JAS PE R SBrendan Smyth
DG Regional Policy - Unit D3 ‘Financial Engineering’
OPEN DAYS 2010 – Workshop on JASPERS, JEREMIE, JESSICA - progress and future perspectives, 5th October 2010
2
JAS PE R S ra tiona le• ‘Joint Assistance to Assist Projects in European Regions’
• a joint technical assistance initiative: Commission, EIB, EBRD, KfW
• Twelve beneficiaries: Member States which joined EU in 2004 and 2007
• Drawn from experience with pre-accession period: continuing need to provide assistance with preparation of major projects because of lack of experience and expertise
• JASPERS is a a project preparation unit with a long-term mandate
3
JAS PE R S ra tiona le
• Close relationship over many years between Commission and IFIs
• Advantages of a stable long-term structure• Better than ever-increasing use of external consultants –
stability, consistency over time and a capacity to learn from experience
• Using IFIs’ in-house technical capacity and experience• JASPERS: based in EIB but separate from EIB lending
operations• Close to beneficiaries: 70% of staff in regional offices
4
JAS PE R S objec tives• Improving the quality of investment• Accelerating the approval of projects by the
Commission and by the national authorities• Building capacity within the Member States:
l e a r n in g -b y -d o in g a n d r e p l i c a t i n g su c c e ssf u l m e t h o d s
t r a i n in g se m in a r s e .g . c o st -b e n e f i t a n a l y s i s
h o r i z o n t a l st u d ie s : p r o v id in g b a c k g r o u n d a d v i c e (e .g . st a t e a id ), sp r e a d in g b e st p r a c t i c e
5
JAS PE R S : part of a w ider c ontext
• JASPERS: not a one-off initiative • JASPERS is a technical assistance initiative; JEREMIE,
JESSICA are financial engineering initiatives • common elements: part of a wider movement in cohesion
policy over the past five years – joint actions and more efficient actions
• the idea of a joint approach with partners with compatible objectives is common to all
6
JAS PER S timeline
• Mid-2005: concept of a joint instrument agreed• 2006: core team in place, recruitment and framework contacts,
start of operations in late 2006• 2007: new staff arrive, regional offices in Warsaw, Vienna and
Bucharest open • 2008: JASPERS producing significant volume of output • November 2008: Economic Recovery Package: increase of 25%
in Commission contribution to JASPERS
7
JAS PER S S truc ture• Target staff: 85 expert staff in 2010 and 14 support staff• almost all experts are engineers or economists• 70% of experts are in the three regional offices close to
the beneficiaries• Commission contribution: €14 million in 2008, €24 million
in 2009, €26 million in 2010; • Contributions by other partners in staff time: EIB: 20 EBRD: 5 KfW:2
8
PrePre--feasibilityfeasibility Feasibility/EIAFeasibility/EIA Design/ProcurementDesign/Procurement ImplementationImplementation
Jaspers
Project Project ScreeningScreening
FS/EIA TORFS/EIA TOR
FS/EIA ReviewFS/EIA Review Tender assistance/ Tender assistance/ Contract PackagingContract Packaging
Project CycleProject Cycle
Timing of Jaspers Assistance and the Project CycleTiming of Jaspers Assistance and the Project Cycle
9
JAS PE R S : a mature ins trument
• 3 assignments completed for Member States in 2006, 22 in 2007, 82 in 2008 and133 in 2009
• 96 up to 22 September 2010• JASPERS now close to target capacity• considerable progress over the last year:• 160 applications with JASPERS assistance registered up to 22
September 2010, there were 75 at end August last year • 87 applications with JASPERS assistance approved to 22
September 2010; 26 at end August 2009
1 0
C urrent Portfolio
• JASPERS is working on 454 active projects at mid 2010• Major projects account for 83 % of the active projects,
horizontal 9 % and small projects 8 %• 2010 Action Plans contain 115 new actions• New actions across all sectors, especially in solid waste and
energy (40) and water (33)
1 1
C urrent Portfolio: S ummary
Source: JASPERS Database 1 June 2010
1 2
JAS PE R S in the future• More emphasis on the projects in the period after
approval of an EU grant, initially on a pilot basis• Preparing for post-2007-2013: a more up-stream role for
JASPERS to ensure a project pipeline for 2014 onwards • Capacity building: balance between learning by doing
projects and a targeted approach to creating capacity in the Members States
1 3