendations
Additional Centers Needed
Africa (IGAD and SADC)
South America
Europe
Yearly Coordination Meetings
All Centers Equal, GCOS be “LEAD” Lead Center
![Page 22: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/22.jpg)
![Page 23: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/23.jpg)
GCOS Technical Support Projects
Three One Year Projects Established
Pacific Islands (New Zealand Met Service)
Caribbean (Private Company)
SADC Africa (Botswana Met Service)
Visit Each GUAN Station 2 Times per Year
Visit as Many GSN as Possible
Monitor reports from all Stations
![Page 24: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/24.jpg)
Technical Support Projects
Site Visits:
Better Meta Data
Including Photos Around Sensor Suite
Actual Location of Many are Wrong
Many are no Longer Good Sites
Calibration and Training
![Page 25: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/25.jpg)
![Page 26: Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva](https://reader035.vdocument.in/reader035/viewer/2022062422/5681413c550346895dad2541/html5/thumbnails/26.jpg)
Muchas
Gracias
RKT