![Page 1: IPO Presentation November 2011. September 2011 2 VMS Districts Net Values Wabassi Image From HudBay Corporate Presentation Exploration Program Review,](https://reader037.vdocument.in/reader037/viewer/2022110319/56649c7c5503460f949306f5/html5/thumbnails/1.jpg)
IPO PresentationNovember 2011
![Page 2: IPO Presentation November 2011. September 2011 2 VMS Districts Net Values Wabassi Image From HudBay Corporate Presentation Exploration Program Review,](https://reader037.vdocument.in/reader037/viewer/2022110319/56649c7c5503460f949306f5/html5/thumbnails/2.jpg)
September 2011
2VMS Districts Net Values
Wabassi
Image From HudBay Corporate PresentationExploration Program Review, Dec. 15, 2010
Major Successes
Rising Corporations
![Page 3: IPO Presentation November 2011. September 2011 2 VMS Districts Net Values Wabassi Image From HudBay Corporate Presentation Exploration Program Review,](https://reader037.vdocument.in/reader037/viewer/2022110319/56649c7c5503460f949306f5/html5/thumbnails/3.jpg)
September 2011
3Location
180 km south of Ring of Fire
170 km north of railhead at Nakina, Ontario
OntarioWabassi:
Proposed Rail link
Wabassi
![Page 4: IPO Presentation November 2011. September 2011 2 VMS Districts Net Values Wabassi Image From HudBay Corporate Presentation Exploration Program Review,](https://reader037.vdocument.in/reader037/viewer/2022110319/56649c7c5503460f949306f5/html5/thumbnails/4.jpg)
September 2011
42011 VTEM – Preliminary Targets
A2
Anomaly ENew Exploration Camp Location
![Page 5: IPO Presentation November 2011. September 2011 2 VMS Districts Net Values Wabassi Image From HudBay Corporate Presentation Exploration Program Review,](https://reader037.vdocument.in/reader037/viewer/2022110319/56649c7c5503460f949306f5/html5/thumbnails/5.jpg)
September 2011
5Assay Results
Anomaly E Long Run Price
Zn $
0.60 / lb
Ni $
5.00 / lb
Cu $
1.50 / lbAg $ 16.00 / OzAu $ 750.00 / Oz Drill Hole From (m) To (m) Interval (m) Ag (g/t) Cu% Ni% Zn% Au (g/t) $/ton Value
![Page 6: IPO Presentation November 2011. September 2011 2 VMS Districts Net Values Wabassi Image From HudBay Corporate Presentation Exploration Program Review,](https://reader037.vdocument.in/reader037/viewer/2022110319/56649c7c5503460f949306f5/html5/thumbnails/6.jpg)
September 2011
62011 VTEM – EM - New Targets (Scales Equal)
Block 2 VTEMBlock 3 VTEM
Anomaly ‘E’ VMS Discovery-20112010 VTEM Survey
Size Comparison & Location, Referencing
New VTEM Targets – Blocks 2 & 3
**Note: Based on ground & downhole geophysics & drilling (4 holes) the
mineralization contained within Anomaly E is 650m in length,
averages 24m thick, and is open along strike in both directions and at
depth!!Anomaly “E” VMS Discovery
A-2 VMS Discovery
![Page 7: IPO Presentation November 2011. September 2011 2 VMS Districts Net Values Wabassi Image From HudBay Corporate Presentation Exploration Program Review,](https://reader037.vdocument.in/reader037/viewer/2022110319/56649c7c5503460f949306f5/html5/thumbnails/7.jpg)
September 2011
7Capital Structure
Directors, 7.6 (6 are es-crowed)
F&F; 12.965
Zimtu; 2.02
WPX; 2.02
Investors; 12.76
NRN; 0.3
DHRC SHARES (in millions)
*as of July 31, 2011
Common Shares Issued 38,475,000
Fully Diluted 45,575,000
Investment Assets $1,525,200
Cash $803,149*
WPX Debenture $4,450,000
Converts at IPO Price
Shares and Assets