PREPREPREPRE----FEASIBILITY REPORTFEASIBILITY REPORTFEASIBILITY REPORTFEASIBILITY REPORT
ForForForFor
Proposed Organic Chemical Unit For Manufacturing of Esters, Surfactants/Sulphosuccinates,
Deformers/Antifoamers & Emulsifying Agents.
At
Plot No.- K-53, MIDC Butibori,
Dist. Nagpur, Maharashtra.
Proposed by
M/S. M/S. M/S. M/S. JEEJEEJEEJEEVIKA SPAKCHEM VIKA SPAKCHEM VIKA SPAKCHEM VIKA SPAKCHEM PRIVATEPRIVATEPRIVATEPRIVATE LIMITEDLIMITEDLIMITEDLIMITED
Prepared by
M/s. ENVIRO ANALYSTS & ENGINEERS PVT. LTD.
1
INDEX
Sr.No. Content Page No.
1.0 Executive Summary 2
2.0 Introduction of Project and Background Information 3
2.1 Identification of project & Project proponent 3
2.2 Nature of the project 3
2.3 Need for the project 4
2.4 Importance to the Country & Region 4
2.5 Employment Generation 4
3.0 Project Description 5
3.1 Type of the Project 5
3.2 Location 5
3.3 Size & Magnitude of Operation 5
3.4 Project Description 7
3.4.1 Products 7
3.4.2 Raw Materials 7
3.4.3 Process Description & Flow Diagram 8
3.5 Water Requirment & Distribution 17
3.5.1 Waste Water generation 18
3.6 Power & Fuel requirement 19
3.7 Purpose of EIA 20
4.0 Site Analysis 21
4.1 Connectivity 21
4.2 Existing Landuse 21
4.3 Existing Infrastructire 22
4.4 Climatic Details 22
4.5 Social Infrastructure 23
5.0 Planning Brief 24
5.1 Planning Concept 24
5.2 Man Power Requirement 24
5.3 Land use Planning 24
5.4 Facilities 25
5.4.1 Green Belt Development 25
5.4.2 Fire Fighting System 25
5.4.3 Storm Water Collection 25
5.4.4 Rainwater Harvesting 26
6.0 Proposed Infrastructure 27
7.0 Rehabilitation & Resettlement 28
8.0 Project Schedule 28
8.1 Proposed schedule and approval for implementation 28
8.2 Project Cost Estimation 28
9.0 Analysis of Proposal 29
2
1. EXECUTIVE SUMMARY
S.NO Details
1 Site Plot No. K - 53, MIDC , Butibori,Nagpur, Maharshtra.
2
Capacity
Esters
Surfactants / Sulphosuccinates
Defoamers / Antifoamers
Emulsifying agents
50 MT/ M
30 MT/M
50 MT/M
20MT/M
3 Water requirement 7 KLD
4 Power Requirement 1,34,280 Kwh. / Annum
5 Fuel Requirement LDO- 90 MT/ Annum, Diesel – 3000 Lit/Annum
6 DG Set 1 DG set (25 KVA)111111111111111
7 Project Cost 93 Lakhs
8. EMP Cost 9 Lakhs
3
2. INTRODUCTION OF PROJECT /BACKGROUND INFORMATION
2.1 Identification of the Project and Project Proponent
M/s. Jeevika Spakchem Pvt. Ltd. is an up-coming Organic Chemicals manufacturing industry having the
following aspects:
1. M/s Jeevika Spakchem Pvt Ltd, is planning to manufacture Organic Chemicals like
Easters/Surfactants/Defoamer/Antifoamers/Emulsifying agents.
2. The unit is coming up in MIDC, Butibori (Dist- Nagpur) having all infrastructure facilities viz.
CETP, Water, Power and labour.
3. The manufacturing process adopted by M/s Jeevika Spakchem Pvt ltd is simple and already a
proven process.
4. The chemicals which will be manufactured by the unit holds good market in Explosive
manufacturing units, Resin manufacturing units, Aluminum manufacturing units, Sugar
industries, Fertilizers industries etc., in India as well as outside India. The company has
confirmed orders from a foreign company namely Spic N Clean, located in Sydney Australia.
5. Defoamers/Antifoamers holds good demand from fertilizers industries particularly from
Southern part of India like Coramandel Fertilizers, Paradeep Phosphate, Sterlite Industries
etc. These chemicals also find use in the in oil drilling rigs and in sugar industry in their
Distilliery units. Similarly Sorbitol Easters like SMO is used for explosion in mining areas like
Chandrapur, Singrauli etc. Units of Premeir Explosives, Gulf Oil Corporation, Ideal Explosives,
Solar Explosives etc. are into mining industries and requires the product in Bulk quantities.
6. Nagpur is centrally located in the country and has big location advantage. Raw material
availability in the nearby areas is very good. The promoters of the unit are well educated
and highly experienced. The chief promoter has more than 40 years of industrial experience
of shop floor and as an Industrial consultant. The investment will be brought in as foreign
Direct Investment (FDI) by one of the directors of the company.
2.2 Nature of the Project
M/s. Jeevika Spakchem Pvt. Ltd. proposes to establish an organic chemicals manufacturing unit at MIDC,
Butibori.
4
2.3 Need for the project
India is a major producers of organic chemicals after the list of leading producers like USA, Germany, UK,
Japan and China. Few Latin American countries such as Brazil and Chile are increasing their presence in
global organic chemicals market. There are important numerous varieties of organic chemicals. Organic
chemicals manufactured and exported from India are methanol, acetic acid, formaldehyde and
phenol. Availability of natural gas for use as feedstock is a critical part of the entire production process.
Formaldehyde and acetic acid are important methanol derivatives and are used in numerous industrial
applications. Phenol is an aromatic compound and derived from Cumene, a benzene and propylene
derivative. Major organic chemicals in India are methanol, acetic acid, formaldehyde and phenol. These
four chemicals constitute more than 60% of domestic capacity for organic chemicals. Methanol has the
maximum share accounting for 20% of the total domestic capacity followed by acetic acid and
formaldehyde with 19% and 16% share respectively.
2.4 Importance to the Country and Region
Organic chemical is one of the important sectors of the Indian chemical industry. It has played a vital
development role by providing chemicals and intermediates as inputs to other industrial sectors like
paints, adhesives, pharmaceuticals, dye stuffs and intermediates, leather chemicals and pesticides.
Global production of organic chemicals is around 400 Mn metric tonnes per annum (mmtpa).
Production was just 15 Mn metric tonnes fifty years back. Major producers of organic chemicals are
USA, Germany, UK, Japan, China and India. Few Latin American countries such as Brazil and Chile are
increasing their presence in global organic chemicals market. There are important numerous varieties
of organic chemicals. Therefore, the chemical that M/S Jeevika Spakchem Pvt. Ltd. will surely have a
good market potential. They will surely have clients for Defoamer , Sulphosuccinate formulations from
fertilizer industry in Southern India and Sorbitan Mono Oleate (SMO) will attract Explosive market from
Chandrapur, Singrauli and Andhra Pradesh.
2.5 Employment Generation (Direct or Indirect due to the project)
Project will create direct & indirect employment opportunities within the surrounding region. Unit
will use good faith efforts to employ local people from the nearby villages depending upon the
availability of skilled & un-skilled man-power surrounding the project site.
In operation phase, the proposed project would require significant workforce of non-technical and
5
technical persons. Migration of highly education and skilled experience will result in increase of
literacy in the surrounding villages.
In addition, the proposed project shall enhance the prospects of employment.
6
3. PROJECT DESCRIPTION
3.1 Type of Project
The proposed project is an Organic Chemical manufacturing unit. It is an industrial project which will be
developed in notified industrial area.
3.2 Location
M/s. Jeevika Spakchem proposes to set up an Organic Chemical unit at plot of K-53, MIDC Industrial Area,
Butibori, Dist. Nagpur, Maharashtra. Google map is shown in Figure - 2.2.
3.3 Size/Magnitude of Operation
M/S Jeevika Spakchem proposes to manufacture Esters at 50 MT/ M and Surfactants / Sulphosuccinates
at 30 MT/M, Defoamers / Antifoamers at 50 MT/M and Emulsifying agents at 20 MT/M in an plot area of
1974 sq.mt.
7
3.4 Project Description
3.4.1 Products
Sr no Name of Products Capacity
1 Esters 50 MT/ M
2 Surfactants / Sulphosuccinates 30 MT/M
3 Defoamers / Antifoamers 50 MT/M
4 Emulsifying agents 20 MT/M
3.4.2 Raw materials
Sr no Name of Product Raw Material Quantity
1 S.M.S (Sorbitan Mono Stearate)
Yield 1600 Kg
Stearic Acid
Sorbitol
Caustic Soda
1056 Kg
677Kg
5 Kg
2 S.M.P (Sorbitan Mono Plamitate)
Yield 1600 Kg
Palmic Acid
Sorbitol
Caustic Soda
1400 Kg
1000 Kg
5 Kg
3 G.M.S. (Glycerol Mono Stearate)
Yield 1600 Kg
Stearic Acid
Glycerin
Caustic Soda
1270 Kg
411 Kg
3 Kg
4 S.M.O (Sorbitol Mono Oleate)
Yield 2200 Kg
Rice Bran Fatty Acid/Oleic Acid
Sorbitol
Caustic Soda
1450 Kg
935 Kg
4.1Kg
5 Di - Octyl Sulphosuccinate
Yield 1750Kg
(Stage I) 2 EHA
(2 Ethlyl hexa Alchol)
Meleic Anhydride
955 Kg
360 Kg
8
PTSA (Para Toluene Sulphonic Acid)
(Stage II) ON (Dioctyl Maleate)
Sodium Bi Sulphide
Methanol
14 Kg
800 Kg
260 Kg
400 Lit
6 Defoamers / Antifoamers
Yield 3000 Kg
S.M.O
O.S.A.A
FUSSAL OIL
1160 Kg
1780 Kg
80 Kg
3.4.3 Process Description & Flow Diagrams
3.4.3.1 S. M. S. (Sorbitan Monostearate)
Raw Material:
1. Stearic Acid - 1056 Kg
2. Sorbitol - 677 Kg
3. Caustic Soda – 5 Kg
Procedure: First of all charge Raw Material in reactor. Start heating and stirring. Add 5 Kg Caustic soda at
– 1400 C. G. Raise the temperature up to 2300 C. G. check the sample time to time. If the result of
sample is satisfactory cool the batch up to 800 C. G. If require charge sodium chlorite for bleaching start
flaker for unloading the batch. Yield = 1600 Kg.
9
F L O W C H A R T
MANUFACTURING OF SORBITON MONO STEARATE (S.M.S.)
Flow Chart Showing Manufacturing of Sorbiton Mono Sterate(S.M.S.)
SORBITOL MONO STEARATE
C17H35COOH + C6H8(OH)6 C17H35COOC6H7(OH)4 + 2H2O
Stearic Acid (284) SORBITOL (182) Catalyst NaOH S.M.S (430) Water (36)
10
3.4.3.2 S. M. P. (Sorbitan Mono Palmitate)
Raw Material :
1. Palmitic Acid – 1400 Kg
2. Sorbitol - 1000 Kg
3. Caustic Soda – 5 Kg
Procedure:
First of all charge Raw Material in reactor. Start heating and stirring. Add 54 Kg caustic soda at – 1400
C.G. Raise the temperature up to 2300 C. G. check the sample time to time. If the result of sample is
satisfactory cool the batch up to 800 C. G. If require charge sodium chlorite for bleaching start flaker for
unloading the batch.
Yield = 1600 Kg.
F L O W C H A R T
MANUFACTURING OF SORBITON MONO PALMITATE (S.M.P.)
Flow Chart Showing Manufacturing of Sorbiton Mono Palmitate
11
SORBITOL MONO PALMITATE
C15H31COOH + C6H8(OH)6 C15H31COOC6H7(OH)4 + 2H2O
Palmitic Acid (256) SORBITOL (182) Catalyst NaOH S.M.P (402) Water (36)
3.4.3.3 G. M. S. (Glycerol Monostearate)
Raw Material:
1. Stearic Acid – 1270 Kg
2. Glycerin - 411 Kg
3. Caustic Soda – 3 Kg
Procedure:
First of all charge Raw Material in reactor. Start heating and stirring. Add 3 Kg caustic soda at – 1400 C. G.
Rise the temperature up to 2300 C. G. check the sample time to time. If the result of sample is
satisfactory cool the batch up to 800 C. G. If require charge sodium chlorite for bleaching start flaker for
unloading the batch. Yield = 1600 Kg.
GLYCEROL MONO STEARATE REACTION
C17H35COOH + CH – OH
CH2 – OH
CH – OH
Stearic Acid (284) Glycerine (92)
Catalyst NaOH
12
CHCOOC17H35
CH2 – OH + H20
CH – OH
Glycerol Mono Stearate (358) Water (18)
F L O W C H A R T
MANUFACTURING OF GLYCEROL MONO STEARATE (G.M.S.)
Flow Chart Showing Manufacturing of Glycerol Mono Sterate (G.M.S.)
13
3.4.3.4 S. M.O. (Sorbitol Mono Oleate )
Raw Material:
1. Oleic Acid – 1450 kg
2. Sorbitol- 935 kg
3. Caustic Soda – 4.1 kg
Procedure:
First of allcharge Raw Material in reactor. Start heating and stirring. Add 3 Kg caustic soda at – 1400 C. G.
Rise the temperature up to 2300 C. G. check the sample time to time. If the result of sample is
satisfactory cool the batch up to 800 C. G. If require charge sodium chlorite for bleaching start flaker for
unloading the batch. Yield = 2200 Kg.
F L O W C H A R T
MANUFACTURING OF SORBITON MONO OLEATE (S.M.O.)
Flow Chart Showing Manufacturing of Sorbiton Mono Oleate
14
Reaction of Sorbitol Easters:
1. SORBITOL MONO OLEATE
C17H33COOH + C6H8(OH)6 C17H33COOC6H7(OH)4 + 2H2O
Oleic Acid (282) SORBITOL (182) Catalyst NaOH S.M.O (428) Water (36)
3.4.3.5 D.O.S. S. (Di Octyl Sulpho Succinate)
Raw Material :
1. Maleic Anhydride – 360 Kg
2. Ethyl Hexanol - 955 Kg
3. P.T.S.A as a catalyst –143 Kg
Procedure :
Stages I:-
1. Change raw material in required quantity.
2. Start heating with stirring.
3. Raise temperature upto 1300C
4. Cool the batch and transfer to intermediate tank.
Stages II:-
1. Change raw material in measured quantity.
2. Start heating with stirring.
3. Raise temperature upto 1000C
4. Cool the batch and unload.
15
F L O W C H A R T
MANUFACTURING OF DI OCTYL SULPHOSUCCINATE
STAGE – I
Mfg of Di- Octyl Maleate
Figure Error! No text of specified style in document..1 Flow Chart Showing Manufacturing of Di Octyl
Sulphosccinate
STAGE – II
Mfg of Octyl Sulphosuccinate
16
DI-OCTYL SULPHOSUCCINATE
A) Esterification Part
CH - CO
O + 2 CH3(CH2)3 – CH - CH2 - OH
CH – CO C2H5
Maleic Anhydride (98) 2-Ethyl Hexanol (2 X 130 = 260)
Catalyst P.T.S.
C2H5
CH - COOCH2 - CH (CH2)3 – CH3 + H2O
CH - COOCH2 - CH (CH2)3 – CH3
C2H5
Dioctyl Maleate (340) Water (18)
17
B) In the second stage digester i.e. Di-Octyl Maleate is sulphited by using Sodium Bisulphate in an
aqueous medium
C2H5
CH – COO-CH2 - CH (CH2)3 – CH3
+ NaHSO3
CH – COO-CH2 - CH (CH2)3 – CH
C2H5
Dioctyl Maleate (340) Sodium Bisulphite (104)
C2H5
CH2 – COO-CH2 - CH (CH2)3 – CH3
NaO3S - CH – COO-CH2 - CH(CH2)3 – CH3
C2H5
D.O.S.S ( 444)
3.5 Water Requirement & Distribution
The water requirement for the proposed project will be met from the MIDC supply. The daily water
requirement is about 7 m3/day. Details are shown in table below.
Sr. No. Purpose
Total
Requirement
(m3/day)
1 Domestic 1.0
2 Industrial Process 0.5
3 Industrial Cooling Tower 2.0
18
4 Reactors and Tool washing 1.5
5 Landscaping 2.0
TOTAL 7.0
3.5.1 Wastewater Generation
The wastewater generated from the project, as estimated, is given below with treatment scheme.
Sr.No. Source
Total
m3/ day
Losses
m3/day
Effluent
Generation
m3/ day
Mitigation
1 Domestic 1
0.25
(human
consumption)
0.75 To Septic Tanks followed by Soak Pits.
Overflow will be used for gardening
2 Industrial
i
Industrial
cooling &
boiler Feed
2
2
(Evaporation)
- -
iii
Processing
Non-
Biodegradable
(Chemical
Reaction outlet
& Reactor)
2
(Evaporation)
2 To ETP for primary treatment & sent to
CETP, Butibori
iv Tree plantation
and Gardening2 2 - -
19
3.5.2 Power and Fuel Requirement
Total power requirement for Existing project is 50 HP. The required power will be sourced from MSEB in
construction and operation phase. DG set 1 No. of capacity 25 KVA will be used as back up for
emergency. The details of fuel requirement are as given below:
Table Error! No text of specified style in document..8 Power Requirement
Sr. No. Name of Machinery HP
1) Jacklled Reactor Kettles 10
2) Heat Exchangers /Condensers 7
3) Thermic Fluid heater 2 lacs kcal/hr 10
4) Cooling Tower 15
5) Pumps 5
6) Filter 3
7) Weight Scale
8) Lab Equipments
9) Other Misc Machinery
Total 50 HP
Table Error! No text of specified style in document..9 Fuel Requirement
S. No. Type of Fuel Proposed
1 LDO (For Boiler) 90 MT/ Annum
2 Diesel (DG set) 3000 Lit//Annum
20
3.6 Purpose of EIA
21
4 SITE ANALYSIS
4.1 Connectivity
4.2 Existing Landuse Pattern
Butibori is an industrial suburb of Nagpur, India and is developed as 5 Star Industrial district by
Maharashtra Industrial Development Corporation (MIDC). Butibori's total area acquired is 23.12 square
kilometres out of which 14.94 km² is developed. The area is developed economic development of Nagpur
city. The area receives water supply from Wadgaon Dam. Butibori also claims Maharashtra's first Food-
Park. In order to invite textile industries a common effluent treatment plant is also built.
It is just 14 km from the Municipal limits of Nagpur city. Units like Indo Rama, Acc Nihon, Woolworth,
Fabworth, Whirlpool, Morarjee Mills, KEC, Dinshaws have already commenced operation with other
industry giants waiting in the wings.
The land use/ land cover details are given in Table 3.1 below and also as Figure 3.3 for the study area and
the core area.
Table 3.1 Land Use/ Land cover details of study area
S.NO Land Use Area ( sq. m)
1 Settlements 855
2 Industry/Institutional Land 1343
Sr.No. Particulars Details
6 Nearest Road MIDC Road (Adjacent)
7 Nearest Highway Highway NH 7 ( 5 Km)
8 Nearest Railway Station Butibori Railway Station (7 km)
9 Nearest Bus Station Butibori Bus Station (5 km)
10 Nearest Airport Dr. Babasaheb Ambedkar International Airport (28 km)
22
3 Dry Deciduous Forest 320
4 Degraded Scrub Land 295
5 Forest Blank 298
6 Plantation 124
7 Double Crop/Irrigated Land 5217
8 Other Agriculture Land 13136
9 Land with Scrub 5534
10 Land without Scrub 3227
11 Rocky/Stony Barren Land 73
12 Quarry/Mining Land 241
13 Water Body 751
4.3 Existing Infrastructure
The proposed land is vacant. This is a new Industrial set up in MIDC area.
4.4 Climatic Details
Nagpur's farness from the sea is responsible for its dry and mildly humid climatic conditions that
remains for most part of the year. It experiences primarily three main seasons-summers, winters and
monsoon with fluctuations in temperature.
Summers arrive usually during March and lasts till June characterized by dryness and high temperature
shooting up to 43 degree C in the month of May.
The South-westerly monsoons set in June and the city gets heavy rainfall till September.
The annual average daily maximum temperature in year 2010 was 43°C whereas annual average daily
minimum temperature is 13°C. Average Relative Humidity recorded in year 2010 in the month of August
was 80 % & Relative humidity was recorded as 24% in the month of April. The Rainfall was the highest in
the month of July & August, 352 and 278 mm respectively.
23
4.5 Social Infrastructure
� Educational facilities are available in the form of primary and secondary schools. Mostly high
schools are private in nature. For higher education the students are availing facilities from
Butibori and Nagpur.
� Medical facilities are good in the study area, Primary Health Centre at Butibori is imparting
services, for advance medical facilities people are going to Nagpur. In each village one health
worker has been appointed by the Govt. to provide primary health facilities.
� Village people are availing Drinking water facilities generally from the Hand pump, open well
and tap water. The water supply is also supplied through tanker in few villages. During summer
scarcity of water has been noted in the study area.
� Communication services like post office and telephones are available in the study area. Some of
the villagers are having mobile phones.
� 100% villages in the study area are electrified. Electricity is available for domestic and in few
areas for agriculture purpose.
24
5. PLANNING BRIEF
5.1 Planning Concept
M/s. Jeevika Spakchem Pvt. Ltd. proposes to establish an organic chemicals manufacturing unit to
produce Esters at 50 MT/ M and Surfactants / Sulphosuccinates at 30 MT/M, Defoamers / Antifoamers
at 50 MT/M and Emulsifying agents at 20 MT/M. They are situated in notified industrial area i.e.
MIDC,Butibori.
5.2 Man Power requirement:
Man power requirement for the construction phase is 20 Nos. and operation phase will be estimated as
15 Nos. Most of the employees will be recruited from neighboring village after testing their skilled
abilities.
5.3 Landuse Planning:
Sr.No. Description Area (Sq. m)
1 Factory Shed Area 430.75
2 Lab Area & Reception 90.112
3 Office Area 90.112
4 Tank Platform 44.00
5 ETP 48.17
6 Road & Open Spaces 619.436
7 Green Belt Area (33% of Total area) 651.42
Total plot area 1974.00
25
5.4 Facilities Provided:
5.4.1 Landscaping and Greenbelt Development
Adequate land will be available for open spaces and other non-building purposes. 651.42 sq. mt. will be
reserved for green cover / lawn development in the proposed facility. Suitable plant species (40 Nos) of
local varieties will be planted with adequate spacing and density for their fast growth and survival shall
be ensured by taking due care.
5.4.2 Fire Fighting System
The proposed Project design and development has been planned with utmost care and all provisions
have been made for the safety and security of the plant and personnel.
For protection of the facility against fire, all the blocks and yards are equipped with any one or a
combination of the following fire fighting systems:
• Hydrant System;
• Fire Detection and Alarm System; and
• Different types of Fire Extinguishers.
For storage of water for fire fighting in case of emergency, a separate provision of 15000 liter/capacity
reservoir is provided. This will serve the fire fighting needs of the project. Beside this fire extinguishers
will also be installed
In order to provide easy access to the fire tenders to extinguish fire in case of fire accidents, the fire
tender tracks have been provided at the building blocks.
5.4.3 Storm Water-Collection and Disposal
Storm water drains will be provided and Storm water from the entire plot will be collected through
network of storm drains. Most of storm water from plot area will be collected in the rainwater
harvesting pond provided for better utilization of available
5.4.4 Rain Water Harvesting System
Rainwater harvesting will be proposed in the project to conserve the storm water. To prevent the
monsoon rain water going waste through storm drains, rain water shall be collected and reused for
greenery development & allowed to feed into the sub-soil so as to raise the ground water level. This will
enhance the groundwater potential while raising the water tables in the area.
26
6. PROPOSED INFRASTRUCTURE
S.NO Details
1 Industrial Area 1974 sq.mt.
2 Residential Area
Not Applicable
3 Connectivity Nearest Highway: Highway NH 7 ( 5 Km)
Nearest Road: MIDC Road
Nearset Railway Station: Butibori Railway Station (7 km)
4 Green Belt 651.42 sq. mt. will be reserved for green cover / lawn
development in the proposed facility.
5 Water Management Source: MIDC Supply : 7.0 m3/day
6 Power Management Source: MSEB Supply: 50 HP
7 Waste Water Industrial Effluent treated in proposed ETP and then sent to
CETP Butibori.
Domestic Effluent treated in soak pits and overflow used for
gardening
8 Solid Waste Management Biodegradable solid waste sent for composting
9 Hazardous waste Management Hazardous Waste will send to CHWTDPS
27
7. REHABILITATION & RESETTLEMENT PLAN
Since the project is in notified industrial area i.e. MIDC Butibori, R&R is not applicable to this project.
28
8. PROJECT SCHEDULE
8.1 Proposed schedule and approval for implementation
The Proposed project shall be established after getting the Environmental Clearance from the SEIAA &
consents from MPCB.
8.2 Project Cost Esimation
Estimated Project Cost for the proposed project is 93 lakhs.
29
9. ANALYSIS OF PROPOSAL
Project will create direct & indirect employment opportunities within the surrounding region. Unit
will use good faith efforts to employ local people from the nearby villages depending upon the
availability of skilled & un-skilled man-power surrounding the project site.
In operation phase, the proposed project would require significant workforce of non-technical and
technical persons. Migration of highly education and skilled experience will result in increase of
literacy in the surrounding villages.
In addition, the proposed expansion of project shall enhance the prospects of employment.
Assessment of the potential socioeconomic benefits during construction
focused primarily on work force requirements, acquisition of supplies, and the
temporary increased demand for services related to the construction project like
food, housing, communications, law enforcement, medical care, local transportation
etc. Due to these, additional revenue to local suppliers for required products and
services related to the construction and operation phases of the project will generate.
Thus, construction activities will provide numerous new, although temporary, work opportunities for
both skilled and unskilled labor, as well as contribute significantly to the local economy.
Additional government revenue expected from royalty, taxes, duties and other fees.
An added benefit to the proposed project will result in considerable growth of stimulating the
industrial and commercial activities in the state. Small and medium scale industries may be further
developed as a consequence.
Environmental Impact AssessmentEnvironmental Impact AssessmentEnvironmental Impact AssessmentEnvironmental Impact Assessment ReportReportReportReport
ForForForFor
Proposed Organic Chemical Plant For Manufacturing of Esters, Surfactants/Sulphosuccinates,
Deformers/Antifoamers & Emulsifying Agents.
JEEVIKA SPAKCHEM PVT.LTD.
At
Plot No.- K-53, MIDC Butibori,
Dist. Nagpur, Maharashtra.
Proposed by
M/S. M/S. M/S. M/S. JEEVIKA SPAKCHEM PRIVATEJEEVIKA SPAKCHEM PRIVATEJEEVIKA SPAKCHEM PRIVATEJEEVIKA SPAKCHEM PRIVATE LIMITEDLIMITEDLIMITEDLIMITED
Prepared by
M/s. ENVIRO ANALYSTS & ENGINEERS PVT. LTD.
CONTENTS
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
1
Contents
INTRODUCTION ............................................................................................................................. 3
1.1 PURPOSE OF THE REPORT .....................................................................................................................3
1.2 IDENTIFICATION OF PROJECT & PROJECT PROPONENT ....................................................................3
1.3 BRIEF DESCRIPTION OF PROJECT ..................................................................................................4 1.3.1 Nature of the Project ......................................................................................................................4
1.3.2 SIZE OF THE PROJECT ..............................................................................................................................4
1.3.3 Location of Project ..........................................................................................................................5
1.3.4 Importance to the Country and Region .........................................................................................5
1.4 SCOPE OF THE STUDY ............................................................................................................................5
2. PROJECT DESCRIPTION ....................................................................................................... 7
2.1 LAND USE ................................................................................................................................................7
2.2 TYPE OF PROJECT ..................................................................................................................................7
2.3 NEED OF THE PROJECT ....................................................................................................................7
2.4 LOCATION ...............................................................................................................................................8 2.5 SIZE OR MAGNITUDE OF OPERATION ................................................................................................ 10
2.6 PROPOSED SCHEDULE AND APPROVAL FOR IMPLEMENTATION ...................................................... 10
2.7 PRODUCTS, TECHNOLOGY AND PROCESS DESCRIPTION ................................................................. 10
2.7.2 Technology and Process Description: .......................................................................................... 10
2.8 PROJECT REQUIREMENTS ................................................................................................................... 20
2.8.1 Raw Materials ................................................................................................................................ 20
2.8.2 Storage of Raw Materials: ............................................................................................................ 20
2.8.2 Water Environment & Pollution Control....................................................................................... 20
2.8.3 Power and Fuel Requirement ....................................................................................................... 22 2.8.4 Man Power ..................................................................................................................................... 23
2.8.5 Solid & Hazardous Waste Generation .......................................................................................... 23
2.8.6 Landscaping and Greenbelt Development ................................................................................... 23
2.8.7 Fire Fighting System ..................................................................................................................... 23
2.8.8 Storm Water-Collection and Disposal .......................................................................................... 24
3. DESCRIPTION OF THE ENVIRONMENT ............................................................................. 26
3.1 INTRODUCTION.................................................................................................................................... 26
3.2 Methodology ..................................................................................................................................... 26
3.3 PHYSICAL ENVIRONMENT ................................................................................................................... 27
3.3.1 Geology and Geomorphology .............................................................Error! Bookmark not defined. Structural Network ........................................................................................Error! Bookmark not defined.
Economic Minerals ........................................................................................Error! Bookmark not defined.
3.3.1.2 Geomorphology .......................................................................................................................... 28
3.4 LAND ENVIRONMENT ........................................................................................................................... 29
3.4.1 Objectives ...................................................................................................................................... 29
3.4.2 Methodology .................................................................................................................................. 29
Remote Sensing Data Used ................................................................................................................... 29
Collateral Data: ....................................................................................................................................... 29 3.4.3 Land use in Study Area................................................................................................................. 31
3.5 SOIL CHARACTERISTICS ...................................................................................................................... 33
3.5.1 Data Generation ............................................................................................................................ 33
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
2
3.5.2 Physico-chemical Properties of Soil ............................................................................................. 34
3.6 BIOLOGICAL ENVIRONMENT ............................................................................................................... 34
3.6 AIR ENVIRONMENT .............................................................................................................................. 47
3.6.1 Meteorology ................................................................................................................................... 47
3.6.2 Methodology .................................................................................................................................. 48 3.6.3 Methodology of Data Generation ................................................................................................. 48
3.6.3.2.2 Analysis of Meteorological Data Recorded at Site ................................................................ 49
3.6.4 Air Quality ...................................................................................................................................... 50
3.7 NOISE LEVEL SURVEY .......................................................................................................................... 53
3.7.1 Identification of Sampling Locations ............................................................................................ 54
3.7.2 Method of Monitoring .................................................................................................................. 55
3.8 WATER QUALITY .................................................................................................................................. 56
3.8.1 Methodology .................................................................................................................................. 56
4. ENVIRONMENTAL IMPACTS & MITIGATION MEASURES ......................................... 66
CONSTRUCTION PHASE: ............................................................................................................ 71
OPERATION PHASE: .................................................................................................................... 72
5. ENVIRONMENTAL MONITORING PROGRAMME ............................................................. 83
5.1 INTRODUCTION.................................................................................................................................... 83
5.3 PROPOSED MONITORING PROGRAM .................................................................................................. 83
6. PROJECT BENEFITS ............................................................................................................. 86
7. RISK ASSESSMENT ................................................................................................................. 88
8. ENVIRONMENTAL COST BENEFIT ANALYSIS ............................................................... 97
8.1 ENVIRONMENTAL COST: ............................................................................................................................ 97
8.2 ENVIRONMENTAL BENEFITS: ...................................................................................................................... 97
9. ENVIRONMENTAL MANAGEMENT PLAN ........................................................................... 98
9.5 COST PROVISION FOR ENVIRONMENTAL MEASURES ..................................................................... 103
10. CONCLUSION ....................................................................................................................... 104
11. DISCLOSURE OF CONSULTANTS ................................................................................ 106
ENVIRONMENTAL CONSULTANT ....................................................................................................................... 106
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
3
1. INTRODUCTION
1.1 PURPOSE OF THE REPORT
M/s. Jeevika Spakchem Pvt. Ltd. proposes to develop an Industrial unit at Plot No: K – 53, MIDC
Industrial Area, Butibori, Dist.- Nagpur, Maharashtra. As per the EIA notification dated on 14th
September, 2006 the proposed project is categorized under Project- 5 (f) B
M/s. Enviro Analysts & Engineers Pvt. Ltd. have been retained by M/s. Jeevika Spakchem Pvt. Ltd., to
undertake Environmental Impact Assessment (EIA) studies covering an area of 10 km radius from the
project site, to assess the impacts of this Industrial Project on various environmental components i. e.
Air, Water, Land, Noise, Socio-economic etc. in the study area and prepare Environmental Impact
Assessment report along with Environment Management Plan to mitigate the adverse impacts of the
project.
This project was presented in the 49th SEAC meeting, but due to some inadequacies in the EIA report,
committee asked to resubmit the updated EIA report incorporated with the points given in 49th
minutes of meeting.
1.2 IDENTIFICATION OF PROJECT & PROJECT PROPONENT
M/s. Jeevika Spakchem Pvt. Ltd. is an up-coming Organic Chemicals manufacturing industry having
the following aspects:
1. M/s Jeevika Spakchem Pvt Ltd, is planning to manufacture Organic Chemicals like
Easters/Surfactants/Defoamer/Antifoamers/Emulsifying agents.
2. The unit is coming up in MIDC, Butibori (Dist- Nagpur) having all infrastructure facilities
viz. CETP, Water, Power and labour.
3. The manufacturing process adopted by M/s Jeevika Spakchem Pvt ltd is simple and
already a proven process.
4. The chemicals which will be manufactured by the unit holds good market in Explosive
manufacturing units, Resin manufacturing units, Aluminum manufacturing units, Sugar
industries, Fertilizers industries etc., in India as well as outside India. The company has
confirmed orders from a foreign company namely Spic N Clean, located in Sydney
Australia.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
4
5. Defoamers/Antifoamers holds good demand from fertilizers industries particularly from
Southern part of India like Coramandel Fertilizers, Paradeep Phosphate, Sterlite Industries
etc. These chemicals also find use in the in oil drilling rigs and in sugar industry in their
Distilliery units. Similarly Sorbitol Easters like SMO is used for explosion in mining areas
like Chandrapur, Singrauli etc. Units of Premeir Explosives, Gulf Oil Corporation, Ideal
Explosives, Solar Explosives etc. are into mining industries and requires the product in Bulk
quantities.
6. Nagpur is centrally located in the country and has big location advantage. Raw material
availability in the nearby areas is very good. The promoters of the unit are well educated
and highly experienced. The chief promoter has more than 40 years of industrial
experience of shop floor and as an Industrial consultant. The investment will be brought in
as foreign Direct Investment (FDI) by one of the directors of the company.
1.3 BRIEF DESCRIPTION OF PROJECT
1.3.1 Nature of the Project
M/s. Jeevika Spakchem Pvt. Ltd. proposes to establish an organic chemicals manufacturing unit to
produce Esters at 50 MT/ M and Surfactants / Sulphosuccinates at 30 MT/M, Defoamers /
Antifoamers at 50 MT/M and Emulsifying agents at 20 MT/M .
1.3.2 Size of the Project
Proposed project will be developed on a unit at plot no. K - 53, MIDC, Butibori, Nagpur. Brief
information of the project is given in Table -1.1.
Table 1.1 Brief information of the Project
S.NO Details
1 Site Plot No. K - 53, MIDC , Butibori,Nagpur, Maharshtra.
2 Capacity
Esters
Surfactants / Sulphosuccinates
Defoamers / Antifoamers
Emulsifying agents
50 MT/ M
30 MT/M
50 MT/M
20MT/M
3 Water requirement 7 KLD
4 Power Requirement 1,34,280 Kwh. / Annum
5 Fuel Requirement LDO- 90 MT/ Annum, Diesel – 3000 Lit/Annum
6 DG Set 1 DG set (25 KVA)111111111111111
7 Project Cost 93 Lakhs
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
5
8 EMP Cost 9 Lakhs/Annum
1.3.3 Location of Project
M/s. Jeevika Spakchem plans to set up an Organic Chemical unit to manufacture Esters, Surfactants /
Sulphosuccinates, Defoamers /Antifoamers and Emulsifying agents, at plot no. K-53, MIDC Industrial
Area, Butibori, Dist. Nagpur, Maharashtra. This unit is located within notified MIDC Area. Some of the
neighboring industrial units which are located within Butibori, MIDC area are Star Orechem
International Pvt. Ltd., Moraji textiles Pvt. Ltd., Gammon India Pvt. Ltd. Inventys Research company
.Ltd., Arc Tec System Ltd., Dinshaws Food Pvt. Ltd., Kasenor Charbuja Ltd., Inventetys Research
Company Ltd., etc.
1.3.4 Importance to the Country and Region
Organic chemical is one of the important sectors of the Indian chemical industry. It has played a vital
development role by providing chemicals and intermediates as inputs to other industrial sectors like
paints, adhesives, pharmaceuticals, dye stuffs and intermediates, leather chemicals and pesticides.
Global production of organic chemicals is around 400 Mn metric tonnes per annum (mmtpa).
Production was just 15 Mn metric tonnes fifty years back. Major producers of organic chemicals are
USA, Germany, UK, Japan, China and India. Few Latin American countries such as Brazil and Chile are
increasing their presence in global organic chemicals market. There are important numerous varieties
of organic chemicals. Therefore, the chemical that M/S Jeevika Spakchem Pvt. Ltd. will surely have a
good market potential. They will surely have clients for Defoamer , Sulphosuccinate formulations
from fertilizer industry in Southern India and Sorbitan Mono Oleate (SMO) will attract Explosive
market from Chandrapur, Singrauli and Andhra Pradesh.
1.4 SCOPE OF THE STUDY
The area falling within 10-km radius from the proposed project site is defined as the study area. It
broadly covers:
• To conduct literature survey and review, to collect relevant data of the study area
• To prepare material balance, water regime and process technology
• Establishing the baseline environmental aspects in and around the proposed site
• Predicting incremental levels of pollutants in the study for the proposed project
development
• Evaluating the predicted impacts on various environmental attributes in the study
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
6
area by using scientifically developed and widely accepted environmental impact
assessment methodologies
• To prepare an Environment Management Plan (EMP), outlining the measures for
improving the environmental quality in view of future expansion for environmentally
sustainable development.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
7
2. PROJECT DESCRIPTION
2.1 LAND USE
The proposed project is planned in an area of 1974 sq.mt. The detail of the land use is given in
Table-2.1.
Table 2.1 Details of Plot Land Use
# Description Area (Sq. m)
1 Factory Shed Area 430.75
2 Lab Area & Reception 90.112
3 Office Area 90.112
4 Tank Platform 44.00
5 ETP 48.17
6 Road & Open Spaces 619.436
7 Green Belt Area (33% of Total area) 651.42
Total plot area 1974.00
2.2 TYPE OF PROJECT
The proposed project is an Organic Chemical manufacturing unit. It is an industrial project which
will be developed in notified industrial area.
2.3 NEED OF THE PROJECT
India is a major producers of organic chemicals after the list of leading producers like USA,
Germany, UK, Japan and China. Few Latin American countries such as Brazil and Chile are
increasing their presence in global organic chemicals market. There are important
numerous varieties of organic chemicals. Organic chemicals manufactured and exported
from India are methanol, acetic acid, formaldehyde and phenol. Availability of natural gas
for use as feedstock is a critical part of the entire production process. Formaldehyde and
acetic acid are important methanol derivatives and are used in numerous industrial
applications. Phenol is an aromatic compound and derived from Cumene, a benzene and
propylene derivative. Major organic chemicals in India are methanol, acetic acid,
formaldehyde and phenol. These four chemicals constitute more than 60% of domestic
capacity for organic chemicals. Methanol has the maximum share accounting for 20% of
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
8
the total domestic capacity followed by acetic acid and formaldehyde with 19% and 16%
share respectively.
2.4 LOCATION
M/s. Jeevika Spakchem proposes to set up an Organic Chemical unit at plot of K-53, MIDC Industrial
Area, Butibori, Dist. Nagpur, Maharashtra. The proposed project is located at intersection of latitude
200 56’ 32.95”N and longitude 78° 57' 39.72"E. The environmental setting around the proposed site is
given in Table-2.2. Project site map is shown in Figure 2.1 & Google map is shown in Figure - 2.2. Site
layout is attached with the report.
Table 2.2 Environmental Setting of the Proposed Project
# Particulars Details
1 Latitude 20° 56’ 32.95”N
2 Longitude 78° 57’ 39.72”E
3 Elevation above MSL 943 ft above Mean Sea Level
4 Climatic Conditions Annual Maximum Temperature : 45° C
Annual Minimum Temperature : 20° C
5 Present land use at the proposed site Industrial
6 Nearest Road MIDC Road (Adjacent)
7 Nearest Highway Highway NH 7 ( 5 Km)
8 Nearest Railway Station Butibori Railway Station (7 km)
9 Nearest Bus Station Butibori Bus Station (5 km)
10 Nearest Airport Dr. Babasaheb Ambedkar International Airport (28
km)
11 Ecologically sensitive zones within 15-
km distance Nil
12 Historical/ Archaeological places Nil
13 Seismic Zone Zone –II
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
9
Figure 2.1 Map Showing the Project Site
Figure 2.2 Google Image
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
10
Table 2.3 List of Neighboring Units
Sr.
No. Name Of Unit
Unit
No. Activity
1 SOIL (Star Orechem India
Limited) G-54
Oxime, Xanthate, Polyacrylamide, Surfactants and Phthalate
and by-products
2 Gammon India Ltd. G-55 Tower Structure Projects & Store
3 Morarjee Textile Ltd. G-2 Exporter / Manufacturer / Supplier of fabrics
4 Dinshaws Foods Pvt. Ltd. K-
41/42 Manufacturer Foods products
5 Inventys Research
Company Ltd K-38
Manufacturer & Supplier of
S- methyl phenyl glycine methyl ester
6 Arc Tec system Ltd K-48 Welding & cutting
2.5 SIZE OR MAGNITUDE OF OPERATION
M/S Jeevika Spakchem proposes to manufacture Esters at 50 MT/ M and Surfactants /
Sulphosuccinates at 30 MT/M, Defoamers / Antifoamers at 50 MT/M and Emulsifying agents at 20
MT/M in an plot area of 1974 sq.mt.
2.6 PROPOSED SCHEDULE AND APPROVAL FOR IMPLEMENTATION
The proposed project shall be established after getting the Environmental Clearance from the
SEIAA/SEAC and consents from MPCB.
2.7 PRODUCTS, TECHNOLOGY AND PROCESS DESCRIPTION
2.7.1 Products: The capacities of the products are given in Table No.-2.4.
Table 2.4 List of products along with production capacity
Sr no Name of Products Capacity
1 Esters 50 MT/ M
2 Surfactants / Sulphosuccinates 30 MT/M
3 Defoamers / Antifoamers 50 MT/M
4 Emulsifying agents 20 MT/M
2.7.2 Technology and Process Description:
2.7.2.1 Manufacturing Process
The product mix considered is as under:-
1. Esters – 50 MT / Month
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
11
2. Sulphosuccinate / Surfactants -30 MT / Month
3. Defoamers / Antifoamers – 50 MT / Month
4. Emulsifying Agents – 20 MT / Month
1. Esters :- Manufacturing process of sorbiton Ester or Glycerol / Polyol Esters are almost
same. Fatty acid and Sorbital ot Glycerol is charged in reactor and temp. is raised with
stirring. At 180 degree C catalyst is added and again temperature is raised and maintained
at certain high temperature to get required reaction level which is determined either by
acid value or viscosity. Then the whole mass is cooled and bleached if required. The
reaction takes place at atmospheric pressure and under nitrogen purging. After completion
of process material is filled in drums. In sorbiton esters app.122 Kg of water effluent comes
out and similarly about 10 kg of fatty matter comes out. Hence total quantity of effluent
comes out from the process per day based on 6MT installed capacity would be 450/500
liters max. and the fatty matters(oil & proteins) which normally floats on the waste water
would be around 10 kg/day.
2. Sulphosuccinate / Surfactants :- Sulphosuccinate is manufactured two step reaction. In
first step Octanol and Maleic Anhydried is charged in reactor with catalyst and temperature
is raised to approx. 130 degree C and maintained until required acid value is achieved. In
second step a part of 1st step is charged in reactor with sodium Bisulphite and temperature
is raised a little until the reaction starts. It is a exothermic reaction and temperature is
maintained below 100 degree C by cooling. Then material is diluted with water and
methanol mixture to get required strength. In this reaction no water effluent comes out
from the process as all the raw materials get consumed in the process.
3. Foamers and Defoamers: - Defoamers and antifoamers are manufactured by blending
esters and Sulphosuccinate with water. During blending nothing comes out. For blending
purpose of P.P. tank of 3000 liters capacity has been considered.
4. Surfactants: - Shampoo surfactants is two step reaction. In 1st step DMAPA and coconut
oil/PK oil are charged in reactor with catalyst and temp. is raised to appox. 150 degree C
with stirring and temperature is maintained until required amine value is achieved. Then
whole mass is cooled. In second step 1st step material is charged in reactor with soft water,
caustic soda and moniochloro acetate. Temperature is raised with stirring to 70-80 degree
and temperature is maintained to get required quality. Then mass is cooled and filled in
drums/carbuoys. During process nothing comes out.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
12
2.7.2.1 S. M. S. (Sorbitan Monostearate)
Raw Material:
1. Stearic Acid - 1056 Kg
2. Sorbitol - 677 Kg
3. Caustic Soda – 5 Kg
Procedure: First of all charge Raw Material in reactor. Start heating and stirring. Add 5 Kg Caustic soda
at – 1400 C. G. Raise the temperature up to 2300 C. G. check the sample time to time. If the result of
sample is satisfactory cool the batch up to 800 C. G. If require charge sodium chlorite for bleaching
start flaker for unloading the batch. Yield = 1600 Kg.
F L O W C H A R T
MANUFACTURING OF SORBITON MONO STEARATE (S.M.S.)
Figure 2.2 Flow Chart Showing Manufacturing of Sorbiton Mono Sterate(S.M.S.)
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
13
SORBITOL MONO STEARATE
C17H35COOH + C6H8(OH)6 C17H35COOC6H7(OH)4 + 2H2O
Stearic Acid (284) SORBITOL (182) Catalyst NaOH S.M.S (430) Water (36)
2.7.2.2 S. M. P. (Sorbitan Mono Palmitate)
Raw Material :
1. Palmitic Acid – 1400 Kg
2. Sorbitol - 1000 Kg
3. Caustic Soda – 5 Kg
Procedure:
First of all charge Raw Material in reactor. Start heating and stirring. Add 54 Kg caustic soda at – 1400
C.G. Raise the temperature up to 2300 C. G. check the sample time to time. If the result of sample is
satisfactory cool the batch up to 800 C. G. If require charge sodium chlorite for bleaching start flaker
for unloading the batch.
Yield = 1600 Kg.
F L O W C H A R T
MANUFACTURING OF SORBITON MONO PALMITATE (S.M.P.)
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
14
Figure 2.3 Flow Chart Showing Manufacturing of Sorbiton Mono Palmitate
SORBITOL MONO PALMITATE
C15H31COOH + C6H8(OH)6 C15H31COOC6H7(OH)4 + 2H2O Palmitic Acid (256) SORBITOL (182) Catalyst NaOH S.M.P (402) Water (36)
2.7.2.3 G. M. S. (Glycerol Monostearate)
Raw Material:
1. Stearic Acid – 1270 Kg
2. Glycerin - 411 Kg
3. Caustic Soda – 3 Kg
Procedure:
First of all charge Raw Material in reactor. Start heating and stirring. Add 3 Kg caustic soda at – 1400 C.
G. Rise the temperature up to 2300 C. G. check the sample time to time. If the result of sample is
satisfactory cool the batch up to 800 C. G. If require charge sodium chlorite for bleaching start flaker
for unloading the batch. Yield = 1600 Kg.
GLYCEROL MONO STEARATE REACTION
C17H35COOH + CH – OH
CH2 – OH
CH – OH
Stearic Acid (284) Glycerine (92)
Catalyst NaOH
CHCOOC17H35
CH2 – OH + H20
CH – OH
Glycerol Mono Stearate (358) Water (18)
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
15
F L O W C H A R T
MANUFACTURING OF GLYCEROL MONO STEARATE (G.M.S.)
Figure 2.4 Flow Chart Showing Manufacturing of Glycerol Mono Sterate (G.M.S.)
2.7.2.4 S. M.O. (Sorbitol Mono Oleate )
Raw Material:
1. Oleic Acid – 1450 kg
2. Sorbitol- 935 kg
3. Caustic Soda – 4.1 kg
Procedure:
First of allcharge Raw Material in reactor. Start heating and stirring. Add 3 Kg caustic soda at – 1400 C.
G. Rise the temperature up to 2300 C. G. check the sample time to time. If the result of sample is
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
16
satisfactory cool the batch up to 800 C. G. If require charge sodium chlorite for bleaching start flaker
for unloading the batch. Yield = 2200 Kg.
F L O W C H A R T
MANUFACTURING OF SORBITON MONO OLEATE (S.M.O.)
Figure 2.5 Flow Chart Showing Manufacturing of Sorbiton Mono Oleate
Reaction of Sorbitol Easters:
1. SORBITOL MONO OLEATE
C17H33COOH + C6H8(OH)6 C17H33COOC6H7(OH)4 + 2H2O
Oleic Acid (282) SORBITOL (182) Catalyst NaOH S.M.O (428) Water (36)
2.7.2.5 D.O.S. S. (Di Octyl Sulpho Succinate)
Raw Material :
1. Maleic Anhydride – 360 Kg
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
17
2. Ethyl Hexanol - 955 Kg
3. P.T.S.A as a catalyst –143 Kg
Procedure :
Stages I:-
1. Change raw material in required quantity.
2. Start heating with stirring.
3. Raise temperature upto 1300C
4. Cool the batch and transfer to intermediate tank.
Stages II:-
1. Change raw material in measured quantity.
2. Start heating with stirring.
3. Raise temperature upto 1000C
4. Cool the batch and unload.
F L O W C H A R T MANUFACTURING OF DI OCTYL SULPHOSUCCINATE
STAGE – I
Mfg of Di- Octyl Maleate
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
18
Figure 2.6 Flow Chart Showing Manufacturing of Di Octyl Sulphosccinate
STAGE – II
Mfg of Octyl Sulphosuccinate
DI-OCTYL SULPHOSUCCINATE
A) Esterification Part
CH - CO
O + 2 CH3(CH2)3 – CH - CH2 - OH
CH - CO
C2H5
Maleic Anhydride (98) 2-Ethyl Hexanol (2 X 130 = 260)
Catalyst P.T.S.A
C2H5
CH - COOCH2 - CH (CH2)3 – CH3
+ H2O
CH - COOCH2 - CH (CH2)3 – CH3
C2H5
Dioctyl Maleate (340) Water (18)
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
19
B) In the second stage digester i.e. Di-Octyl Maleate is sulphited by using Sodium Bisulphate in an
aqueous medium
C2H5
CH – COO-CH2 - CH (CH2)3 – CH3
+ NaHSO3
CH – COO-CH2 - CH (CH2)3 – CH3
C2H5
Dioctyl Maleate (340) Sodium Bisulphite (104)
C2H5
CH2 – COO-CH2 - CH (CH2)3 – CH3
NaO3S - CH – COO-CH2 - CH(CH2)3 – CH3
C2H5
D.O.S.S ( 444)
MANUFACTURING OF DEFOAMERS / ANTIFOAMERS
RAW MATERIALS:-
1. S.M.O. – 1160 Kg.
2. O.S.A.A. – 1780 Kg.
3. FUSSAL OIL – 80 Kg.
SMO
OSSA
Fussal Oil
P. P. Tank
Final Product 3000 Kg
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
20
No Effluent
2.8 PROJECT REQUIREMENTS
2.8.1 Raw Materials
This section discusses the major raw materials required for the Project and their approximate
quantities are given in the Table no 2.5
Table 2.5 List of raw material of the products
Sr no Name of Product Raw Material Quantity
1 S.M.S (Sorbitan Mono Stearate)
Yield 1600 Kg
Stearic Acid
Sorbitol
Caustic Soda
1056 Kg
677Kg
5 Kg
2 S.M.P (Sorbitan Mono Plamitate)
Yield 1600 Kg
Palmic Acid
Sorbitol
Caustic Soda
1400 Kg
1000 Kg
5 Kg
3 G.M.S. (Glycerol Mono Stearate)
Yield 1600 Kg
Stearic Acid
Glycerin
Caustic Soda
1270 Kg
411 Kg
3 Kg
4 S.M.O (Sorbitol Mono Oleate)
Yield 2200 Kg
Rice Bran Fatty Acid/Oleic Acid
Sorbitol
Caustic Soda
1450 Kg
935 Kg
4.1Kg
5 Di - Octyl Sulphosuccinate
Yield 1750Kg
(Stage I) 2 EHA
(2 Ethlyl hexa Alchol)
Meleic Anhydride
PTSA (Para Toluene Sulphonic Acid)
(Stage II) ON (Dioctyl Maleate)
Sodium Bi Sulphide
Methanol
955 Kg
360 Kg
14 Kg
800 Kg
260 Kg
400 Lit
6 Defoamers / Antifoamers
Yield 3000 Kg
S.M.O
O.S.A.A
FUSSAL OIL
1160 Kg
1780 Kg
80 Kg
2.8.2 Storage of Raw Materials:
The storage area shall be provided for storing the raw materials required. None of the raw material
mentioned above are considered hazardous as per hazardous Chemicals rule, 1989 under schedule II
except Methanol. Methanol which is been considered as hazardous is used in small quantity i.e 400 lit
and is stored in tanks in isolated storage area.
2.8.2 Water Environment & Pollution Control
Water will be needed for the following applications –
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
21
• Process requirements
• Drinking and sanitation
• House keeping
• Landscaping & gardening
A. Water Requirement & Distribution
The water requirement for the proposed project will be met from the MIDC supply. The daily water
requirement is about 7 m3/day. Details are shown in Table-2.6.
Table 2.6 Water Requirement
Sr. No. Purpose
Total
Requirement
(m3/day)
1 Domestic 1.0
2 Industrial Process 0.5
3 Industrial Cooling Tower 2.0
4 Reactors and Tool washing 1.5
5 Landscaping 2.0
TOTAL 7.0
B. Wastewater Generation
The industrial wastewater generated will be 2 m3/day. Company has proposed for a full-fledged ETP of
capacity 3 KLD for primary treatment of the effluent and is a member of CETP-Butibori for disposal of
primary treated effluent.
The wastewater generated from the project, as estimated, is given below with treatment scheme.
Table 2.7 Wastewater Quantity, Source & Mitigation
Sr.No. Source Total
m3/ day
Losses
m3/day
Effluent
Generation
m3/ day
Mitigation
1 Domestic 1
0.25
(human
consumption)
0.75 To Septic Tanks followed by Soak Pits
2 Industrial
i
Industrial
cooling &
boiler Feed
2 2
(Evaporation) - -
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
22
2.8.3 Power and Fuel Requirement
Total power requirement for Existing project is 50 HP. The required power will be sourced from MSEB
in construction and operation phase. DG set 1 No. of capacity 25 KVA will be used as back up for
emergency. The details of fuel requirement are as given below:
Table 2.8 Power Requirement
Sr. No. Name of Machinery HP
1) Jacklled Reactor Kettles 10
2) Heat Exchangers /Condensers 7
3) Thermic Fluid heater 2 lacs kcal/hr 10
4) Cooling Tower 15
5) Pumps 5
6) Filter 3
7) Weight Scale
8) Lab Equipments
9) Other Misc Machinery
Total 50 HP
Table 2.9 Fuel Requirement
S. No. Type of Fuel Proposed
1 LDO (For Boiler) 90 MT/ Annum
2 Diesel (DG set) 3000 Lit/Annum
ii
Processing
Non-
Biodegradable
(Chemical
Reaction
outlet &
Reactor)
2
(Evaporation) 2
To ETP for primary treatment & sent
to CETP, Butibori
iii
Tree
plantation and
Gardening
2 2 - -
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
23
2.8.4 Man Power
Man power requirement for the construction phase is 20 Nos. and operation phase will be estimated
as 15 Nos. Most of the employees will be recruited from neighboring village after testing their skilled
abilities.
2.8.5 Solid & Hazardous waste Generation
Table 2.10 Solid Waste Generation
Sr.No. Source Anticipated
Quantity
MT/M
Mitigative Measures
Biodegradable
1 Domestic Waste 0.093 Composting
2 Gardening Waste 0.075 Composting
Non Biodegradable
1 Discarded
containers/barrels/liners
1.0 Sold to authorized parties
Hazardous Waste
1 ETP Sludge (after primary
treatment)
0.6 CHWTSDF, Butibori
2.8.6 Landscaping and Greenbelt Development
Adequate land will be available for open spaces and other non-building purposes. 651.42 sq. mt. will
be reserved for green cover / lawn development in the proposed facility. Suitable plant species (40
Nos) of local varieties will be planted with adequate spacing and density for their fast growth and
survival shall be ensured by taking due care.
2.8.7 Fire Fighting System
The proposed Project design and development has been planned with utmost care and all provisions
have been made for the safety and security of the plant and personnel.
For protection of the facility against fire, all the blocks and yards are equipped with any one or a
combination of the following fire fighting systems:
• Hydrant System;
• Fire Detection and Alarm System; and
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
24
• Different types of Fire Extinguishers.
For storage of water for fire fighting in case of emergency, a separate provision of 15000 liter/capacity
reservoir is provided. This will serve the fire fighting needs of the project. Beside this fire extinguishers
will also be installed
In order to provide easy access to the fire tenders to extinguish fire in case of fire accidents, the fire
tender tracks have been provided at the building blocks.
2.8.8 Storm Water-Collection and Disposal
Storm water drains will be provided and Storm water from the entire plot will be collected through
network of storm drains. Most of storm water from plot area will be collected in the rainwater
harvesting pond provided for better utilization of available
2.8.9 Rain Water Harvesting System
Rainwater harvesting will be proposed in the project to conserve the storm water. To prevent the
monsoon rain water going waste through storm drains, rain water shall be collected and reused for
greenery development & allowed to feed into the sub-soil so as to raise the ground water level. This
will enhance the groundwater potential while raising the water tables in the area.
Also, run off from the proposed project site is calculated using rational formula and available area for
rain water collection.
Average annual rain fall = 1100 mm
July is the rainiest month = 30 to 35% (352 mm, Source: Nagpur.nic.in)
No of Rainy days = 50 to 55 days in the year
Average rainfall during the month of July = PP % x days= 564.96 mm (352 mm, Source: Nagpur.nic.
Critical rainfall per day = 564.96 mm =352/31
= 11.3548 mm
Say = 0.01 m/day (Max. – 0.2 m/day)
Table 2.12 Terrace Area Calculation
Sr.No. Description Area
(m2)
* Co-Eff Max. Rain (m/Day) Volume
(m3/Day)
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
25
1 Terrace Area 600 0.90 0.2 108
Maximum quantity of rainwater that can be harvested = 108m3 per day
No. of Recharge pits: 1 (one) 3m x 3m x 3m
It is proposed to collect maximum rain water from open spaces, green belt area, paved surface and
roof top into a reservoir in the operation phase. Harvested water will be utilized for firefighting
purposes in monsoon months and to recharge the ground water.
It is also proposed that the rain water collected from plant area shall be treated for oil & grease prior
to collection.
Figure 2.7 Typical Section of Rain water Harvesting System
AS
PE
R
SIT
E
3.0 M. DIA
1.2
M
D (
EF
FE
CT
IVE
DE
PT
H)
3.5
M.
1200
PLAN
20
00
3.0 M. DIA
200
250
0
1200
SECTION X−X
OIL & GREASE SEPARATOR CHAMBER
DE−SILTING CHAMBER
OIL GREASE SEPARATOR
DE−SILTING CHAMBER
RAIN WATER HARVESTING WELL / FILTRATION CHAMBER RAIN WATER
HARVESTING WELL / FILTRATION CHAMBER
²
200mm DIA BORE HOLE WITH SLOTTED/BLIND PIPE
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
26
3. DESCRIPTION OF THE ENVIRONMENT
3.1 INTRODUCTION
This chapter describes the existing environmental status of the study area with reference to the
prominent environmental attributes. The study area covers the area falling within 10-km radius from
the center of the proposed project area.
The existing environmental setting is considered to adjudge the baseline environmental conditions,
which are described with respect to climate, hydro-geological aspects, atmospheric conditions, water
quality, soil quality, vegetation pattern, ecology, socio-economic profiles of people, land use. The
objective of this section is to define the present environmental status which would help in assessing
the environmental impacts due to the proposed project.
This report incorporates the baseline data generated through primary surveys for three months during
1st October 2011 to 31st December 2011 representing post-monsoon season.
3.2 Methodology
Methodologies followed to prepare this EIA / EMP report is outlined below:
• Conducting reconnaissance surveys for knowing the study area and
• Selecting sampling locations for conducting various environment baseline studies.
• Guidelines issued by the Ministry of Environment and Forests on EIA.
The sampling locations have been selected on the basis of the following:
• Air quality based on predominant wind directions recorded by the IMD.
• Existing topography
• Drainage pattern and location of existing surface water bodies like lakes/ponds, rivers,
sea and streams
• Location of villages/towns/sensitive areas; and
• Areas, which represent baseline conditions
The field observations have been used to:
• Assess the positive and negative impacts due to the proposed site; and
• Suggest appropriate mitigation measures for negating the adverse environmental impacts, if
any; and
• Suggest post-project monitoring requirements and suitable mechanism for it.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
27
3.3 PHYSICAL ENVIRONMENT
3.3.1 Geology and Geomorphology
Geomorphology (Physiography and Drainage)
The northernmost part of the area is occupied by hill range surrounding with an opened
towards southeast. The northern limb of the hill range is covered by Bid Sukli, Dongargaon/ Injoli and
Junapani reserved forests. The area is mainly very gently undulating to almost flat country with a
general slope towards south. A few small hillocks are prominently seen rising above the surrounding
plains. A few isolated conical hills disconnected from the hill range are also seen around Junapani. The
minimum elevation in the area is 220m above. m.s.l.
The drainage of the area is mainly controlled by the Vena River and its tributary nallas. Vena
River Flows roughly southwest along the central- eastern part and takes a westerly course in the South
eastern part of the area The general drainage pattern in the area is dendritic to sub-dentritic with the
general direction of the subsidiary streams towards southeast. Bor main canal along its distributaries
passes through a part of the area.
Geology
The project area and its surrounding areas are occupied by Deccan Trap basaltic flows of
cretaceous to Eocene age. Nineteen flows of basalt are demarcated in the area. Recent deposits like
calcareous sand and conglomerate with calcareous cement, Kankar soil and alluvium occur as thin
veneer and discontinuous patches over the flows. All the flows demarcated in the area are ‘aa’ type.
The flows show well developed fragmentary top and impresting clinkery pockets. The top of the flow
at some places is vesicular. The vesicles are surrounded to irregular and are usually filled with
secondary silica and zeolites. The fragmentary top in general is 0.5 to 3m thick with grayish to ash
colour and with a rough irregular surface.
The middle massive part of the flows is generally hard, compact, dark grey, fine grained and
non to sparsely porphyritic. The massive part at place show well developed columnar –jointing,
polygonal/sheet jointing and generally show spheroidal weathering. The bole representing the top of
a flow are red, green, brown, grayish to black in colour and range in thickness from a few cms to as
much as 2.5-3m. They are gray fine grained clay friable, show typical cubical structure and at places
show spheroidal structure.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
28
The contact between the bole bed and the overlying flow is generally sharp. At places the
intertrappean beds are seen at the contact of the flows. They generally consist of chert, cherty
limestone and clays of varying colours and at places are fossiliferous. Their thickness varies from a few
cm upto 2.5m. Three sets major joints are observed in the flows. The basalts also show columnar
joints, polygonal and curved sheet joints.
Table 0.1 Geological Area Sequence as per GSI
Mineral Aspect
There is no significant mineral deposit in the area. The fresh, unweathered massive parts of
the flows are in general quarried and are mainly used as road metal and construction material. The
clay and silt along river banks and major nalas is used for local brick making.
3.3.1.2 Geomorphology
The various landforms discernible on the satellite imagery can be broadly classified into
i) Structural ,
ii) Denudational and
iii) Fluvial units,
Based on the major geomorphic processes and agents involved in their transformation. These units
differ from one another in respect of lithology, structure and age of their evolution. In all geomorphic
units have been delineated on the basis of visual recognition elements viz., color/tone, texture and
vegetation.
Geomorphologically, the area can be divided into three regions viz., i) Units of structural origin like
structural hills/structural ridges, mesa, butte and dissected plateaus in the northern, western and
southeastern portions which are developed on quartzite and Deccan trap basalts, ii) near plain to
undulating topography with denudational units like pediments, pediplains in the central, eastern and
south-central portion developed over the metamorphites, Gondwana and Deccan Trap basalts, and iii)
Age Formation Lithology
Recent Alluvium Consisting of sand, silt and clays
Cretaceous-Eocene Basaltic lava flows Deccan Trap basaltic lava flows associated
with intertrappeans
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
29
units of fluvial origin viz., the valley hills and the alluvial plains occurring along the rivers of
Wainganga, Kanhan and their tributaries.
3.4 LAND ENVIRONMENT
Studies on land use aspects of eco-system play an important role in identifying sensitive issues and
taking appropriate actions by maintaining ‘Ecological Balance’ for development of the region.
3.4.1 Objectives
The objectives of land use studies are:
• To determine the existing land use pattern in the study area;
• To analyze the impacts of the project development on land use in the study area; and
3.4.2 Methodology
Methodology adopted to study the land-use pattern is outlined below:
• Acquisition of Satellite data
• Preparation of base map from Survey of India toposheets.
• Data analysis using visual interpretation techniques.
• Ground truth studies or field checks.
• Finalization of the map.
• Area calculation for statistics generation.
The land use pattern was also studied by analyzing the available secondary data for year 2010 such as
the District Primary Census Handbook of Nagpur.
Remote Sensing Data Used
The Satellite image given in Fig. 3.1 and the related precision are:
Satellite: IRS P6LISS
Collateral Data:
Survey of Indian Toposheets bearing No – 55K15, 55O4, 55l13 and 55P1 was also used to study the
land use/land cover of study area.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
30
Figure 3.1 Satellite Image of Study Area
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
31
Figure 3.2 Land Use Map of Study Area
3.4.3 Land use in Study Area
Butibori is an industrial suburb of Nagpur, India and is developed as 5 Star Industrial district by
Maharashtra Industrial Development Corporation (MIDC). Butibori's total area acquired is 23.12 square
kilometres out of which 14.94 km² is developed. The area is developed economic development of
Nagpur city. The area receives water supply from Wadgaon Dam. Butibori also claims Maharashtra's first
Food-Park. In order to invite textile industries a common effluent treatment plant is also built.
It is just 14 km from the Municipal limits of Nagpur city. Units like Indo Rama, Acc Nihon, Woolworth,
Fabworth, Whirlpool, Morarjee Mills, KEC, Dinshaws have already commenced operation with other
industry giants waiting in the wings.
Hence, the 10 km area covered from the site is comprises of mix land use pattern i. e. industrial,
commercial & residential. The land use/ land cover details are given in Table 3.1 below and also as
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
32
Figure 3.3 for the study area and the core area.
Table 3.2 Land Use/ Land cover details of study area
S.NO Land Use Area ( sq. m)
1 Settlements 855
2 Industry/Institutional Land 1343
3 Dry Deciduous Forest 320
4 Degraded Scrub Land 295
5 Forest Blank 298
6 Plantation 124
7 Double Crop/Irrigated Land 5217
8 Other Agriculture Land 13136
9 Land with Scrub 5534
10 Land without Scrub 3227
11 Rocky/Stony Barren Land 73
12 Quarry/Mining Land 241
13 Water Body 751
Fig 3.3 Land Use/ Land cover details of study area
Settlements
3%
Industry/Instit
utional Land
4% Dry
Deciduous
Forest
1%
Degraded
Scrub Land
1%
Forest
Blank
1%
Plantation
0%
Double
Crop/Irrigated
Land
17%
Other
Agriculture
Land
41%
Land with
Scrub
18%
Land without
Scrub
11%
Rocky/Stony
Barren Land
0%
Quarry/Mining
Land
1%
Water
Body
2%
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
33
3.5 SOIL CHARACTERISTICS
It is essential to determine the potentiality of soil in the area and to identify the impacts of
urbanization and Industrial on soil quality. Accordingly, the soil quality assessment has been carried
out.
3.5.1 Data Generation
The sampling locations have been identified with the following objectives:
• To determine the baseline soil characteristics of the study area;
• To determine the impact of proposed project on soil characteristics; and
• To determine the impact on soils more importantly from agricultural productivity point of
view.
For studying soil characteristics of the region, soil sampling locations were selected to assess the
existing soil conditions in and around the project area representing various land use types. The
physical & chemical were determined. The samples were collected by ramming a core-cutter into the
soil up to a depth of 90 cm.
Figure 3-4 Soil Sampling locations
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
34
Table 3.3 Locations for Collection of Soil Samples
Station
Code Name of the Station Distance from Project Site (km) Direction from Project Site
S1 Project Site Centre of Site -
S2 Vadgaon Village 5.2 N
S3 Khapri (More)Village 6.1 SW
S4 Mandva Village 4.5 W
S5 Satgaon 3.8 E
S6 Butibori 4.5 E
3.5.2 Physico-chemical Properties of Soil
Table 3.4 Soil Analysis Results
SR.
NO.
PARAMETERES S1 S2 S3 S4 S5 S6 UNIT
1. Bulk density 1.12 1.11 1.02 1.01 1.13 1.07 gram/cm3
2. Organic Matter 1.25 2.26 1.17 1.65 1.98 1.54 %
3. Porosity 20.0 28.0 30.0 27.0 24.0 21.30 % v/v
4. pH (10% Slurry) 7.46 7.37 7.16 5.67 7.22 7.45 -
5. Conductivity 247.4 185.4 421.2 1285.0 165.3 242.9 µS/cm
6. Calcium 0.47 0.52 0.44 0.62 0.60 0.38 mg/g
7. Sulphates 0.37 0.48 0.59 0.41 0.33 0.32 mg/g
8. Chlorides 0.42 0.58 0.65 0.37 0.79 0.51 mg/g
9. Magnesium 0.12 0.31 0.25 0.21 0.29 0.18 mg/g
10. Water Holding Capacity 80.0 72.0 70.0 73.0 76.0 78.0 %
3.6 BIOLOGICAL ENVIRONMENT
The initial Environmental study begins with the Study of biological environment while
considering the need for conservation of environmental quality and biodiversity. The basic factors that
play an important role to maintain an ecosystem show complex inter-relationships between biotic and
abiotic components including dependence, competition and mutualism. Biotic components comprise
of both plant and animal communities which interact not only within and between themselves but
also with the abiotic components viz. Physical and chemical components of the environment. Mostly,
biological communities are the good indicators of climatic and edaphic factors. Studies on biological
aspects of ecosystems are important in Initial Environmental Examination for safety of natural flora
and fauna. Information on the impact of environmental stress on the community structure serves as
an inexpensive and efficient early warning system to check the damage to a particular ecosystem. The
biological environment includes mainly terrestrial ecosystem and aquatic ecosystem.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
35
Biological communities are dependent on the environmental conditions and resources of its
location. It may change if there is any change in the environment. A number of variables like
temperature, humidity, rainfall, soils characteristic, topography, etc., are responsible for maintaining
the homeostasis of the environment. A change in any one of these variables may lead to stress on the
ecosystem. The animal and plant communities exist in their natural habitats in a well-organized
manner. Their natural settings can be disturbed by any externally induced anthropological activities or
by naturally induced calamities or disaster. So, once this setting is disturbed, it becomes practically
impossible or takes a longer time to come to its original state. Plants and animals are more susceptible
to environmental stress. A change in the composition of biotic communities is reflected by a change in
the distribution pattern, density, diversity, frequency, dominance and abundance of natural species of
flora and fauna existing in the ecosystem. These changes over a span of time can be quantified and
related to the existing environmental factors. The specific parameters in the study of biological
environment are biological characteristics through quadrate method. The sensitivity of animal and
plant species to the changes occurring in their existing ecosystem can therefore, be used for
monitoring Preliminary Environmental Examination studies of any project.
3.5.1 Study Area:
The survey included all the villages coming around the 10 Km radius of the project site.
Basically the project site is coming in the Village named Tembhari. The ecological survey was
conducted in villages named Satgaon, Khapri (More), Kharpri (Gandhi), MIDC area in Butibori, Butibori
village, Takalghat, Wakeshwer, Mandva, Salia Dhabha, Vadgaon and Gumgaon. The study area was a
10 km radius around the proposed site. The general topography of the area is gradually undulating to
flat. Most of the area were bare or with very scanty vegetation and agricultural land was present
everywhere except in Satgaon as it is a rehabilitated village. There are three Reserve Forest coming in
the study area. Bid Sukali RF (5-6 km from the project site), Junapani RF (8-9 km From project site) and
Dongargaon RF/ Ingoli RF. Most of the area were bare or with very scanty vegetation. The Reserve
Forests occurring in this area are dry deciduous forest. Most of the Reserved Forests are mostly
invaded by Acacia catechu and open places. The ecological studies were conducted to understand
terrestrial ecosystems around the proposed site.
3.5.2 Terrestrial Ecology
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
36
Thorny or prickly shrubs capable of drought resistance, represents the major composition of
the vegetation. Trees are very few and scattered. The study area best represents as arid or semi-arid
region. Majority of the area represents open agriculture land.
The survey has resulted in documenting 112 plant species. The list of the plants is given in the
Table 3.6. The land use in the area is agriculture with crop like Wheat (Triticum aestivum), Cotton
(Gossypium hirsutm). The farms are interspersed with human habitation, i.e. villages. The vegetation
in the surrounding was natural.
Table No. 3.6 List of Common Flora Present in Study Area
Sr. No. Botanical (Latin) Name Local Name Family
Trees
1. Annona squamosa Sitaphal Annonaceae
2. Annona reticulate Ramphal Annonaceae
3. Aegle marmelos Bel Rutaceae
4. Adina cordifolia Haldu Rubiaceae
5. Azardirachta indica Neem Meliaceae
6. Acacia catechu Khair Mimosaceae
7. Acacia Arabica Babul Mimosaceae
8. Acacia nilotica Babhli Mimosaceae
9. Albizzia lebbek Siras Mimosaceae
10. Bauhinia racemosa Apta Caesalpiniaceae
11. Butea frondosa Palas Fabaceae
12. Bomax ceiba Kaetsawar Bombacaceae
13. Buchanania latifolia Achar Anacardiaceae
14. Caesalpinia pulcherima Gulmohor Caesalpiniaceae
15. Citrus aurantium Santra Rutaceae
16. Citrus aurantifolia Limbu Rutaceae
17. Cassia fistula Bhawa Caesalpiniaceae
18. Cassia siamea Kashid Caesalpiniaceae
19. Casuarina equisitifolia Suru Casuarinaceae
20. Carica papaya Papita Caricaceae
21. Dalbergia latifolia Shisham Fabaceae
22. Dalbergia sissoo Sisao Fabaceae
23. Delonix regia Gulmohor Caesalpiniaceae
24. Emblica officinalis Amla Euphorbiaceae
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
37
Sr. No. Botanical (Latin) Name Local Name Family
25. Euphorbia nerifolia - Euphorbiaceae
26. Eucalyptus sp. Nilgiri Myrtaceae
27. Ficus benghalensis Wad Moraceae
28. Ficus religiosa Pimpal Moraceae
29. Ficus glomerata Umbar Moraceae
30. Ixora arborea Lokhandi Rubiaceae
31. Limonia acidissima Kavath Rutaceae
32. Lagerstroemia parviflora Lendia Lythraceae
33. Leuceana leucocephala Subabhul Mimosaceae
34. Mimosops elengi Bakul Sapotaceae
Sr. No. Botanical (Latin) Name Local Name Family
35. Musa paradiscia Kel Musaceae
36. Madhuca indica Mohawa Sapotaceae
37. Murraya koenigii Kadineem Rutaceae
38. Moringa olerifera Shewaga Moringaceae
39. Nyctanthes arborthestis Parijatak Nyctanthaceae
40. Ougenia dalbergiodes Tiwas Fabaceae
41. Polyalthia longifolia Ashok Annonaceae
42. Ponghamia glabra Karanj Fabaceae
43. Pithocelobium dulce Vilayati chinch Mimosaceae
44. Psiduium guajava Peru Myrtaceae
45. Syzygium cumini Jamun Myrtaceae
46. Tamarindus indica Chinch Caesalpiniaceae
47. Tctona grandis Sagwan Verbenaceae
48. Terminalia arjuna Arjun Combretaceae
49. Terminalia tomentosa Ain Combretaceae
50. Zizyphus jujube Ber Rhamnaceae
Shrub
51. Adhatoda vasica Adulasa Acanthaceae
52. Barleria prionitis Katekoranti Acanthaceae
53. Calatropis procera Rui Asclepediaceae
54. Carisa carando Karvanda Apocynaceae
55. Canna indica Kardali Cannacecae
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
38
Sr. No. Botanical (Latin) Name Local Name Family
56. Datura metel Dhotra Solanaceae
57. Gardenia resinfera Dikamali Rubiaceae
58. Hibiscus cannabinus Ambadi Malvaceae
59. Impomoea fistulosa Beshram Convolvulaceae
60. Indigofera tinctoria Nil Fabaceae
61. Lantana camera Ghaneri Verbenaceae
62. Nerium indicum Kanmher Apocynaceae
63. Opuntia elator Nagphani Cactaceae
64. Ricinus communis Erandi Euphorbiaceae
65. Tabernaemontana divaricata Swastic Apocynaceae
66. Vitex negundo Nirgudi Verbenaceae
67. Wrightia tinctoria Kalakuda Apocynaceae
Herbs
68. Amaranthus tricolor Chaulai Amaranthaceace
69. Achyranthes aspara Aghada Amaranthaceace
Sr. No. Botanical (Latin) Name Local Name Family
70. Alteranthera sessilis Galighosh Amaranthacecace
71. Argemone mexicana Pivla dhotra Papaveraceae
72. Ageratum conzoides Osadi Asteraceae
73. Aloe vera Korphad Liliaceae
74. Bauchania lanzan Charoli Anacardiaceae
75. Cleome viscose Pivli tilwan Cleomacceae
76. Celosia esculanta Kombda Amaranthaceace
77. Chenopodium album chalewit Chenopodiacae
78. Hyptis suaveloins Rantulsi Lamiaceae
79. Leucas aspara Kumbha Lamiaceae
80. Mimosa pudia Lajalu Mimosaceae
81. Malachra capitata - Malvaceae
82. Oscimum sanctum Tulsi Lamiaceae
83. Parthenium hystrophorus Gajargawat Asteraeae
84. Polygonum globrum - Polygonaceae
85. Sida rhombifolia Chikana Malvaceae
86. Solanum xanthocarpum - Solanaceae
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
39
Sr. No. Botanical (Latin) Name Local Name Family
87. Sonchus asper Mhatari Asteraceae
88. Tephrosia hamittnil Diwali Fabaceae
89. Tridax procumbens Kamarmodi Asteraceae
90. Tagates patula Zendu Asteraceae
91. Tribulus terrestris Gokru Zygophyllaceae
Climbers
92. Asparagus racemisus Shatawari Liliaceae
93. Basella rubra Velbondi Basellaceae
94. Bougainvelea glabra Bogasnwel Nyctaginaceae
95. Coccinea indica Tondle Cuccurbitaceae
96. Cuccurbita maxima Kohla Cuccurbitaceae
97. Cuccurbita pepo Kashi kohala Cuccurbitaceae
98. Clitorea turnacea Gokarni Fabaceae
99. Dalichos lablab Wal Fabaceae
100. Momordica charantia Karela Cuccurbitaceae
101. Tinospora cordifolia Gulvel Menispermaceae
Parasite
102. Cuscuta reflexa Amarwel Cuscutacecae
103. Vanda tessellate Vanda Orchidaceae
104. Cassia tora Tarota Caesalpiniaceae
Sr. No. Botanical (Latin) Name Local Name Family
Bamboos
105. Dendrocalamus strictus Bamboo Poaceae
106. Bambusa arundinaceae Katang bamboo Poaceae
Grasses
107. Cymbopogon martini Tikhadi Poaceae
108. Cynodon dactylon Durva Poaceae
109. Vertiveria zizaniodes Khas Poaceae
110. Heteropogon contortus Kusari Poaceae
111. Sehima salcatum Paonia Poaceae
112. Sehima nervosum Sheda Poaceae
Source: 1. Working plan for Nagpur Forest Division, for the year 1990—91 to 1999-2000
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
40
2. Flora of Nagpur Division (By Dr. N.R. Ugemuge).
3.5.3 Description of the flora / vegetation within 10 km radius:
1. Agricultural crops:
The main land use around 10 Km radius of the proposed site was agriculture, mainly cultivated
with crops like Wheat (Triticum aetivum), Soyabean (Glycin max), Sugarcane (Saccharum officinarum),
Red gram (Cajanus cajan) and Groundnut (Arachis hypogea) as cash crops. The crops cultivated in this
area are listed in Table 3.7. The other crops taken were Bajara (Pennisettum sp.), Sunflower
(Helianthus annuus) and Jawai (Sorghum vulgare). The leafy vegetable crops were Cabbage (Brassica
oleracea var capitata), Spinach (Spinacia oleracea), Coriander (Coriandrum sativum) and Amaranthus
sp. Occasionally the farmer were cultivating the fruit vegetables like Tomato (Lycopersicon esculenta),
Brinjal (Solanum melongea) and Capsicum (Capsicum annum).
The important fruit plants were Mangifera indica (Mango), Carica papaya (Papita), Psidium
guyava and Syzigium cumini (Jamun). Occasionally, Achras sapota (Chiku) was found grown nearby the
houses. The farms were interspersed with human habitation, villages and townships.
The agricultural land also shows some sparse vegetation. The vegetation sampling was,
therefore, carried out in Agricultural land and scrublands.
Table 3.7 Common crops of the area
Common Name Botanical Name Habit Family
Guava Psidium guava Shrub Myrtaceae
Bajra Pennisetum typhoideum Rich. Grass Poaceae
Bitter guard Momordica charantia L. Climber Cucurbitaceae
Brinjal Solanum melongena Linn. Herb Solanaceae
Capsicum Capsicum annuum L. Herb Solanaceae
Coriander Coriandrum sativum Linn. Herb Apiaceae
Groundnut Arachis hypogaea L. Herb Fabaceae
Jawar Sorghum vulgare Pers. Grass Poaceae
Maize Zea maysI L. Grass Poaceae
Mango Mangifera indica Tree Anacardiaceae
Papita Carica papaya Linn. Shrub Caricaceae
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
41
Pumpkin Cucurbita maxima Duch. Climber Cucurbitaceae
Red Gram Cajanus cajan (L.) Millsp. Herb Fabaceae
Tomato Lycopersicum esculentum Mill. Herb Solanaceae
Wheat Triticum aestivum Linn. Grass Poaceae
2. Commercial crops:
Wheat (Triticum aestivum), Cotton (Gossypium hirsutum), Rice (Oryza sativa), and Groundnut (Arachis
hypogea) were cultivated as commercial crops.
3. Endangered species:
There are no ecologically sensitive areas like national parks or wildlife sanctuaries, Tiger Reserves,
Elephant Reserves, Biosphere Reserve within the 5 km radius of proposed site. Though the area shows
good diversity of flora, there were no reports of any species falling in endangered category as per the
IUCN and BSI record.
4. Endemic Species:
The endemic species are those, which have restricted distribution to particular geographical area. This
area was rich floristically, however, it do not show any local endemic species. No species of plants
which are endemic to India were reported from this area.
5. Medicinal Plant in Study area
The local communities directly influence the terrestrial ecosystems in the form of their access to
fulfill the needs of collection of medicinal plants, as well as other economically important plants such
as Madhuca indica (Mahua), Phyllanthus emblica (Awla), Syzygium cumini (Jamun), Diospyrus
melanoxylon (Tendu). Most important medicinal plants from the study area are Achyranthes aspera,
Solanum xanthocarpum, Tribulus terrestris, Abutilon indicum, Argemone mexicana, Adhatoda vasica,
Calotropis procera, Datura, Asparagus racemosus, Vitex negundo, Aegle marmelos, Azadirachta
indica, Butea monosperma, Cassia fistula, etc.
Table.3.8 Medicinal Plant in Study area
Sr.No. Botanical Names Common Names
1 Madhuka indica Mahua
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
42
2 Phyllanthus emblica Awla
3 Syzygium cumini Jamun
4 Diospyrus melanoxylon Tendu
5 Azadiracta indica Kadu limb
6 Ocimum sanctum Tulsi
7 Ficus bengalensis Wad
8 Mangifera indica Amba
9 Acacia catechu Kattha
10 Jujupus jujuba Bor
11 Vitex nigundo Kambermodi
3.5.4 Description of fauna (non-domesticated):
Faunal studies help to understand the well being of a nature and functioning of ecosystems. It
helps to monitor biological richness or heritage quality, habitat change and quantifying threatening
species. The Faunal components such as Arthropods, Pisces, Birds and Mammals are very sensitive to
the change in the ecosystem, therefore are best used as indicators of the ecosystem function and
considered crucial in the ecology and management of the Aquatic and Terrestrial Ecosystems.
Animals and birds in the study area were documented using following means:
• Secondary sources and published literature
• By interviewing local people
• Actual sighting
• Indirect evidence (pallets, dung, droppings, scat, mould, marking on the stems etc.)
• Nesting (birds, burrows for small mammals)
The records for the birds, mammals and other faunal groups were made at the same site where
vegetation sampling was carried out. Most of the records of the mammalian and reptilian fauna are
opportunistic, nonetheless very useful to understand habitat specificity and interrelationship between
certain floral and faunal elements and also between certain geological and faunal features.
3.5.4.1 Avifauna
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
43
Birds are important to human welfare in various ways including seed dispersal agents. Despite
the human activities, the study sites have fairly good avifaunal diversity. The field survey resulted in
documentation of many bird species, which are listed in the Table 3.9 b.
A total of 28 birds species were observed in the study area at 9 sampling locations Table 3.9
a . A species list was prepared by walking through the areas, listing taxonomic position of each species
encountered, recording relative abundance and absolute number in study area. Birds like Painted
sand grouse (Pterocles indicus), Common sand grouse (Pterocles exustus), Painted partridges
(Francolinus pictus) , Crane (Grus antigone), Cattle egrets ( Bubulcus ibis)and Spotted bill duck (Anas
poecilorhyncha) were seen near the water bodies.
Table 3.9A Sampling location for Birds survey
Location No.
Location Name Distance from the project site
Direction from the project site
Identification code for sampling Location
1 Project Site
(Tembhari)
- PS
2 Vadgaon Village 5.2 N Va
3 Khapri (More)
Village
6.1 SW KhM
4 Khapri (Gandhi) 8.0 SW KhG
5 Mandva Village 4.5 W Ma
6 Satgaon Village 3.8 E Sa
7 Butibori Village 4.5 E Bu
8 Salai Dabha 1.6 N SD
9 Wakeswer 9.7 NE Wa
Table 3.9B Common Birds in study area
Sr.
No
Local or
common
Name
Zoological Name Identification code sampling
Location
1. House Crow Corvus splendens PS,Va, KhM, KhG,Ma, Sa, Bu,
SD,Wa
2. Owl Sivix spp. Va, Wa
3. Common Turdoides PS,Va, KhM, KhG,Ma, Sa, Bu,
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
44
Babbler SD,Wa
4. Jungle Babbler Turdoides striatus PS,Va, KhM, KhG,Ma, Sa,
5. Pigeon Treron phoenicaptera PS,Va, KhM, KhG,Ma, Sa, Bu,
SD,Wa
6. Red Vented
Bulbul
Pycnonotus cafer PS, Va, KhM, KhG,Ma
7. Crane Grus antigone Wa, Va
8. Black Drongo Dicrurus macrocerus
cathoecus
KhM, KhG, PS, Wa, Va
9. Greater
coucal
Centropus sinensis Va, KhM, KhG,Ma
10. Asian Koel Eudynames scolopaceae PS, Va, KhM, KhG,Ma
11. Grey Headed
Myna
Acridotheres tristi Sa, Va, Wa,
12. Bank Myna Acridotheres ginginianus Va, Wa
13. House
Sparrow
Passer domesticus indicus PS,Va, KhM, KhG,Ma, Sa, Bu, SD,Wa
14. Tree Sparrow Passer monlanus PS,Va, KhM, KhG,Ma, Bu, SD,Wa
15. Indian Tree
Pipit
Anthrus roseatus KhG, Ma, Wa
16. Common
Kingfisher
Alcedo atthis bengalensis Wa, Va
17. Indian Cuckoo Cuculus micropterus Ma, Sa, SD
18. Indian Koel Eudynamys scolopacea Wa Ma, Sa, SD
19. Rose Ringed
Parakeet
Psittacula krameri Va, Wa, KhG, Ma
20. Dove Streptopelica spp. PS,Va, KhM, KhG,Ma, Sa, Bu, SD,Wa
21. Common Pea
Fowl
Pavo cristatus Wa, Va
22. Grey jungle
fowl
Gallus sonnerafil Wa, Va
23. Grey Partridge Francolinus pondicerianue Wa, Va
24. Vulture Otogypa calvus Wa, Va
25. Common sand
grouse
Pterocles exustus Wa
26. Painted sand Pterocles indicus Wa
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
45
Source: Referred to Working Plan for Nagpur Forest Division for the year 1990—91 to 1999-
2000
3.5.4.2 Mammals:
The study area was a place of poor mammalian diversity. Wild boars were of common
occurrence in this area. The area represent good habitat for this animal. At places, the damage
caused by them to agriculture and plantations make them vulnerable to control. Few species of
mammals have been recorded during visit from the study area. The mammalian species recorded are
listed in the following Table 3.10 along with their schedule in which they are placed according to the
Wildlife Act 1972.
Table 3.10: Mammals occurring in the study area
Common Name Scientific Name Schedule Category
Jungle cat Felis chous II
Striped squirrel Funambulus spp. IV
Indian Grey Mongoose Herpestes edwardii II
Common hare Lepus nigricollis IV
Rhesus macaque Macaca mulata II
Bonnet monkey Macaca radiata II
Field Mouse Mus booduga V
House mouse Mus musculus V
Common languor Presbytis entellus II
House rat Rattus rattus V
Bat Rousettus spp. V
House Shrew Suncus murinus V
Source : Working Plan for Nagpur Forest Division for the year 1990—91 to 1999-2000
3.5.4.3 Reptiles
While survey of 10 Km Study area some Reptiles were also seen given in the Table 3.11
grouse
27. Spotted bill
duck
Anas poecilorhyncha Wa
28. Cattle egret Bubulcus ibis Wa, Va, KhG, KhM
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
46
Table 3.11: Reptiles occurring in the study area
Sr. No. Local Name Zoological Name
Lizards
1 Common garden lizard Calotes versicolar
2 Common Indian Monitor lizard Veranus benalensis
Snakes
1 Indian python Python molurus
2 Buff striped keelback Natrix stolate stolate
3 Common green whip snake Dryophis nasutus
4 Russsell’s viper Vipera russelli
5 Common green pit viper Trimeresurus gramineus
Source : Working Plan for Nagpur Forest Division for the year 1990—91 to 1999-2000
3.5.4.4 Fishes
The study area consists of Wadgoan Dam which is about 9.5 Km from the project area.
Therefore the impact on the fishes need not be much. The total fish production in the year 2010-11
was 7.31 MT whereas in this year the total fish production has increased to 15.51 MT. The List of
fishes occurring in the dam are given in the Table 3.12
Table 3.12: Fishes occurring in the study area
Sr. No. Local Name Zoological Name
Major Carps
1 Catala Catla catla
2 Rohu Labeo Rohita
3 Mrigala Cirrhinus mrigala
4 Silver Carp Hypophthalmichthys molitrix
5 Grass Carp Ctenopharyngodon idella
6 Common Carp/
Cyprinus Carp
Cyprinus carpio
Local Major Fishes
7 Wallago Wallago attu
8 Eel fish Eel
9 Magur Clarius batracus
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
47
10 Great snakehead Channa marulius
11 Spotted snake
head, green snake
head
Channa punctatus
12 Tilapia Tilapia sp.
Local Minor Fish
13 Local Prawn Idella idella
14 Local Prawn Pineos indicus
15 Harlequin Rasbora /
Rasbora fish
Trigonostigma heteromorpha
16 Clown knife fish Notopterus chitala
Source : Government Department of Fishers (Assistant Commissioner of Fisheries Zero-mile Stone,
Civil lines near BSNL office Nagpur-440001)
3.5.4.5. Amphibians
There were two species of Amphibians seen within the study area they are Indian Bull Frog
(Rana trigrina) and Common Indian Toad (Bufo melanostictus).
3.5.4.6 Prediction of Impacts
There were no ecologically sensitive areas like national parks or wildlife sanctuaries, Tiger
Reserves within the study area.
The impacts due to proposed Chemical Industry Manufacturing Unit at ButiBori in this region
will not cause any adverse impacts on flora and fauna as the vegetation identified in the study area is
in the form of dense vegetation cover of grass, herb, shrub and trees. For fauna in the study area, the
insects, animals, birds and reptiles are encountered. The flora and fauna is evenly distributed in the
study area. The density, diversity, frequency and abundance of all species of flora (as herb, shrub, and
trees) and fauna falling in the study area are low. Further there is no exotic, endangered threatened
and rare species enlisted on observable and identified species of flora in this region.
3.6 AIR ENVIRONMENT
3.6.1 Meteorology
The meteorological data recorded during the monitoring period is very useful for proper
interpretation of the baseline information as well as an input for prediction models for air quality
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
48
dispersion. Historical data on meteorological parameters also plays an important role in identifying
the general meteorological regime of the region.
The year may broadly be divided into four seasons:
Winter season : December to February
Pre-monsoon season : March to May
Monsoon season : June to September
Post-monsoon season : October to November
3.6.2 Methodology
The methodology adopted for monitoring surface observations was as per the standard norms laid
down by Bureau of Indian Standards (IS: 8829) and India Meteorological Department (IMD). On-site
monitoring was undertaken for various meteorological variables in order to generate the site-specific
data. The generated data was then compared with the meteorological data generated by IMD.
3.6.3 Methodology of Data Generation
The automatic meteorological instrument was installed at the project site to record wind speed,
direction, relative humidity and temperature. Cloud cover was recorded by visual observation. Rainfall
was monitored by rain gauge.
Hourly average, maximum, and minimum values of wind speed, direction, relative humidity, rainfall,
and temperature were recorded continuously.
3.6.3.1 Sources of Information
Secondary information on meteorological conditions has been collected from Meteorological
Department of India for year 2010. Temperature, relative humidity, rainfall, wind speed and direction
are noted down twice a day viz., at 0830 and 1730 hr from the source. The wind speed and direction
data of IMD station has also been obtained for the past available 10 years. Data on Cloud cover is
compiled from the climatologically tables for the IMD station.
3.6.3.2 Presentation & Analysis of Secondary Data
3.6.3.2.1 Climate
Nagpur's farness from the sea is responsible for its dry and mildly humid climatic conditions that
remain for most part of the year. It experiences primarily three main seasons-summers, winters and
monsoon with fluctuations in temperature.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
49
Summers arrive usually during March and lasts till June characterized by dryness and high
temperature shooting up to 43 degree C in the month of May.
The South-westerly monsoons set in June and the city gets heavy rainfall till September.
The annual average daily maximum temperature in year 2010 was 43°C whereas annual average daily
minimum temperature is 13°C. Average Relative Humidity recorded in year 2010 in the month of August
was 80 % & Relative humidity was recorded as 24 in the month of April. The Rainfall was the highest in
the month of July & August, 352 and 278 mm respectively.
3.6.3.2.2 Analysis of Meteorological Data Recorded at Site
Temperature, Relative Humidity & Monthly Rainfall given in the Table 3.12
Table 3.12 Summary of the Meteorological Data for Year 2010
Month Temperature (o
C) Relative
Humidity (%)
Monthly
Rainfall (in
MM)
(mm)
Max Min Average
January 29 13 54 16
February 32 16 43 2
March 36 20 30 25
April 40 23 24 20
May 43 28 27 10
June 37 26 55 174
July 32 24 77 352
August 31 24 80 278
September 32 23 74 186
October 33 20 61 61
November 31 16 55 9
December 29 13 56 2
3.6.3.2.3 Wind Speed/Direction
Wind speed and direction recorded at 0830 and 1730 hr has been analyzed using Wind rose PRO for
16 wind directions viz., N, NNE, NE, ENE, E, ESE, SE, SSE, S, SSW, SW, WSW, W, WNW, NW, NNW and is
presented. Wind direction and speed are presented in Figure-3.6
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
50
Figure 3.5 Wind Rose Diagram at Site
Based on the wind rose diagram, Predominant wind direction is Northeast.
Table 3.13 Wind Direction table
Sr.No. Predominant Wind
Direction
Wind Speed Frequency
0-3 3-5 5-8 8-12
1 North 1 3 3 4
2 North–North east 3 6 2 2
3 North east 0 2 3 1
4 East North East 0 3 4 4
5 North northwest 3 2 2 2
6 East 0 2 2 3
3.6.4 Air Quality
The ambient air quality with respect to the study zone of 10-km radius around the project site forms the
baseline information. The various sources of air pollution in the region are industries, commercial, and
vehicular traffic. The prime objective of the baseline air quality study was to assess the existing air
quality of the area. This section describes the selection of sampling locations, methodology adopted for
sampling, analytical techniques and frequency of sampling. Monitoring for baseline parameters was
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
51
carried out for year 2010.
3.6.4.1 Methodology adopted for Air Quality Survey
Selection of Sampling Locations
The baseline status of the ambient air quality has been assessed through a scientifically designed
ambient air quality-monitoring network. The design of monitoring network in the air quality surveillance
program has been based on the following considerations:
• Meteorological conditions on synoptic scale
• Topography of the study area;
• Representatives of regional background air quality for obtaining baseline status; and
• Representatives of likely impact areas.
Ambient Air Quality Monitoring (AAQM) stations were set up at Six locations with due consideration to
the above mentioned points.
Table-3.14 gives the details of environmental setting around each monitoring station. The location of
the selected stations with reference to the project site is given in the same table and shown in Figure-3.7
& 3.8.
3.6.4.2 Frequency and Parameters for Sampling
Ambient air quality monitoring has been carried out with a frequency of two days per week at all
locations for study period from October 2010 to December 2010. The baseline data of air environment is
generated for the following parameters:
• Respirable Particulate Matter (RPM);
• Sulphur dioxide (SO2);
• Oxides of Nitrogen (NOx);
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
52
Figure 3-6 Air Sampling Location
Table 3.15 Details of Ambient Air Quality Monitoring Locations
Station
Code
Name of the
Station
Wind Direction Distance from Project
Site (km)
Direction from
Project Site
A1 Project Site -- Centre of Site -
A2 Vadgaon Village Upwind 5.2 N
A3 Khapri (More)
Village
Downwind 6.1 SW
A4 Mandva Village Upwind 4.5 W
A5 Satgaon Village Upwind 3.8 E
A6 Butibori Village Downwind 4.5 E
3.6.4.3 Duration of Sampling
The sampling duration for RPM, SO2, and NOx was one twenty four hourly continuous sample twice in
week. This was to allow a comparison with the present revised standards mentioned in the latest
National Ambient Air Quality Standards Notification of the Central Pollution Control Board (CPCB)
(November 18th, 2009).
3.6.4.4 Method of Analysis
The air samples were analyzed as per standard methods specified by Central Pollution Control Board
(CPCB), IS: 5184 and American Public Health Association (APHA).
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
53
3.6.4.5 Selection of Instruments for Air Quality Sampling
Respirable Dust Samplers have been used for monitoring Respirable fraction (<10 microns) and gaseous
pollutants like SO2 and NOx.
3.6.4.6 Sampling and Analytical Techniques
3.6.4.6.1 Total Suspended Particulate Matter (TSPM), CO, SO2 and NOx
RPM present in ambient air is sucked through the cyclone. Coarse and non-respirable dust is separated
from the air stream by centrifugal forces acting on the solid particles. These separated particulates falls
through the cyclone's conical hopper and collect in the sampling cap placed at the bottom. The fine dust
(<10 microns) forming the respirable fraction of the TSPM passes the cyclone and is retained by the filter
paper. A tapping is provided on the suction side of the blower to provide suction for sampling air
through a set of impingers. Samples of gases are drawn at a flow rate of 0.2 liters per minute (lpm).
Observations on Primary Data
Table 3.15 Summary of Ambient Air Quality Results
Location PM-10 (μg/m
3) PM-2.5 (μg/m
3) SO2 (μg/m
3) NOx (μg/m
3)
CO
(mg/m3)
Max. Min. Avg. Max. Min. Avg. Max. Min. Avg. Max. Min. Avg. Max. Min. Avg.
A1 37.12 31.20 34.16 14.28 11.22 12.75 17.72 15.56 16.64 9.35 8.86 9.10 0.22 0.19 0.20
A2 38.55 36.23 37.39 16.78 14.31 15.54 15.11 14.34 14.72 11.76 9.22 10.49 0.49 0.40 0.44
A3 35.34 31.32 33.33 17.23 13.45 15.34 14.43 12.29 13.36 12.54 10.33 11.43 0.67 0.55 0.61
A4 29.11 28.02 28.56 19.34 15.44 17.39 15.23 13.38 14.30 9.76 7.78 8.77 0.78 0.68 0.73
A5 26.96 24.98 25.97 13.11 11.42 12.26 15.76 13.34 14.55 11.70 9.98 10.84 0.56 0.45 0.50
A6 34.78 32.65 33.71 16.78 13.46 15.12 17.22 14.84 16.03 10.65 8.98 9.81 0.74 0.65 0.69
3.7 NOISE LEVEL SURVEY
The physical description of sound concerns its loudness as a function of frequency. Noise in general is
sound which is composed of many frequency components of various loudness distributed over the
audible frequency range. Various noise scales have been introduced to describe, in a single number, the
response of an average human to a complex sound made up of various frequencies at different loudness
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
54
levels. The most common and universally accepted scale is the A weighted Scale which is measured as dB
(A). This is more suitable for audible range of 20 to 20,000 Hz. The scale has been designed to weigh
various components of noise according to the response of a human ear.
The impact of noise sources on surrounding community depends on:
• Characteristics of noise sources (instantaneous, intermittent or continuous in nature). It can be
observed that steady noise is not as annoying as one which is continuously varying in loudness;
• The time of day at which noise occurs, for example high noise levels at night in residential areas
are not acceptable because of sleep disturbance; and
• The location of the noise source, with respect to noise sensitive land use, which determines the
loudness and period of exposure.
The environmental impact of noise can have several effects varying from Noise Induced Hearing Loss
(NIHL) to annoyance depending on loudness of noise. The environmental impact assessment of noise
due to construction activity, and vehicular traffic can be undertaken by taking into consideration various
factors like potential damage to hearing, physiological responses, and annoyance and general
community responses. Noise monitoring has been undertaken for 24-hr duration at each location.
3.7.1 Identification of Sampling Locations
A preliminary reconnaissance survey has been undertaken to identify the major noise generating sources
in the area. Noise at different noise generating sources has been identified based on the activities in the
village area, ambient noise due to industries and traffic and the noise at sensitive areas like hospitals and
schools. The noise monitoring has been conducted for determination of noise levels at five locations in
the study area.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
55
Figure 3.6 Noise monitoring locations
The environment setting of each noise monitoring location is given in Table-3.13.
Table 0.19 Details of Noise Monitoring Locations
Location
Code
Location
Distance from
Project Site (km)
Direction from Project
Site
N1 Project Site Centre of Site -
N2 Vadgaon Village 5.2 N
N3 Khapri Village 6.1 SW
N4 Mandva Village 4.5 W
N5 Satgaon Village 3.8 E
N6 Butibori Village 4.5 E
3.7.2 Method of Monitoring
Sound Pressure Level (SPL) measurements were measured at all locations; one reading for every hour
was taken for 24 hours. The day noise levels have been monitored during 6 am to 10 pm and night levels
during 10 pm to 6 am at all the locations covered in 10-km radius of the study area.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
56
Table 3.20 Results of Noise Sampling
Day time: 06.00 am – 10.00 pm, Night time: 10.00 pm – 06.00 am
3.8 WATER QUALITY
Selected water quality parameters of water resources within 10-km radius of the study area were
studied for assessing the water environment and assess anticipated impact of the proposed project.
The purpose of this study was to:
• Assess the water quality characteristics for critical parameters;
• Evaluate the impacts on agricultural productivity, habitat conditions, recreational resources and
aesthetics in the vicinity; and
• Prediction of impact on water quality by this project and related activities.
The information required has been collected through primary surveys and secondary sources.
3.8.1 Methodology
Reconnaissance survey was undertaken and monitoring locations were finalized based on:
� Drainage pattern;
� Location of residential areas representing different activities/likely impact areas; and
� Likely areas, which can represent baseline conditions.
Surface Water & Ground water source covering 10-km radial distance was examined for physico-
chemical, parameters in order to assess the effect of industrial and other activities on water. The
samples were collected and analyzed as per the procedures specified in 'Standard Methods for the
Examination of Water and wastewater' published by American Public Health Association (APHA).
3.8.2 Water Sampling Locations
Water samples were collected from ground water sampling locations. These samples were taken as grab
samples and were analyzed for various parameters.
3.8.2.1 Surface Water Sampling:
The surface water sampling locations are listed below in Table-3.21 and shown in Figure-3.9.
Sr. No. Name Of Location dB (A)
Leq.
Day
Time
Night
Time
1. Project Site 50.5 48
2. Mandwa 51.3 42
3. Satgaon 53.8 45
4. Vadgaon 48.6 40
5. Butibori 57.1 48
6. Khapri (More) 56.2 41
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
57
Figure 3.7 Surface Water Sampling Location
Table 3.21. Surface Water Quality Monitoring Locations, Distance & Direction from the Proposed
Site
Station Code Name of the Station Distance from Project
Site (km)
Direction from
Project Site
SW1 Wakeshwer Lake 9.7 NE
SW2 Lakhmapur Lake 9.4 NW
SW3 Wadgaon Dam Reservoir 9.5 SE
Table 3.22 Surface Water Quality Analysis Results
Sr. No. PARAMETERS UNIT SW1 SW2 SW3 IS: 2296 Class ‘C’
1. pH - 7.23 7.20 7.41 6.8 to 8.5
2. EC at 25 0 C µS/cm 349.1 330.1 399.2 -
3. Turbidity NTU 0.9 1.0 1.0 -
4. DO mg/l 4.5 4.2 4.2 >4.0
5. TDS mg/l 165.81 164.21 198.24 1500.0
6. Total Hardness as CaCO3 mg/l 165.38 155.40 178.63 -
7. Calcium mg/l 28.43 35.03 31.03 -
8. Magnesium mg/l 26.83 32.28 24.68 -
9. Total Alkalinity mg/l 152.0 170.0 150.0 -
10. Chloride ( as Cl ) mg/l 68.98 81.02 72.32 -
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
58
11. Sulphate mg/l 10.22 8.76 11.34 -
12. Nitrate mg/l 0.78 0.63 0.81 50.0
13. Fluoride mg/l BDL BDL BDL 1.5
14. Lead mg/l BDL BDL BDL 0.1
15. Cr 6+ mg/l BDL BDL BDL 0.05
16. COD mg/l 10.12 7.85 11.22 -
17. BOD mg/l 4.0 3.0 6.0 -
18. Sodium mg/l 4.56 2.45 5.41 -
19. Potassium mg/l 1.40 0.74 2.10 -
20. Fe mg/l 0.011 0.012 0.014 50.0
21. Total Coliform (MPN/100
ml)
4.0 7.0 1.0 5000.0
3.8.2.2 Ground Water Sampling:
Ground Water Quality was analyzed for samples for given locations shown in table 3.23:
Figure 3.8 Ground Water Sampling Locations
Table 3.23 Ground Water Quality Monitoring Locations,
Distance and Direction from the Site
Station
Code Name of the Station
Distance from Centre of
Proposed Site (km)
Direction from
Proposed Site
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
59
GW1 Butibori Village 4.5 NE
GW2 Khapri (More) Village 6.1 SW
GW3 Vadgaon Village 5.2 N
GW4 Mandva Village 4.5 W
GW5 Satgaon village 3.8 E
Ground Water Quality (GW1, GW2 , GW3, GW4 & GW5):
Ground Water Quality was analyzed and the results are given in table 3.16
Table 3.24 Ground Water Analysis Results
Sr.
No. PARAMETERS UNIT GW1 GW2 GW3 GW4 GW5
IS: 10500
Norms
1. pH - 7.76 7.83 7.70 7.48 7.63 6.8-8.5
2. Colour Hazen <5 <5 <5 <5 <5 < 5
3. Odour - Un Un Un Un Un Un
4. Conductivity µS/cm 739.1 952.0 1515.0 807.0 1565.0 -
5. Taste - Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable
6. Total Hardness as
CaCO3
mg/l 330.0 360.0 640.0 720.0 310.0 300
7. TDS mg/l 388.7 510.7 800.8 431.1 821.4 500
8. Chloride ( as Cl ) mg/l 42.04 60.07 134.15 216.23 238.26 250
9. Fluoride ( as F ) mg/l 0.60 0.78 0.82 1.02 1.23 1.0
10. Calcium (as Ca) mg/l 80.0 60.0 164.0 116.0 64.0 75
11. Magnesium (as
Mg)
mg/l 31.78 51.28 56.24 105.0 36.65 30
12. Sulphate ( as SO4 ) mg/l 56.4 55.4 170.0 87.8 265.0 200
13. Nitrate ( as NO3 ) mg/l 0.32 5.39 5.26 5.64 4.47 45
14. Total Alkalinity mg/l 338.0 444.0 360.0 380.0 180.0 200
15. Iron (as Fe) mg/l BDL BDL BDL BDL BDL 0.3
16. Manganese (as
Mn)
mg/l BDL BDL BDL BDL BDL 0.1
17. Total coliform MPN/
100ml
Absent Absent Absent Absent Absent Nil
18. Zinc mg/l 0.22 0.41 0.38 0.64 0.49 5.0
19. Pesticides mg/l BDL BDL BDL BDL BDL -
20. Sodium mg/l 11.25 26.32 18.23 25.42 27.98 -
21. Potassium mg/l 1.22 2.56 3.47 2.98 2.75 -
22. Copper mg/l BDL BDL BDL BDL BDL 0.05
23. Cadmium mg/l BDL BDL BDL BDL BDL 0.01
24. Selenium mg/l BDL BDL BDL BDL BDL 0.01
25. Lead mg/l BDL BDL BDL BDL BDL 0.05
26. Boron mg/l 0.014 0.25 0.34 0.68 0.49 1.0
27. Chromium as Cr mg/l BDL BDL BDL BDL BDL 0.05
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
60
3.9 DEMOGRAPHY AND SOCIO-ECONOMIC PROFILE
3.9.1 Socio-economic Environment
3.9.1.1 Reconnaissance
The study of socio-economic component incorporating various facets related to socio-economic conditions
of the project area is an integral part of the EIA. The socio-economic component of the environment with
reference to human interests, aesthetic and cultural attributes needs to be studied while delineating
Environmental Management Plan (EMP) for achieving desired targets without impairing the quality of life. In
order to carry out such studies information on issues such as land acquisition, compensation and assistance,
effect on employment and income generating facilities etc. along with parameters of health and risk was
collected. The project does not involve land acquisition therefore issues such as compensation,
rehabilitation and settlement have not been involved in the present report.
Baseline data on socio-economic parameters such as demography, infrastructure, economic resource base,
health status, cultural aspects and aesthetic attribute were generated using information available with Govt.
agencies, census data, and statistical abstracts and health agencies.
Socio-economic survey was carried out covering all the villages of the study area to record awareness,
opinion, apprehensions, quality of life and expectations of the local people about the new manufacturing
unit for organic chemicals manufacturing Esters, Surfactants/Sulphosuccinates, Defoamers / Antifoamers &
Emulsifying agents by M/S Jeevika Spakchem Pvt. Ltd at Butibori MIDC, Tehsil Hingna, Dist. Nagpur. The
opinion of local people about the proposed project was obtained through socio-economic survey of the
villages, focus group discussion and public consultation with the villagers in the proximity of Project Area.
3.9.2 Methodology
Socio-economic survey has been conducted in the villages identified in the study area. Survey was carried by
using probability census method. The unit of population like, literate, illiterate employed, unemployed,
males and females were included in the survey. The survey was conducted with the help of pre designed set
of interview schedule to assess opinion of the population regarding the project and to know their
expectations. Based on primary and secondary data available with various Govt. Departments, like census
data, PHC records, literatures, and published information analysis has been done. Probability sampling
methods has been used for sample collection during survey.
3.9.3 Demographic Structure (Based on Census Data 2001)
Study area encompasses villages from Nagpur (Rural) and Hingna tehsil of Nagpur district of Maharashtra.
Location of the villages surveyed are depicted and listed in Table 3.25.
Table 3.25
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
61
Distances & Directions of the villages surveyed
Sl.No
Name of Village
Direction Distance (Km)
With respect to Project Site
1 Waranga NE 9
2 Vathoda E 6
3 Borkhedi S 7
4 Bamhani SE 8
5 Dudha SW 9
6 Bhansoli W 7
7 Tembhari - Project Site
8 Khairi kh WWS 8
9 Wadgaon N 7
10 Pipardhara NW 8
Demographic data such as number of households, population, social stratification, literacy and work force
population of the study area has been shown in (Annexure-I).
The significant observations are as follows:
� The total population of the villages surveyed is 66257
� The ratio of Female/Male is 877/1000 for the villages surveyed as compared to the national
average of 933/1000 which is very low.
� Literacy level among the respondent is satisfactory as the educational facilities are adequate
in the villages surveyed. The literacy rate is 65%.
� The percentage of scheduled caste (SC) and scheduled tribe (ST) population is 13.9% and
16.91% respectively in the study area.
� The employment rate is 34.67% & marginal workers are 10.%.
3.9.4 Basic Amenities
The basic infrastructural facilities are as follows: (Table 3.26).
� Educational facilities are available in the form of primary and secondary schools. Mostly high
schools are private in nature. For higher education the students are availing facilities from
Butibori and Nagpur.
� Medical facilities are good in the study area, Primary Health Centre at Butibori is imparting
services, for advance medical facilities people are going to Nagpur. In each village one health
worker has been appointed by the Govt. to provide primary health facilities.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
62
� Village people are availing Drinking water facilities generally from the Hand pump, open well
and tap water. The water supply is also supplied through tanker in few villages. During
summer scarcity of water has been noted in the study area.
� Communication services like post office and telephones are available in the study area. Some
of the villagers are having mobile phones.
� 100% villages in the study area are electrified. Electricity is available for domestic and in few
areas for agriculture purpose.
Table 3.26
Provision of Basic Amenities in the Study Area
Sl.No Name of
Village
Available Amenities
Education Medical Water Supply Communication Transportation Electricity
1 Waranga A/P/M 0-5 km W/HP/Tap - BS/Auto ED/EA
2 Vathoda A 0-5 km W/HP - BS/Auto ED/EA
3 Borkhedi A/P/M/H PHC W/HP/tap PO BS/Auto ED
4 Bamhani A/P/M 0-5 km W/HP - BS/Auto ED
5 Dudha A/P 0-6 km W/HP - BS/Auto ED
6 Bhansoli A/P 0-4 km W/HP - BS/Auto ED
7 Tembhari A/P/M 0-5 km W/HP - BS/Auto ED
8 Khairi kh A/P 0-5 km W/HP/Tap - BS/Auto ED/EA
9 Wadgaon A/P/M 0-5 km W/HP/Tap - BS/Auto ED
10 Pipardhara A/P 0-6 km W/HP/Tap - BS/Auto ED
Source: Census Survey by Anviro Analysts & Engineers Pvt. Ltd, Nagpur
List of Abbreviations
Educational Institution Medical Facilities
P – Primary School CHC – Community Health Centre
S – Secondary School PHC – Primary Health Centre
H – Higher Secondary Ayu – Ayurvedic Dispensary
Communication Facility Transportation Facilities
PO – Post office BS – Bus Service
Drinking Water Power Supply
W – Well Water EA/ED – Electricity for Agriculture & Domestic and
< 5 km means the particular facility is not
available in the village but it is available
in the 5 km from that village.
HP – Hand Pump
TK – Tank Water
3.9.5 Socio-economic Survey
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
63
The social structure of the study area was assessed by selecting respondent (Stratified random sampling
method) from the villages through set of interview schedule.
The observations of the respondents during survey work are as under:
• Social changes have been observed in rural communities which reflect the positive impact of
development of project area.
• All the respondents are aware of activities of project and have favourable opinion for the
project.
• The people of the villages are anticipating better job opportunities and improvement in the
basic amenities
• Literacy level among the respondent is satisfactory.
• Educational facilities are adequate to improve level of literacy which is indicated by literacy
rate of 65%.
• Private vehicles, Auto, Tractor are the main mode of transportation. Bus, service is available in
all villages.
• All the villages are connected with each other by Pucca as well as Kutcha roads. The road
conditions are very poor in some area which leads to poor transportation during rainy season.
• The employment rate is very low (34.67%). Agriculture plays an important role in rural area;
the work force availability for the agricultural activities is low. People are engaged in the
secondary source of employment like industries, construction activities etc.
• People are having very few acres of land with them. The land is not enough to meet their
needs & therefore the workforce prefers to work in the industries and construction related
activities. Their earning is not enough to meet their requirement and therefore indebtedness
has been observed in the study area.
• 55% of houses in the study area are “Kutchha”. Generally people are using clay tiles for roof,
wooden strips and mud for construction of walls. RCC construction has been observed in
some villages.
3.9.6 Energy Consumption Pattern
The quantity of the fuel requirement for cooking depends on various factors such as no. of persons in the
family, food habits, income of the family & Cost of fuel. The fuel that is being used by villagers is fire wood,
cow dung cakes (Goari), Kerosene, LPG gas. The supply of kerosene is controlled by government and
supplied through fair price shops approved by government. As a result most of the villages used more than
one type of cooking fuel.
3.9.7 Health Status
The morbidity pattern in the study area collected from PHC of Butibori is presented in Table 3.27
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
64
Fever, diarrhea, gastritis, malaria and skin diseases are common diseases and few cases of T.B, Leprosy, RTI,
have been reported in this PHC. During discussions with Medical officer of PHC he pointed out that common
fever, diarrhoea and respiratory disorders are due to seasonal changes. Ring worm infestations are mostly
reported among the patients. The main cause of infestation is the contaminated use of water and lack of
cleanliness.
Table 3.27
Morbidity Status Data: (Public Health Center: - Borkhedi)
Period: Jan 2011 to Dec 2011
Sl.
No.
Month Fever Jaun-
dice
Diarrhea Gastritis Typhoid Malaria TB Skin Asthma RTI Leprosy
1 January 37 - 03 - - - 01 - - - 0
2 February 49 - 02 - - - 0 - - - 0
3 March 40 - 01 - - - 0 - - - 0
4 April 27 - 04 - - - 01 - - - 0
5 May 26 - 03 - - - 0 - - - 0
6 June 21 - 02 - - - 02 - - - 0
7 July 15 - 04 - - - 0 - - - 0
8 August 32 - 05 - - - 0 - - - 0
9 September 30 - 03 - - - 01 - - - 0
10 October 25 - 04 - - - 01 - - - 0
11 November 37 - 02 - - - 0 - - - 0
12 December 40 - 02 - - - 0 - - - 02
Total 379 - 35 - - - 06 - - - 02
3.9.8 Economic Resource Base
Agriculture is the basic profession in the study area and plays an important role in economy. Agriculture
production has been lowered down due to insufficient facility and poor resources of irrigation. The impact of
poor agriculture production leads to insufficient income generation and it causes migration, indebtedness,
and people on the move to work as a labour in nearby industry. To develop their economic strength villagers
prefer construction related work, fishery, dairy and other live stock related activity. The agricultural land is
not that much productive hence the yield is not satisfactory therefore local people have developed and
adopted other skills to earn money for their daily requirement. Youth of the project area are literate and
have the capacity to grasp any occupation, hence project area has a potential to develop their economy.
Major khariff crop in the entire project area is cotton and soya bean. The rate of production is approximately
5 to 7 Quintals per acre per year for cotton and 4 to 6 Quintals per acre for soybeans. In some are Gram,
wheat, Maze and vegetable are the secondary crops depends upon the facility of irrigation however all crops
are rainfed.
3.9.9 Awareness and opinion about the project
� The respondents from almost all the villages are aware about the project activity.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
65
� The respondents from the nearby villages have shown favourable opinion about activity as it
may lead to increase in infrastructural facilities, job opportunities and business opportunities,
but at the same time people are worried about the likely increase in environmental pollution
in the region.
� Respondent have suggest minimizing the environmental pollution during and after project
activity.
� The project affected population expects permanent jobs in the projects.
� The educated youths opined that the management should give preference to them/local
people for employment as per their educational qualifications.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
66
4. ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
4.1 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
As a part of present EIA study, anticipated environmental impacts associated with the activity to be
carried out for proposed project have been identified. Various activities during the construction &
operation phase of the project, which are likely to cause an impact on various environmental
components, have been listed. For evaluation of impacts due to proposed manufacturing activities of
the unit, the baseline data generated for environmental parameters presented at chapter - 3 of this
report has been utilized. Changes in the environmental parameters and their impact, whether
short term or long term, positive or negative are identified & predicted and described in this
chapter.
All necessary mitigative measures to combat the likely environmental impacts associated with the
project activities have been listed in this chapter.
Of the various techniques available for the impact identification like checklists, matrices networks,
cause-effect diagrams, computer simulation models etc., Matrix method has been used for the
impact identification of proposed project.
4.2 IDENTIFICATION OF IMPACTS
An attempt has been made to identify the environmental impacts associated with the different
components of the project by establishing cause-effect relationship through impact identification
matrix as presented at Table no. 4.1. This method uses a matrix format to relate project actions with
environmental components. The column of the matrix consists of all the project actions (short-
listed as per specific project) against rows of the matrix of environmental components
(attributes). If a project action is likely to make an impact on environmental component, the
appropriate cell is marked and importance of the impact on an arbitrary scale is assigned for positive
or negative i.e. harmful or beneficial nature of the impact.
4.3 IDENTIFICATION OF IMPACTING ACTIVITIES
Various activities involved in the proposed project are divided viz.:
A. Construction phase activities
B. Operation phase activities
The activities identified for the proposed project under each phase are:
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
67
A. Construction phase
1. Excavation
2. Foundation & Civil work
3. Transportation of construction materials,
equipments & machineries
4. Installation of equipments & machineries
B. Operation phase
1. Plant operation
2. Material storage and handling
3. Utilities & Services
4. Green belt development
4.4 IDENTIFICATION OF ENVIRONMENTAL ATTRIBUTES
Environmental attributes likely to be affected due to activities involved in different components of
different phases are:
1. Water environment
2. Air environment
3. Noise environment
4. Land environment
5. Socio-economic Environment
a. Employment generation
b. Occupational Health & Safety
Table No. 4.1 IMPACT IDENTIFICATION MATRIX
Project Activity Environmental Attributes
Water
Quantity
Water
Quality
Air
Quality
Noise Terrestrial
Ecology
Socio-Economic Environment
Employment
Generation
Occupational
Health &
Safety
Construction Phase
Excavation X X X X X
Foundation & Civil
Work
X X X
Transportation of
construction materials
X X X
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
68
and
equipments/machineri
es
Installation of
machineries &
equipments
X X
Operation Phase
Plant Operations X X X X X
Material Storage &
Handling
X X X
Utilities & Services X X X X
Green belt
development
X X X X X X
4.5 IMPACT ASSESSMENT
4.5.1 Impact on Water Environment
Water is essential for human, agriculture, industry and commercial use. The water environment
broadly covers the following points for consideration of impacts:
a) Industrial operations, their effect on water quality and ground water potential of study area.
b) Identifying potential sources of pollutants focusing specifically on discharge of
wastewater.
The total water requirement for the proposed project will be @ 7 KL/day. The detail of water
consumption is shown at Table no. 2.6. The source of water supply for proposed project will be
MIDC, Butibori.
There will not be waste water generated from manufacturing process. The waste water i.e 2
m3/day will be generated only in the form of boiler blow down and washing water. This
generated waste water will be given primary treatment in the proposed ETP of capacity 3
m3/day and then sent to CETP Butibori. Hence, there will not be any discharge of
wastewater from the proposed manufacturing unit.
The generated domestic waste water will to septic tank and soak pits and overflow if any
sewage will be utilized for gardening.
The details of waste water generation for proposed project is shown at Table no.2.8.
As there will be no discharge of effluent into ground or surface water or onto land, no
impact on ground or surface water quality due to wastewater discharge is envisaged for the
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
69
proposed project.
Some of the mitigation measures to minimize the likely environmental impacts on water
environment, due to operation of the proposed project are described below:
Table No. 4.2 Mitigative Measures for Water Environment
Sr.No. Environmental Attribute Mitigative Measures
1. Water Optimum use of water will be done for construction
activities required for proposed expansion.
Any wastages/leakages will be avoided at all possible
Locations / opportunities.
Proper handling of spillages if any will be ensured by
introducing spill control procedures for various chemicals
Water usage will be carefully monitored and re-use shall
be maximized to the extent possible
Proper facilities for storage of raw materials (i.e. with
roof and pucca floor) will be provided to prevent storm
water contamination during the storage of various
raw materials.
Monitored data will be analyzed and reviewed at regular
intervals and compared with the operating standards so
as to take necessary corrective actions.
Enough care will be taken to prevent any leakages /
accidental spillages from storage tank of generated
waste water from utilities in order to avoid any ground
water resource contamination.
Generated domestic waste water will be treated and
reused for green belt development.
The regular environment monitoring is done through
established laboratory and the same practice will be
4.5.2 Impact on Air Environment
For the control of air pollutants emitted from process gas emission from the proposed
production capacity and to meet with the prescribed norms, necessary Air Pollution Control
measures will be provided.
The details of proposed Air Pollution Control measures for process gas emission is shown at Table No.
4.2.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
70
Table 4.2 Details of Stack
Sr. No Stack 1
Attached to Thermic Fluid Heater
Capacity 2 Lacs KCal
Fuel type LDO
Fuel quantity 0.30 MT/Day
Material of construction Mild steel
Shape round
Height 24.0 m
Diameter 1.0m
Gas temp 1160C
Exit gas velocity 12-13.0 m/s
Control equipment preceding
stack Scrubber
Nature of pollutants TPM,SOx, NOx
LDO will be used as fuel for the boiler for proposed manufacturing production capacity.
For the control of process gases emitted into the atmosphere from the proposed
manufacturing production capacity, scrubber will be provided.
Vehicular traffic associated with the construction as well as operation phase of the proposed
project for transportation of raw materials and finished products lead to increased concentration
of SPM, NOx, CO etc., through exhaust gases from their original concentration in the
surrounding environment, affecting the ambient air quality of surrounding areas. However, this
effect remains localized near to the plant site during the time of vehicular movement only. Increased
level of concentration associated with exhaust gases will return to its original state with the
passage of time. Hence, this impact is envisaged as short term negative and reversible in nature.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
71
Air quality will deteriorate for small period of time, during transportation, loading & unloading of
various materials etc. This impact will be negative in nature for prevailing ambient air quality but it
will last for short period of time and will remain confined within the plant premises.
Air Pollution Dispersion Modeling of Stack Emissions
To evaluate the impact of emissions from the plant proposed stack on the baseline ambient air
quality of the study area, air pollution dispersion modelling has been carried out and described in the
following sub-sections:
For the purpose of modeling, the movement and dispersion of air emissions, the following potential
emissions from the construction/operational activities at the proposed site have been considered.
Construction Phase:
During the construction phase, SPM is expected to be the main pollutant associated with on-site roads
(paved and unpaved), stockpiles and material handling. In this case, pollution emission sources are
distributed throughout the project site and shall fall under the category of area source. The land
acquired is flat, so extensive formation work is not done during this phase. Surplus excavated material
shall be disposed to the approved dumping site.
Due to the confined nature of heavy construction activity during this limited period, tailpipe emissions
from construction equipment are assumed to be essentially negligible. In the absence of information
regarding the quantity and type of construction equipment to be deployed at any particular time,
emission factors for construction activities were used for emissions estimates. Overall SPM emissions
were estimated using the emission factor of 1.2 tons SPM/ month of activity/ acre as per AP-42
Section 13.2.3.3 (U.S. EPA, 1995). This emission factor is most useful for developing estimates of
overall emissions from construction throughout a geographical area and most applicable to
construction operations with medium activity level, moderate silt contents, and semiarid climate (U.S.
EPA, 1995). The derivation of the factor assumes that construction activity occurs 30 days per month,
for 24 hours making the above estimate somewhat conservatively high for total suspended particulate
(U.S. EPA, 1995).
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
72
The entire site will be developed in phase manner; therefore different section of the site will generate
SPM in a progressive manner. To achieve most conservative results, it has been assumed that the full
site is under construction activity, emitting particulates.
At the time of construction, by adopting control measures, dust generation can be brought
down by 85-95%. Thus, the dust emission factor given above has been reduced by 90% to arrive at the
expected emissions from the site due to construction activity.
Operation Phase:
Tools and Methods
The major sources of pollutant in the proposed project are point sources due to Stack and the DG sets
installed at the project. The vehicle pollutant dispersion analysis is undertaken based on AERMOD
(version 6.8.3) software. The software enables analysis with respect to CO, NO2 and PM and gives
results in easy to understand graphical format.
The following steps are involved in the analysis:
1. Inputs are entered into the software as per the general modeling parameters.
2. Information on the roadway network, traffic volume and receptor is added to the software.
3. The analysis process is done by the software
Input(s) needed and assumptions
Table 4.2: Inputs and Assumptions
Sr.
No
Inputs Required Availability for
this project
1 Type of Fuel used by each category Diesel, LDO
Fuel Quality yes
2 Meteorological Parameters Wind Speed IMD weather data
Wind Direction IMD Weather data
3 Emission Parameters Expressed in grams/distance
traveled
CPCB Manual
USEPA, AP-42
4 Type of Terrain Urban Assumed
5 Background Concentration of
Pollutants
PM- 37.39 μg/m3
Sox-16.64 μg/m3
Nox-11.43 μg/m3
CO-0.73 mg/m3
6 Receptor Location Uniform grid
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
73
Figure 4.1: Isopleths of Ground level concentration of SOx
After the development of project site SOx concentration is around 0.127 µg/m3 to 0.145 µg/m3 and the
highest concentration is observed to be around 0.164 µg/m3.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
74
Figure 4.2: Isopleths of Ground level concentration of NOx
The NOx concentration at project site is observed as 0.040µg/m3 to 0.046 µg/m3 and the highest
concentration is observed to be around 0.059 µg/m3
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
75
Figure 4.3: Isopleths of Ground level concentration of Co
The Co concentration at project site is observed as 0.149µg/m3 to 0.165 µg/m3 and the highest
concentration is observed to be around 0.165 µg/m3
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
76
Figure 4.3: Isopleths of Ground level concentration of Particulate matter
The concentration of Particulate matter at project site is observed as 0.011 µg/m3 to 0.013 µg/m3 and
The maximum concentration is observed is 0.014 µg/m3.
The modeling results do not exceed the standards for the present and in the future. The Ground Level
Concentration of the pollutants at the project site is shown in table 4.4. The standards of emission are
shown in Table 4.5. The modeling results do not exceed the standards for the present and in the
future
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
77
Table 4.4: SOx, NOx and PM Concentrations
Pollutant Concentration at Project Site PM SOx NOX CO
(µg/m3) (µg/ m
3) (µg/m
3) (mg/m
3)
Baseline Concentration 37.39 16.64 11.43 0.73
Concentration Due to Project 55.275 20.401 79.148 0.165
Combined Concentration 10.694 21.983 13.808 0.895
Table 4.5: NAAQS Standard for Ambient Air Quality
Standards Permissible limits acc. To NAAQS.
Sox 80 µg/m3 (24 hrs)
PM 60 µg/m3 (24 hrs)
NOX 80 µg/m3 (24 hrs)
CO 2 mg/m3
As part of precautionary measure, to minimize the likely environmental impacts on air
environment due to the proposed project, necessary mitigation measures are described below:
Table No. 4.3 Mitigative Measures for Air Environment
Sr.No. Environmental Attribute Mitigative Measures
1. Air Handling of soils and construction materials will be
carefully managed to minimize the risk of wind-blown
material and dust.
For suppression of dust during required construction
activities, water will be sprinkled at regular interval.
The recovery of solvent is done through effective working
of solvent recovery system to maintain work area air
quality.
For the process area of proposed manufacturing capacity,
proper ventilation will be provided on the shop floor for
proper air circulation to maintain the work area air quality.
Proper preventive maintenance of fuel firing system will be
ensured.
Air - fuel ratio will be optimized
It will be ensured that the vehicles to be deployed at the
site should have PUC certification.
In addition to the above stated process controls, development of green belt will act as a pollutant
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
78
sink and can help to control the spread of pollution in the surrounding area. It will have positive
effect on the surrounding area. Unit can also participate in community green belt development
programs to compensate the adverse effects on the ambient air surrounding the plant site.
4.5.3 Impact on Land / Soil quality
The proposed production is to be carried out in a land area (@1974 m2 in notified Industrial Area.
Hence, there will not be any change in land use of the proposed project site. So, there is no impact
envisaged on existing land use pattern of the project site.
Solid waste generated from existing production activity will segregated properly. Biodegradable waste
will be sent for composting whereas Non-biodegradable waste will be sold outside. There will not be
any hazardous waste generated. Hence, no significant negative impact is envisaged on the
surrounding soil quality due to presence of solid / hazardous waste within the plant premises.
Necessary mitigation measures to minimize the likely environmental impacts on soil quality / land
environment due to operation of the proposed unit is described below:
Table No. 4.4 Mitigative Measures for Land/Soil Environment
Sr.No. Environmental Attribute Mitigative Measures
1. Soil Quality & Land
Environment The practice of segregation and storage of solid waste
generated will be done for the proposed project.
Regular record keeping of volumes / weights of wastes
generated and disposed will be maintained for the
proposed project.
There will be no disposal of untreated water on land for
the proposed manufacturing activity.
4.5.4 Impact on Noise Environment
Vehicular movement for transportation of various raw materials and finished products is one of the
sources of noise generation during operation phase of the project. Noise generation associated with
vehicular movement within the plant premises will increase ambient noise levels for shorter
period of time and the negative impact generated due to this will get reversed with the passage of
time.
Because of proposed project, there will be increase in sources contributing to noise generation.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
79
Necessary mitigation measures to minimize the likely environmental impacts on noise environment
due to operation of the proposed project is described below:
Table No. 4.5 Mitigative Measures for Noise Environment
Sr.No. Environmental
Attribute
Mitigative Measures
1. Noise High noise generating machines and processes required for proposed project
will be enclosed and insulated.
Insulation of ventilation pipes and use of dampers will be made at all
possible places.
Implementation of management control on site for limiting transportation
timing by adopting mechanical and
technological ideas.
Preventive maintenance schedule will be followed for all
instruments and machineries to maintain good working
condition.
Enclosures and barriers will be provided to pumps and machineries
producing high noise levels, required for proposed expansion.
There will be periodical noise level measurements for verifying
compliance with relevant laws.
Workers exposed to high noise generating operations will be provided with
suitable ear protection devices.
Green belt development will act as a medium for noise absorbance.
4.5.5 Impact on Biological Environment
The proposed production is to be carried out in Notified Industrial Area. Hence, no significant
impact associated with displacement of prevailing floral & faunal species is envisaged on
surrounding biological environment due to proposed project activity.
There will not be any discharge of effluent from the proposed plant directly into any water body;
hence there will not be any impact on aquatic ecology of the surrounding area.
Air emissions generated within the plant premises will be always kept within the prescribed limit and
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
80
hence no significant impact on terrestrial ecology is expected. There will be development of green
space / green belt within the proposed plant premises, which leads to reversing the various negative
impacts associated with plant operation as well as it can also help develop terrestrial and avian
ecology with positive effect in the long run.
4.5.6 Impact on Socio-economic Environment
Unit will provide employment opportunity to locally available skilled and un-skilled labours within its
manufacturing facility as per the requirement and availability, which is a positive impact on
prevailing socio-economic environment.
Impact in terms of displacement of habitation and settlements due to the proposed project is
totally absent as the unit is to be located within notified industrial area.
Increased vehicular movement associated with the project operation phase will have short
term negative impact on noise and air environment surrounding the plant site.
No loss or disturbance of any historic and cultural heritage is associated with the
proposed project.
Proposed project will provide the surrounding region business potential as well as
subsequent employment opportunities.
Existence of proposed project will lead to increase in the job opportunities for the
qualified and skilled as well as unqualified and unskilled people in project region.
At a large this industrial development along with employment potential poses long-term positive
impact on the socio-economic environment as it provides benefits in terms of economics to the
people employed with it.
4.5.6.1 Actions for Socio - Economic Environment
Locally available man-power will be employed by the management in the manufacturing
activity. A full-flagged emergency preparedness plan will be prepared to deal with fire fighting,
evacuation and local communication. Organization will provide basic amenities viz. safe drinking
water, sanitation facility & medical treatment for workers of the unit.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
81
4.5.7 Impact on Occupational Health & Safety
In the operation phase of the project, various effects on occupational health and safety of the
employees working in the plant are envisaged. Major health and safety issues encountered will
be physical hazards, respiratory hazards, electrical hazards, noise, fire & explosion hazards
associated while working within manufacturing plant. Also, chemical industry poses risks such
as accidents due to spillage, fire and explosion. Preventive safety measures taken to minimize
the risk of accident with respect to chemical handling will be as follows :
Table No. 4.6 Mitigative Measures for Occupational Health & Safety
Sr.No. Environmental
Attribute
Mitigative Measures
1. Occupational
Health &
Safety
All reasonably practical measures will be adopted by the unit to minimize
the risk of accidents within the manufacturing unit.
All building plans and installations will be as per relevant laws and will be
approved by competent authority.
Trained workers will be employed for all the hazardous process
operations within the plant and will be supervised by experienced supervisors.
Safety features such as fire extinguishers at strategic
locations and suitable personal protective equipments will be
provided.
Flame-proof electrical fittings, flame arrestors etc., will be installed.
All the raw materials & solvents will be stored in designated storage area
equipped with necessary safety features.
Periodic inspection & testing of pressure vessels, equipments,
machineries will be done
Good house-keeping will be ensured within the factory premises.
Training will be provided to the designated staff & workers for fire fighting,
work permit system, first aid & safe handling of hazardous chemicals.
Incident / accident reporting system will be developed and all the employees
will be made aware for the same.
Suitable notices / boards will be displayed at designated locations
indicating appropriate hazard warnings.
Antidotes as well as MSDS for all the chemicals will be made available
within the factory premises.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
82
With effective implementation of the mitigative measures and keeping the workers well equipped
with necessary personal protective equipments and training for the safety aspects to be followed
during working hours, the occupational health and safety impacts can be controlled.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
83
5. ENVIRONMENTAL MONITORING PROGRAMME
5.1 INTRODUCTION
Regular monitoring program of the environmental parameters is essential to take into account the
changes in the environment. The objective of environmental monitoring program is :
• to verify the results of the impact assessment study with regards to new development.
• to follow the evolution of parameters which have been identified as critical.
• to check the effectiveness of the environment management system in
operation.
• to confirm statutory compliance.
5.2 ENVIRONMENTAL MONITORING & CONTROL
To implement midterm corrective measures as well as to achieve effective
implementation of the same, environment monitoring and control program is
essential. Regular monitoring of environmental parameters is of immense
importance to assess the status of environment during project operation. With the
knowledge of baseline environmental status, monitoring program will serve as a tool
to assess any deterioration in environmental conditions due to operation of the
project.
Generally the EIA study for any project is carried out over a short period of
time and the data generated cannot bring out all variations induced by natural or human
activities. Hence, regular monitoring program is essential to take into account the changes in the
environment quality.
Scope of the monitoring program generally focuses on various environmental
parameters viz., Air quality, Water quality, Noise, Soil characteristics, Ecology, Land
use pattern and socio-economic environment. For the proposed project, monitoring
of various environmental parameters will be required to assess proper functioning
and efficiency of all the proposed pollution control systems. For the proposed project,
monitoring activity is mainly envisaged for stack emissions to analyze the
performance of air pollution control system and to measure the prevailing noise levels due to plant
operation.
5.3 PROPOSED MONITORING PROGRAM
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
84
The monitoring program for proposed project of M/s. Jeevika Spakchem Pvt. Ltd., is shown at Table
No : 5.1.
Table 5.1 Environmental Monitoring Schedule
Sr.No. Particulars Frequency of
Monitoring
Duration of
Monitoring
Parameters for Monitoring
1. Air Quality
Ambient Air Quality
within the plant
premises
Monthly One 24 hourly
sample
PM10, SOx, NOx,PM2.5, CO
Continuous monitoring of fugitive
emissions in work
area will be provided.
Stack Monitoring Monthly PM,SOX,NOX,CO
2a. Water & Waste Water Quality
Raw water quality
within plant
premises
Once in three
months
Grab As per CPCB MoEF specification
2b. Waste water Quality
Quality of raw
effluent
Daily Primary parameters such as
PH,COD,BOD,TDS,SS,Temp,Colour
Quality of treated
effluent
3. Soil Quality
Within plant
premises at 1
location
Once in a year Composite
Sample
Physical and chemical parameters.
4. Noise Quality
Within plant
premises at
identified locations
Once in three
months
8 hourly Leq levels
At the periphery of
plant premises at
least 5 locations
8 hourly Day and Night time Leq levels
5. Work Zone Once in three 8 hourly SPM,HC,VOC
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
85
monitoring months
6. Solid waste
generation
Records of quantity of generation, handling, storage and
transportation of solid waste will be maintained.
7. Employee Health Pre –employment and periodic health check-up of employees at least
once in six months.
5.4 REPORTING SCHEDULES OF THE MONITORING DATA
Voluntary reporting of environmental performance with reference to EMP will be undertaken.
The in-charge of environment, health and safety department of the unit has to co-ordinate all
monitoring programmes at site and data generated shall be submitted regularly to the
statutory agencies. Frequency of reporting shall be once every six months to MPCB and
Regional Office of MoEF.
5.5 INFRASTRUCTURE REQUIREMENT
For carrying out regular environment monitoring, the unit should have a full fledged
dedicated environment laboratory. If monitoring / analysis has to be outsourced to outside
agencies, MoEF / MPCB recognized agencies should be deployed.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
86
6. PROJECT BENEFITS
The scope and nature of the potential benefits varies between the construction phase
and the operational phase of the project. Potential project benefits such as improvement in
the physical infrastructure, social infrastructure, employment and other tangible benefits
related to these two phases of the project are discussed below.
6.1 IMPROVEMENT IN THE PHYSICAL INFRASTRUCTURE
The project site is already located in a notified industrial area MIDC Butibori, Taluka:
Nagpur and is easily approachable by the adjacent MIDC road. So, as per availability of existing
physical infrastructure there are no need for any improvement in the physical infrastructure.
6.2 IMPROVEMENT IN THE SOCIAL INFRASTRUCTURE
The basic requirement of the community needs will be strengthened by organizing healthcare
camp, educational facilities, skill training to the community, sports activities and other similar in
the area, which will help in uplifting the living standards of local communities. Due to the increase in
utilizing the local habitants there shall be significant changes in the socioeconomic scenario of the
area.
6.3 EMPLOYMENT POTENTIAL- SKILLED; SEMI-SKILLED AND UNSKILLED.
Project will create direct & indirect employment opportunities within the surrounding region. Unit
will use good faith efforts to employ local people from the nearby villages depending upon the
availability of skilled & un-skilled man-power surrounding the project site.
In operation phase, the proposed project would require significant workforce of non-technical and
technical persons. Migration of highly education and skilled experience will result in increase of
literacy in the surrounding villages.
In addition, the proposed project shall enhance the prospects of employment.
6.4 OTHER TANGIBLE BENEFITS
Assessment of the potential socioeconomic benefits during construction
focused primarily on work force requirements, acquisition of supplies, and the
temporary increased demand for services related to the construction project like
food, housing, communications, law enforcement, medical care, local transportation
etc. Due to these, additional revenue to local suppliers for required products and
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
87
services related to the construction and operation phases of the project will generate.
Thus, construction activities will provide numerous new, although temporary, work opportunities
for both skilled and unskilled labor, as well as contribute significantly to the local economy.
Additional government revenue expected from royalty, taxes, duties and other fees.
An added benefit to the proposed project will result in considerable growth of stimulating the
industrial and commercial activities in the state. Small and medium scale industries may be further
developed as a consequence.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
88
7. RISK ASSESSMENT
7.1 INTRODUCTION
M/s. Jeevika Spakchem Pvt. Ltd., will be manufacturing Organic Chemicals i.e Esters, Surfactants /
Sulphosuccinates, Defoamers / Antifoamers and Emulsifying agents.
Hazard is defined as a chemical or physical conditions those have the potential for causing
damage to people, property or the environment. The potential hazards at the plant are
enumerated below:
Hazard identification is the first step in the risk analysis and entails the process of collecting
information on:
• the types and quantities of hazardous substances stored and handled,
• the location of storage tanks & other facilities,
• Potential hazards associated with the spillage and release of hazardous
chemicals.
7.2 QUANTITIES OF HAZARDOUS MATERIALS:
Methanol is the only hazardous chemical stored at the plant. It is stored in tanks at isolated
storage area.
7.3 CHARACTERISTIC OF HAZARDOUS MATERIALS
Methanol:- Methanol is a colorless liquid that boils at 64.96° C (148.93° F) and solidifies at -93.9° C (-
137° F). It forms explosive mixtures with air and burns with a non luminous flame. It is a violent
poison; many cases of blindness or death have been caused by drinking mixtures containing it.
Material Safety Data Sheets (MSDS) is enclosed as Annexure-II.
7.4 HAZARDS FROM STORAGE AND HANDLING OF HAZARDOUS MATERIALS:
Pool Fire:
A leak or spill of sufficient size of flammable liquid will result in an accumulation of flammable
liquid on the ground or in bund or dyke. If ignited, the resulting fire is known as spreading or fixed
pool fire. Objects coming in contact with the flame above the pool will be severely damaged or
destroyed and personnel exposed to flame will suffer extensive burn injuries. Objects and
personnel outside the actual flame volume may also be affected or injured by radiant heat.
The extent of damage or injury depends on the heat flux and duration of fire and exposure. If a
large area of the body receives second and third degree burns, it can result in fatalities.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
89
The extent of injury to people depends on the heat flux and duration of exposure. The extent of
damage to property or environment depends on the size of the pool and the duration of fire.
Vapour Cloud Explosion :
If released flammable vapour are not ignited immediately, the cloud of
vapour will spread in the surrounding area. As long as the concentration of
vapour is between the lower and upper flammability limits, the vapour cloud
may be set on fire by an ignition source. For generation of over pressure
effect, some degree of confinement of the flammable cloud is required.
Flash Fire :
When released quantities of flammable vapours are not ignited
immediately, vapour cloud of flammable vapours spreads in the surrounding area, some amount of
flammable vapours concentration will be between the
lower and upper flammable limits, the vapour cloud may be set on fire by an
ignition source in entire length of flammable vapour cloud resulting flash fire.
In the event of flash fire, essentially, no over pressure effect is occurred.
7.5 HAZARDOUS CONDITIONS DUE TO RELEASE OF HAZARDOUS MATERIALS:
As a result of release of flammable liquid followed by immediate or delayed ignition,
following hazardous conditions may be encountered at and surrounding the plant.
Thermal Effects :
In case of pool fire, thermal effect is likely to cause injury or damage to people and objects. A
substantial body of experimental data exists and forms the basis for thermal effect estimation. The
consequence caused by exposure to heat radiation is a function of:
• Radiation energy onto the human body [kW/m2];
• Exposure duration [s];
• Protection of the skin tissue (clothed or naked body).
Delayed Ignition & Explosion :
In case of delayed ignition of flammable inventories, two physical effects may occur in following
ways:
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
90
• Flash fire over the whole length of vapour cloud;
• Vapour cloud explosion that results in blast wave with typical peak overpressures
in circle around the ignition source. For vapour cloud explosion some degree of confinement
essential.
7.6 RISK MITIGATION MEASURES :
For risk mitigation / reduction, attempts should be made to either reduce inventories that could
get released in the event of loss of containment or failure likelihood’s or both as feasible. Risk analysis
identifies the major risk contributors, which enables prioritization of the plant that deserve special
attention in terms of inspection and maintenance in particular and over all safety management as a
whole.
For the risk reduction at the plant, the following salient suggestions and recommendations are made:
• Emergency response plan should be prepared and circulated to concern persons.
• Personnel at the proposed plant and public in surrounding area should be made aware about
the hazardous substance stored at the plant and risk associated with them.
• A written process safety information document should be compiled for generaluse.
• The document compilation should include an assessment of the hazards presented
including (i) toxicity information (ii) permissible exposure limits. (iii) physical data(iv)
thermal and chemical stability data (v) reactivity data (vi )corrosivity data (vii)
information on process and mechanical design.
• Predictive and preventive maintenance schedule should be prepared for equipment,
piping, etc. and thickness survey should be done periodically as per standard practices.
• Safe work practices should be developed to provide for the control of hazards during
operation and maintenance such as: i. lockout /tagout ii. confined space entry ii. opening
process equipment or piping iii. control over entrance into a facility by maintenance,
contractor, laboratory, or other support personnel.
• Personnel engaged in handling of hazardous chemicals should be trained to respond in
an unlikely event of emergencies.
• The plant should check and ensure that all instruments provided in the plant are in good
condition and documented.
• Safety measures in the form of DO and Don’t Do should be displayed at strategic locations
especially in Marathi and English.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
91
7.6.1 Hazard Control Measures for storage of Methanol :
• Procedures and actions for methanol handling and storage will be well defined and known to all
operating personnel for safe shut down of the plant in case of failure of any power,
instrumentation, cooling water, air, etc.
• The tank will be provided with temperature indicator, pressure gauge and safety valves
depending upon the process and operating parameters.
• HAZOP studies will be carried out using P&IDs for identification of hazards during operation
considering deviation of operational parameters, their possible cause and consequence and
safe guards.
• Interlocks will be provided for reaction process.
• All the motors and other rotating equipments/machines will be provided with suitable safety
guards.
• Bound walls, bonded wire fencing, detached storage area will be kept away from probable
ignition sources;
• Certificate of structure stability will be taken from competent person.
• Insulation of piping has been provided as per requirement.
• All elevated structures will be provided with lightening arrestors.
• All piping and equipment will be provided with earthing connection and these are tested
regularly.
• SOP is available of safe shut-down of plant during any emergency situation.
7.6.2 Spillages and Leakages Control:
Depending on the leaking rate/source, the following actions are taken.
• Isolation/cutting of supply at the leaking point, transfer to some other vessel/equipment,
and using protective appliances like hand gloves, helmets, PVC suits etc.
• Efforts will be made to prevent the spread of spillage by neutralization/ earth barriers.
7.6.3 Hazard Control Measures for storage and transportation of Methanol:
The following safety precautions are suggested during transportation of methanol in tankers,
while unloading, transportation and meeting the emergencies arising out of leakages and
spillages of hazardous materials:
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
92
• Park the vehicle at designated place.
• Stop the engine.
• Check up spark arrester.
• Provide earthing to tanker securely.
• Ensure that fireman is available near the place with proper equipments
• Connect the piping properly
• Before start unloading, check that, there should not be any leakage.
• In case of leakage, immediately attend the leakages and rectify it.
• After unloading is over, close the lid properly.
• Vehicle to be started only after removal of all pipelines connected with tanker.
7.6.4 Safety Instructions For Transportation of Methanol :
• The name of the chemical along with pictorial sign denoting the dangerous goods are marked
on the vehicle and the packing material.
• The name of the transporter, his address and telephone number are clearly written on
the road tanker and on the vehicle.
• The important safety precautions are mentioned on the tanker as a warning label.
• Only trained drivers and cleaners are engaged in transport of hazardous chemicals.
• The transporter and manufacturer must ensure the safe transportation of the material.
7.6.5 Tankers :
• The tankers are checked for its fitness and safe condition before loading.
• During loading and unloading, the tanker should be braked and isolated against any
movement, while loading/unloading, use safety appliances.
• Check for leakages from the line connections before starting and stopping the filling
operations.
• Drive the vehicles carefully, especially in crowded localities and on bumpy roads.
• Do not apply sudden break.
• The tanker should not be parked for long time on the way and especially in crowded
places. Park the vehicle away from residential areas.
7.6.6 Occupational Health Surveillance Programme :
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
93
The plant shall adopt medical surveillance program for employees, who are or may be exposed to
hazards. Proposed Occupational Health Surveillance Programme are described below:
• Identification of occupational health hazards.
• 24 hrs Health Officer availability
• External Training of Health Officer to handle any emergency
• First aid kits to all employee’s vehicles.
• Regular visit of qualified Doctor.
• Provision of blood and lung tests for all employees working in process areas.
• Work floor monitoring.
In addition of above, following steps will also be taken for elaboration of occupational health of
workers:
• Regular monitoring and evaluation of noise levels, illumination, dust.
• Use of Appropriate Personal Protective Equipments depending upon
• Safety practices for handling of hazards and spill control will be strictly followed to avoid
entering the hazards into body of workers either through inhalation ingestion or through
skin absorption.
To avoid musculo skeletal disorders (MSD), backache, pain in minor or major joints, fatigue, etc in the
employees working at the proposed plant, following steps shall be taken:
• Scheduling working hours in process and hazardous area with the employee;
• Scheduling of workers deployment in process area by rotation so that exposure to hazards
can minimize.
• Regular monitoring of work floor environment
• Providing training to employees to handle hazards safely.
7.6.7 Personal Protective Equipment :
Personal protective equipment are devices that are fitted and issued to each worker personally for
his or her exclusive use. They are intended for temporary use and emergency response action only.
If a worker must enter a contaminated area, he must wear adequate protective equipment. Employees
should be taught when and how to use respiratory apparatus provided, and how to recognize
defects in the equipment. Full dress escape drills should be conducted at least once a year. If such
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
94
safety equipment is not available, entry into the contaminated area should not be attempted.
• Keep personal protective equipment where it can be accessed quickly, outside the
hazardous material storage area and away from areas of likely contamination.
• Each employee should maintain his / her personal protective equipment in clean, working
condition at all times.
• All equipment should be used and maintained in accordance with the
manufacturer’s instructions.
7.6.8 Handling of Hazards :
• Personal protective equipment used by the person during handling of methanol, should be
replaced after certain time.
• If any spillage of methanol, it should be cleaned and disposed as per standard practiced.
• Personnel engaged in handling of methanol should be made aware of properties of
hazardous chemicals.
7.6.9 General Working Conditions :
(a) House Keeping :
All the passages, floors and stairways should be maintained in good condition. The system should
be available to deal with any spillage of dry or liquid chemical at the plant.
• Walkways should be clearly marked and free from obstructions.
• In the plant, precaution and instructions should be displayed at strategic locations.
• All pits, sumps should be properly covered or securely fenced.
• Roads/walkway within the plant should be maintained neat and clean.
(b) Ventilation :
• Adequate ventilation should be provided in the work floor environment.
• The work environment should be assessed and monitored regularly.
• Local ventilation is most effective method for controlling dust and gaseous emissions at
work floor.
7.6.10 Safe Operating Procedures :
Safe operating procedures should be available for mostly all operations and equipment. The
workers should be informed of the consequences of failure to observe the safe operating procedures.
7.6.11 Work Permit System :
Work permit system should be followed at the plant. Hazardous work permit should be used for hot
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
95
work, electrical works, etc.
7.6.12 Fire Protection :
• Adequate fire fighting facilities should be available at the plant.
• The fire fighting system and equipment should be tested and maintained as per relevant
standards.
• The fire drills should be conducted once in six months.
7.6.13 Emergency Preparedness
• On-site emergency plan should be prepared and readily available for an unlikely event of
emergency.
• Emergency telephone numbers should be available and display properly strategic
locations.
7.6.14 Communication System
• Adequate communication facilities should be available at the plant and supported
with uninterrupted power supply.
• Communication facilities should be checked periodically for its proper
functioning.
7.6.15 Safety Inspections:
The system should be initiated for checklist based routine safety inspection and internal audit
of the plant periodically. Safety inspection team should be formed from various disciplines.
7.6.16 Accident Reporting, Investigation and Analysis :
A system should be initiated for accident and near miss reporting, investigation and analysis.
To motivate and awareness among the personnel at the plant about safety, total accident
(lost time injury) free days can be displayed on the board prominently at strategic location.
7.6.17 Mock Drill Exercises :
Mock drills should be conducted once in six months. Exercises or Drills have two basic functions,
namely training and testing of systems. While exercises do provide an effective means of
training in response procedures, their primary purpose is to test the adequacy of the emergency
management system and to ensure that all response elements are fully capable of
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
96
managing an emergency situation.
Mock drills are best means of accomplishing the following goals and
objectives:
• To reveal weaknesses in the plans and procedures before emergencies occur.
• To identify deficiencies in resources (both in manpower and equipment).
• To improve the level of co-ordination among various response personnel, departments and
agencies.
• To clarify each individual’s role and areas of responsibility
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
97
8. ENVIRONMENTAL COST BENEFIT ANALYSIS
The preliminary Cost benefit analysis indicates following scenario:
8.1 Environmental Cost:
Proposed Industrial project shall benefit environmental in following ways:
• Minor impact on ambient air quality due to emissions.
• Minor impact due to small quantity of water usage.
8.2 Environmental Benefits:
Proposed expansion project shall benefit environmental in following ways:
• To create an environment that could support the culture of good standards.
• To emphasize the policy of afforestation and rainwater harvesting to create a better
micro-climate in the area.
• A well designed drainage system to control flooding/ overflow of water during the rainy
season.
• The continuous inflow of people will require local transport systems like autos, taxis etc
which would help local transport business.
• Considerable number of people will be benefited by provision of job opportunity to local
people. Thus, the direct and indirect employment generation by this project.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
98
9. ENVIRONMENTAL MANAGEMENT PLAN
9.1 INTRODUCTION
An Environmental Management Plan (EMP) is a project and site specific plan
developed to ensure that the project is being implemented / operated in an environmentally
sustainable manner where all stakeholders including the project
proponents, contractors, sub-contractors, consultants understand the potential
environmental impacts arising from the project and take appropriate actions to
properly manage the same. Adequate environmental management measures need
to be incorporated during the planning phase to minimize any adverse impact and
assure sustainable development of the area. This plan helps in formulations,
implementation of environment protection measures suggested and development
and monitoring programme for environmental parameters during the operation phase
of the project.
9.2 ADMINISTRATIVE ASPECTS FOR EMP
OPERATIONAL PHILOSOPHY:
All the activities to be undertaken at the plant will be in complete compliance with all applicable
laws, regulation, standards and guidelines. In order to achieve this, the unit will establish a
resource base for the management of health, safety,
environmental and social issues during operation phase of the project. Technically
qualified and experienced staff will be in-charge of this activity. The HSE objectives for the unit
will consist of no accidents in plant, no harm to people of surrounding area and no damage to
the environment. Unit will also be responsible to the
community regarding environmental protection and will promote all practicable control
measures to ensure implementation of project operation phase in an efficient and environmentally
responsible manner.
Success of well formulated Environment Management Plan lies in the following which shall
be fulfilled simultaneously:
1) Management support
2) Efficiency of Environment Management Cell
3) Acceptability of resulting environmental quality
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
99
9.3 ENVIRONMENT MANAGEMENT CELL:
To facilitate the Environment Management System, one of the most important aspect is the
organization and personnel.
The unit will form an Environment Management Cell for achievement of the following:
• Collect information from regular monitoring and create a database.
• Analyze the data and decide the critical areas for immediate attention and corrective
actions.
• Work out action plan for implementation of the recommendations made under
Environment Management Plan.
• Prepare budget for environment management program and proper allocation of the funds
for the same.
• Qualified and experienced person in the field of Environment either
environmental engineer or environmental scientist will be appointed for overall
responsibility for the management of all the issues related to Environment, Health and
Safety within the plant. In consultation with in-charge of the plant, he will directly report to
the Senior Management (Director / Executive Director) of the company for issues related
to the Environment Management System of the unit.
Organogram of the Environment Management Cell shall be as shown below:
(Director / Executive Director) Senior Managment
Unit Head
Manager
(Environment & Safety)
EMS operation EMS Monitoring Environment, Team Health & Safety Statutory Compliance Team
EMS operation Team will be responsible for overall effective and regular operation of
Environment Management System at the plant level. EMS monitoring team will be responsible for
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
100
effective implementation of the suggested environmental monitoring program at the plant level. It shall
measure various parameters suggested
in environmental monitoring program as per suggested schedule either departmentally or
through appointing an external agency, to control the pollution
levels below the prescribed limits. It shall also rectify the problem areas in the EMS,
if any and provide necessary assistance in the form of replacement of any equipment or by improving
performance of the same. EMS monitoring team shall have to work
in close consultation with EMS operation team as well as EHS statutory compliance team. EHS
statutory compliance team will have to work towards all the required
statutory compliance associated with the plant operations.
9.4 ENVIRONMENTAL MANAGEMENT PRACTICES
Above described environment management cell will implement and coordinate the
suggested environmental management practices for mitigation of various impacts associated
with the project activity on different environmental components as described below :
9.4.1 WATER ENVIRONMENT:
• Optimum use of water will be done for construction activities required for proposed
expansion.
• Any wastages/leakages will be avoided at all possible locations / opportunities.
• Proper handling of spillages if any will be ensured by introducing spill control procedures for
various chemicals.
• Water usage will be carefully monitored and re-use shall be maximized to the extent possible.
• Proper facilities for storage of raw materials (i.e. with roof and pucca floor) will be provided
to prevent storm water contamination during the storage of various raw materials.
• Monitored data will be analyzed and reviewed at regular intervals and compared with the
operating standards so as to take necessary corrective actions.
Enough care is taken to prevent any leakages / accidental spillages from ETP units in order
to avoid any ground water resource contamination. And the same practice will be continued
for the proposed expansion.
• Generated domestic waste water will be treated and reused for green belt development.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
101
• The regular environment monitoring is done through established laboratory and the same
practice will be continued.
9.4.2 AIR ENVIRONMENT :
• Handling of soils and construction materials will be carefully managed to
minimize the risk of wind-blown material and dust.
• For suppression of dust during required construction activities, water will be sprinkled at
regular interval.
• For proposed project, all transferring and feeding areas will be well covered to avoid any
fugitive emissions.
• The recovery of solvent is done through effective working of solvent recovery
system to maintain work area air quality. And for the proposed expansion , same
practice will be continued.
• For the process area of proposed expansion manufacturing capacity, proper
ventilation will be provided on the shop floor for proper air circulation to
maintain the work area air quality.
• Proper preventive maintenance of fuel firing system will be ensured.
• Air - fuel ratio will be optimized.
• Efficient working of proposed APC system will be ensured.
• It will be ensured that the vehicles to be deployed at the site should have PUC certification.
9.4.3 LAND / SOIL QUALITY:
• The segregation and storage solid waste generated will be done the proposed project.
• Regular record keeping of volumes / weights of wastes generated and disposed will be
maintained for the proposed project.
• Proper storage, handling and disposal of all type of hazardous solid wastes as per the
guidelines prescribed will be ensured.
• There will be no disposal of untreated water on land for the proposed
manufacturing activity.
• Any spillage of hazardous chemicals on land area of plant premises should be avoided.
9.4.4 NOISE ENVIRONMENT :
• High noise generating machines and processes required for proposed project will be
enclosed and insulated.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
102
• Insulation of ventilation pipes and use of dampers will be made at all possible places.
• Implementation of management control on site for limiting transportation timing by
adopting mechanical and technological ideas.
• Preventive maintenance schedule will be followed for all instruments and
machineries to maintain good working condition.
• Enclosures and barriers will be provided to pumps and machineries producing high noise
levels, required for proposed project.
• There will be periodical noise level measurements for verifying compliance with relevant
laws.
• Workers exposed to high noise generating operations will be provided with suitable ear
protection devices.
• Green belt development will act as a medium for noise absorbance.
9.4.5 OCCUPATIONAL HEALTH & SAFETY:
• All reasonably practical measures will be adopted by the unit to minimize the risk of
accidents within a chemical manufacturing unit.
• All building plans and installations will be as per relevant laws and will be approved by
competent authority.
• Trained workers will be employed for all the hazardous process operations within the plant
and will be supervised by experienced supervisors.
• Safety features such as fire extinguishers at strategic locations and suitable personal
protective equipments will be provided.
• Flame-proof electrical fittings, flame arrestors etc., will be installed.
• All the raw materials & solvents will be stored in designated storage area equipped with
necessary safety features.
• Periodic inspection & testing of pressure vessels, equipments, machineries will be done.
• Good house-keeping will be ensured within the factory premises.
• Training will be provided to the designated staff & workers for fire fighting
work permit system, first aid & safe handling of hazardous chemicals.
• Incident / accident reporting system will be developed and all the employees
will be made aware for the same.
• Suitable notices/ boards will be displayed at designated locations indicating appropriate hazard
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
103
warnings.
• Antidotes as well as MSDS for all the chemicals will be made available within
the factory premises
9.5 COST PROVISION FOR ENVIRONMENTAL MEASURES
For environment protection and management, pollution control and treatment and monitoring
systems, appropriate budgetary provision would be made and provision for recurring expenditure for
environment management of the project would be made. The details of budget allocation during
construction phase and functional phase are given in Table-5.2.
Table 9.1 Budget Allocation for Environmental Management
Sr. No. Description Cost (Rs. in
Lakhs/Annum)
Construction Phase
1 ETP(Construction) 3.50
2 Air Pollution Control Measures 1.20
3 Rain Water Harvesting 0.50
4 Tree Plantation and gardening 0.50
Total 5.70
Operational Phase
1 ETP (O & M) 1.00
2 Solid Waste Management 0.40
3 Health Care & Safety 0.40
4 Environmental Monitoring 1.50
Total 3.30
Total 9.0
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
104
10. CONCLUSION
On study and evaluation of project proponent –M/s. Jeevika Spakchem’s proposal ,initiatives,
investments and steps taken in respect of safety, environment, employee & community welfare and
information provided and shown by the proponent during the preparation of this EIA, it became
evident that they are fully conscious of all statutory, social and business obligations and imperatives
on safety, environment, employee and community welfare and are committed to meet and exceed
all statutory requirements related to these aspects .
Hence, we may conclude as under:
• The proponents are committed to comply with all environmental protection rules and
regulations prescribed by Ministry of Environment and Forest, Government of India and MPCB.
• Waste water will be pre-treated in full-fledged primary treatment plant. Primarily treated water
will be sent to CETP –Butibori.
• Adequate mitigation measure shall be taken to maintain Ambient Air Quality within the
permissible limit as prescribed by National Ambient Air Quality Standards. Thermic fluid boiler is
provided with 24m height stack for flue gas emission which is adequate for air pollution control..
• The proposed project coming up in the MIDC site will have thermic fluid boiler that would work
on LDO. Hot oil system is almost noiseless. Noise generated by the processes and operations are
insignificant.
• The risk associated with the process and operations have been identified by conducting risk
assessment in terms of HAZOP and What if Scenarios and recommendations of the same will be
implemented. Moreover on Site Emergency Plan has also been prepared to tackle any
emergency that may arise.
• The project site being land locked from all sides there is no possibility of any harmful streams
entering into spots of flora & fauna and hence there is no significant impact on them.
• The proposed projects envisage socio-economic benefits due to creation of direct / indirect
employment. An additional 15 nos. of persons are likely to get employment on commissioning of
the projects. Moreover due to the project other direct and indirect businesses will get
benefited.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
105
Thus, it can be concluded on a positive note that after the implementation of the mitigation measures
and Environmental Management and Monitoring Plans enumerated above the normal operation of
M/s. Jeevika Spakchem Pvt. Ltd. will have no impact on environment and will benefit the local people
socio economically.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
106
11. DISCLOSURE OF CONSULTANTS
Environmental Consultant
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Enviro Analysts And Engineers Pvt. Ltd. is a fast-growing consultancy firm under the strong leadership
of Shri H. K. Desai. The company has successfully completed more than 120 EIA projects including
Industrial, SEZ’s, Residential & commercial. It also offered consultancy services to more than 250
satisfied clients in a short span of 20 years.
Enviro Analysts and Engineers Pvt. Ltd recognized by following authorities:
• Recognitions by Ministry of Environment and Forests, Govt. of India;
• Recognitions by State Pollution Control Boards;
• Quality Assurance Services as per ISO 9001-2008
ENVIRO Analysts and Engineers Pvt. Ltd has core group of professional, environmental engineers,
scientists and planners, dedicated and committed to. All of whom have worked on EIA/EMP studies
and are hence familiar with the requirements of the study. The key personnel deployed for the project
are listed below.
Mr. H. K. Desai, Managing Director has provided the necessary overall guidance throughout the entire
period of the consultancy assignment. Mr. Desai has more than 20 years experience in environmental
management and engineering and has been guided a number of EIA/EMP studies.
Ms. Jyoti Prabha is General Manager having vast experience in the field of environmental
engineering and management. He has vast experience in carrying out EIA studies & also designing to
commissioning of ETP for various types of industries viz., pharmaceuticals, food, steel, bulk drugs,
pesticide, coke & gas based power projects.
Dr. S.B Katoley, Sr. Technical Advisor, worked as EIA coordinator on various projects related to
construction, Pharmaceutical industries, SEZ’s, Mining, steel industries, Coastal area projects, Tourism
projects. Tendered advice on several environmental matters to the company and their clients.
Represented the company at the MoEF Expert committee meetings and State SEAC meetings for
presenting the EIA reports and successfully obtained environmental clearances to various projects.
Proposed Organic Chemicals unit for manufacturing Easters, Surfactants/Sulfosuccinates.
Defoamers/Antifoamers & Emulsifying Agents by M/s. Jeevika Spakchem Pvt. Ltd.
107
Mr. Sourabh Singh Jaiswar, Project Manager. He is M. Tech (Environmental Engineering) and provides
technical assistance. He has experience in co-coordinating studies for various projects, including
residential, commercial, SEZ, industrial (Steel, power, chemical, pharmaceuticals, sugar, distillery,
steel, textile, tannery, coke and chemical projects).
Dr. Aasidhara N. Darvekar, Nagpur, Faculty Expert for Ecology and Biodiversity, has provided
technical assistance throughout the project and co-ordinated the field activities during and the
discussions with the clients and consultants involved. She has vast experience in carrying out EIA
studies for various types of industries and residential projects.
Mr. Meheruday P. Gujar is an Environmental Engineer having adequate experience in the field of EIA
studies of Industrial, residential & commercial projects.
Mr. Varsha Solanki (Environmental Engineer) is a PG Diploma in Environment Science & Management
having adequate experience in the field of EIA studies of residential & commercial projects, industrial
& CRZ projects.
The remaining team members too have the experience of working on various aspects of EIA studies.
All have the site experience for collection of the environmental data and have prepared EIA/EMP
reports.
Compliance of ToR (Terms of References)
1.. Executive summary of the project - giving a prima facie
idea of the objectives of the proposal, use of 1 resources,
justification, etc. In addition, it should provide a
compilation of EIA report, including EMP
and the post-project monitoring plan in brief.
Executive Summary Given.
Project Description
2 Justification for selecting the proposed product and unit size. The details for the need of the
project is given in Chapter 2 of
EIA report.
3 Land requirement for the project including its break up for
various purposes, its availability and optimization.
The details about the land
requirement is given in Chapter
2 of EIA report
4 Details of proposed layout clearly demarcating various units
within the plant.
Refer Annexure –I of EIA report
5 Product spectrum (Proposed products along with production
Capacity) and processes
Details of the products along
with capacities given in Chapter
2 of EIA report
6 Complete process flow diagram describing each unit, its
processes and operations, along with material
(material balance).
Manufacturing process and
details with material balance is
given in Chapter 2 of EIA report
7 Details on raw materials, source and storage within the
premises.
Details of raw materials and its
storage is given in Chapter 2 of
EIA report
8 Details on Solvent balance, measures for solvent recovery Not Applicable
9 Details on requirement of energy and water along with its
source and authorization from the concerned department.
Details of water and energy
requirement is given in
Chapter 2 of EIA report
10 Details on water balance including quantity of effluent
Details are given in Chapter 2 of
generated, recycled & reused. Efforts to minimize effluent
discharge and to maintain quality of receiving water body.
EIA report
11 Segregation of waste stream, characterization and quality
with specific treatment
Not Applicable
12 Details of end of the pipe effluent treatment plant, inlet and
treated water quality with specific efficiency of each
treatment unit in reduction in respect of all concerned /
regulated environmental parameters.
Refer Chapter 4 of EIA report
13 Details on volatile organic compounds from the plant
operations and occupational safety and health
protection measures
VOC - Not Applicable Since this is
a new Industrial Set up.
Occupation safety and health
Protection – Refer Chapter 4 of
EIA report.
14 Details on channelized emissions and control equipment for
each of the source.
Details given in Chapter 4 of EIA
report.
15 Control technologies for combustion emissions Details given in Chapter 4 of EIA
report.
16 Details on composition, generation and utilization of waste
from the plant.
Details given in Chapter 4 of EIA
report.
17 Management plan for solid/hazardous waste including
storage, utilization and safe disposal. CPCB guidelines in
respect of specific treatment, such as solar evaporation,
incineration, etc., need to befollowed.
Domestic waste sent for
composting
There will be Hazardous Waste
Generation and sent to
CHWTSDF
18 Details of proposed source-specific pollution control schemes
and equipments to meet the national standards.
Details given in Chapter 4 of EIA
report.
19 Details regarding infrastructure facilities such as sanitation,
fuel storage, restroom, etc., to the workers during
construction and operation phase.
During operation phase fuel
storage and sanitation facility
will be provided.
20 In case of expansion of existing industries, remediation
measures adopted to restore the environmental quality if
the groundwater, soil, crop, air, etc., are affected and a
detailed compliance to the prior environmental
clearance/consent conditions.
No impact are anticipated on
groundwater, soil,crop, air.
Refer Chapter-4 of EIA report.
21 Any litigation pending against the project and /or any
direction /order passed by any Court of Law against the
project, if so, details thereof.
NO
Description of the Environment
22 The study area shall be up to a distance of 10 km from the
boundary of the proposed project site.
Location of the project site and nearest habitats with
distances from the project site to be demarcated on a topo
sheet (1: 50000 scale).
Refer Chapter-3 of EIA report.
23 Land use based on satellite imagery including location
specific sensitivities such as national parks /wildlife
sanctuary, villages, industries, etc., for the study area.
Refer Chapter-3 of EIA report.
24 Demography details of all the villages falling within the study
area.
Refer Chapter-3 of EIA report.
25 Topography details of the project area. Refer Chapter-3 of EIA report.
26 The baseline data to be collected from the study area w.r.t.
different components of environment viz.air, noise, water,
land, and biology and socio-economic.
Refer Chapter-3 of EIA report.
27 Geological features and geo-hydrological status of the study
area.
Refer Chapter-3 of EIA report.
28 Details of groundwater and surface water quality of nearby
water sources and other surface drains.
Water quality parameters may include pH*, BOD* (3 days
Refer Chapter-3 of EIA report.
at 27 oC), COD*, toxicity factor*, Nitrate*
(as N), Arsenic*, Chromium*, Hexavalent*, Total Lead*,
Cyanide as CN*, Zinc*, Mercury*, Copper*, Nickel*,
Phenolics* as C6H5OH, Sulphide, etc. (* - as applicable)
29 Details on existing ambient air quality and
expected, stack and fugitive emissions for
PM10*, PM2.5*, SO2*, NOx*, VOC*,
mercaptans*, solvents*, NH3*, chlorine*, HCl*,
HBr*, H2S*, HF*, other process-specific
pollutants*, etc., and evaluation of the
adequacy of the proposed pollution control
devices to meet standards for point sources and
to meet AAQ standards. (* - as applicable)
Refer Chapter-3 of EIA report.
30
The air quality contours may be plotted on a location
map showing the location of project site, habitation
nearby, sensitive receptors, if any and wind roses.
Refer Chapter-3 & Chapter-4 of
EIA report.
31 Details on noise levels at sensitive/commercial receptors.
Refer Chapter-3 of EIA report.
32 Site-specific micro-meteorological data including mixing
height.
Refer Chapter-3 of EIA report.
33 One season site-specific data excluding monsoon season.
Refer Chapter-3 of EIA report.
34 Proposed baseline monitoring network for the
consideration and approval of the Competent Authority.
Refer Chapter-5 of EIA report.
35 Ecological status (terrestrial and aquatic) of the study area
such as habitat type and quality, species,diversity, rarity,
fragmentation, ecological linkage, age, abundance, etc.
Refer Chapter-3 of EIA report.
36 If any incompatible land use attributes fall within the study
area, proponent shall describe the sensitivity (distance, area
and significance) and propose the additional points based
on significance for review and acceptance by the SEAC.
Proposed project is in Notified
Industrial Area.
Incompatible land use attributes include:
1. Public water supply areas from rivers/surface water
bodies, from ground water
MIDC,Butibori
2. Scenic areas/tourism areas/hill resorts Nil
3. Religious places, pilgrim centers that attract over 10 lakh
pilgrims a year
Nil
4. Protected tribal settlements (notified tribal areas where
industrial activity is not permitted)
Nil
5. Monuments of national significance, World Heritage
Sites
Nil
6. Cyclone, Tsunami prone areas (based on last 25 years); Nil
7. Airport areas Nil
8. Any other feature as specified by the State or local
government and other features as locally applicable,
including prime agricultural lands, pastures, migratory
corridors, etc.
Nil
37 If ecologically sensitive attributes fall within the study
area, proponent shall describe the sensitivity
(distance, area and significance) and propose
additional points based on significance for review and
acceptance by the SEAC. Ecological sensitive attributes
include:
Proposed project is in Notified
Industrial Area.
1. National parks Nil
2. Wild life sanctuaries Game reserve Nil
3. Tiger reserve/elephant reserve/turtle nesting ground Nil
4. Mangrove area Nil
5. Wetlands Nil
6. Reserved and protected forests
7. Any other closed/protected area under the (Wild Life
Protection) Act, 1972, any other area locally applicable
There are three Reserved Forest as
given below:
Bidsekli – 5-6 kms
Junpani- 8-9 kms
Dongargaon-5-6kms
8. Any other eco-sensitive areas Nil
38 If the location falls in Valley, specific issues connected to the
natural resources management shall be studied and
presented.
No
39 If the location falls in CRZ area: A CRZ map duly
authenticated by one of the authorized agencies
demarcating LTL, HTL, CRZ area, location of the project
and associate facilities w.r.t. CRZ, coastal features such
as mangroves, if any.
1. Provide the CRZ map in 1:10000 scale in general cases
and in 1:5000 scales for specific observations.
2. Proposed site for disposal of dredged
material and environmental quality at the point
of
disposal/impact areas.
3. Fisheries study should be done w.r.t.
Benthos and Marine organic material and
coastal
fisheries.
Not Applicable
Anticipated environmental impacts and mitigation measures :
40 Anticipated generic environmental impacts due to this project. Refer Chapter-4 of EIA report.
41 Impact prediction tools used for the appropriate assessment
of environmental impacts .
Refer Chapter-4 of EIA report.
42 While identifying the likely impacts, also include the
following for analysis of significance and required
mitigation measures:
Refer Chapter-4 of EIA report.
1. impacts due to transportation of raw
materials and end products on the
surrounding environment
Refer Chapter-4 of EIA report.
2. impacts on surface water, soil and groundwater Refer Chapter-4 of EIA report.
3. impacts due to air pollution Refer Chapter-4 of EIA report.
4. impacts due to odour pollution Refer Chapter-4 of EIA report.
5. impacts due to noise Refer Chapter-4 of EIA report.
6. impacts due to fugitive emissions including VOCs / HAPs Refer Chapter-4 of EIA report.
7. impact on health of workers due to proposed project
activities 44
Refer Chapter-4 of EIA report.
43 Proposed odour control measures Nil
44 Action plan for the greenbelt development - species, width of
plantations, planning schedule, etc., in accordance to CPCB
published guidelines.
651.42 sq. mt. will be reserved
for green cover / lawn
development in the proposed
facility.
45 In case of likely impact from the proposed project on the
surrounding reserve forests, Plan for the conservation of wild
fauna in consultation with the State Forest Department.
Project is falling under MIDC
area.
46 Mitigation measures - for source control and treatment. Refer Chapter-4 of EIA report.
47 Comparison of alternate sites considered and the
reasons for selecting the proposed site. Conformity
of the site with prescribed guidelines in terms of CRZ,
river, highways, railways, etc.
Not Applicable
48 Details on improved technologies. Refer Chapter-2 of EIA report.
49 Details on proposed recovery options.
Nil
Environmental monitoring program
50 Monitoring programme for pollution control at source. Refer Chapter-5 of EIA report.
51 Monitoring pollutants at receiving environment for the
Refer Chapter-5 of EIA report.
appropriate notified parameters - air quality, groundwater,
surface water, gas quality, etc. during operational phase of
the project.
52 Specific programme to monitor safety and health protection of
workers
Refer Chapter-5of EIA report.
53 Proposed plan to estimate and monitor fugitive emissions
including VOCs from all the sources and appropriated control
measures.
Refer Chapter-5 of EIA report
54 Stack and fugitive emissions may be monitored for SPM,
PM10, PM2.5, SO2, NOx, HC, CO, VOC and evaluation of the
adequacy of the proposed pollution control devices to meet
gaseous emissions.
Refer Chapter-5 of EIA report
55 Monitoring of carbon foot print Not Applicable
56 Appropriate monitoring network has to be designed and
proposed, to assess the possible residual impacts on VECs.
Not Applicable
57 Details of in-house monitoring capabilities and the recognized
agencies if proposed for conducting monitoring.
There is no inhouse monitoring
facility. Monitoring will be done
periodically from MoEF
recognized agencies.
Additional studies
58 Details on risk assessment and damage control during
different phases of the project and proposed safeguard
measures.
Refer Chapter-7 of EIA report
59 Details on socio-economic development activities such as
commercial property values, generation of jobs, education,
social conflicts, cultural status, accidents, etc.
Refer Chapter-6 of EIA report
60 Proposed plan to handle the socio-economic influence on the
local community. The plan should include quantitative
dimension as far as possible.
Refer Chapter-6 of EIA report
61 Details on compensation package for the people affected by
the project, considering the socio-economic status of the
area, homestead oustees, land oustees, and landless
labourers.
Not Applicable
62 Points identified in the public hearing and commitment of
the project proponent to the same. Detailed
action plan addressing the issues raised, and the details of
necessary allocation of funds.
Not Applicable
63 Details on plan for corporate social responsibility
including the villages, population
spread,SC/ST/backward communities, upgradation of
existing schools, establishing new schools with
facilities (such as laboratories, toilets, etc.), link roads,
community halls, primary health facilities, health
camps, etc.
Industry will plan for CSR in
coming years.
64 Administrative and technical organizational structure to
ensure proposed post-project monitoring programme for
approved mitigation measures.
Refer Chapter-9 of EIA report
65 EMP devised to mitigate the adverse impacts of the project
should be provided along with item-wise cost of its
implementation (capital and recurring costs).
Refer Chapter-9 of EIA report
66 Allocation of resources and responsibilities for plan
implementation
Refer Chapter-5 of EIA report
67 Details of the emergency preparedness plan and on-site and
off-site disaster management plan.
On site Emergency Plan will be
provided, once the industry get
commissioned.
EXECUTIVE SUMMARY
Executive Summary for Proposed Production of Organic Chemicals At M/s. Jeevika Spakchem Pvt.Ltd.
1
Chapter -1
PROJECT DESCRIPTION
1 .1 TYPE OF PROJECT
M/s. Jeevika Spakchem Pvt. Ltd proposes to developed an industrial unit for production of Esters ,
Surfactants, Defomers and Emulsifying agents..
1.2 LOCATION
M/s. Jeevika Spakchem proposes to set up an Organic Chemical unit at plot of K-53, MIDC Industrial
Area, Butibori, Dist. Nagpur, Maharashtra. The proposed project is located at intersection of latitude
20°56’ 32.95”N and longitude 78° 57' 39.72"E. The environmental setting around the proposed site is
given in table 1.1
Table-1.1 Environmental Setting of the Proposed Project
Sr.No. Particulars Details
1 Latitude 20° 56’ 32.95”N
2 Longitude 78° 57’ 39.72”E
3 Elevation above MSL 943 ft above Mean Sea Level
4 Climatic Conditions
Annual Maximum Temperature : 45° C
Annual Minimum Temperature : 20° C
5 Present land use at the proposed site Industrial
6 Nearest Road MIDC Road (Adjacent)
7 Nearest Highway Highway NH 7 ( 5 Km)
8 Nearest Railway Station Butibori Railway Station (7 km)
9 Nearest Bus Station Butibori Bus Station (5 km)
10 Nearest Airport Dr. Babasaheb Ambedkar International Airport (28 km)
Executive Summary for Proposed Production of Organic Chemicals At M/s. Jeevika Spakchem Pvt.Ltd.
2
1.3 LAND USE DETAILS
The proposed project is planned in an area of 1974 sq.mt. The detail of the land use is given in Table-
1.2.
Table 1.2 Details of Plot Land Use
Sr.No. Description Area (Sq. m)
1 Factory Shed Area 430.75
2 Lab Area & Reception 90.112
3 Office Area 90.112
4 Tank Platform 44.00
5 ETP 48.17
6 Road & Open Spaces 619.436
7 Green Belt Area (33% of Total area) 651.42
Total plot area 1974.00
1.4 PROJECT CONFIGURATION
The capacities of the products are given in Table No.-2.4.
Table 1.3 Details of proposed Product capacity
Sr. no. Name of Products Capacity
1 Esters 50 MT/ M
2 Surfactants / Sulphosuccinates 30 MT/M
11 Ecologically sensitive zones within 15-km
distance Nil
12 Historical/ Archaeological places Nil
13 Seismic Zone Zone –II
Executive Summary for Proposed Production of Organic Chemicals At M/s. Jeevika Spakchem Pvt.Ltd.
3
3 Defoamers / Antifoamers 50 MT/M
4 Emulsifying agents 20 MT/M
1.5 PROJECT REQUIREMENT
Table Error! No text of specified style in document..4 Brief information of the Project
S.NO Details
1 Site Plot No. K - 53, MIDC , Butibori,Nagpur, Maharshtra.
2
Capacity
Esters
Surfactants / Sulphosuccinates
Defoamers / Antifoamers
Emulsifying agents
50 MT/ M
30 MT/M
50 MT/M
20MT/M
3 Water requirement 7 KLD
4 Power Requirement 1,34,280 Kwh. / Annum
5 Fuel Requirement LDO- 90 MT/ Annum, Diesel – 3000 Lit/Annum
6 DG Set 1 DG set (25 KVA)111111111111111
7 Project Cost 93 Lakhs
8 EMP Cost 9 Lakhs/Annum
1.6 LANDSCAPING AND GREENBELT DEVELOPMENT
Adequate land will be available for open spaces and other non-building purposes. About 33% area
will be reserved for green cover/lawn development in the proposed facility. Suitable plant species of
local varieties will be planted with adequate spacing and density for their fast growth and survival.
1.7 UTILITIES
1.7.1 Water
The water requirement for the proposed project will be met from the MIDC supply. The daily water
Executive Summary for Proposed Production of Organic Chemicals At M/s. Jeevika Spakchem Pvt.Ltd.
4
requirement is about 7.0 m3/day. Details are shown in Table-1.5.
Table 1.5 Water Requirement
Sr. No. Purpose
Total
Requirement
(m3/day)
1 Domestic 1.0
2 Industrial Process 0.5
3 Industrial Cooling Tower 2.0
4 Reactors and Tool washing 1.5
5 Landscaping 2.0
TOTAL 7.0
1.7.2 POWER
The total power requirement 1,34,280 Kwh/Annum and the supply will be from MSEB.
1.7.3 FUEL REQUIREMENT
Fuel required for boiler is LDO & for DG set Diesel will be used.
Executive Summary for Proposed Production of Organic Chemicals At M/s. Jeevika Spakchem Pvt.Ltd.
5
Chapter -2
DESCRIPTION OF THE ENVIRONMENT
2.1 PRESENT ENVIRONMENTAL STATUS
Environmental setting of any place of site covers location, topography, quality of ambient air,
water, soil, noise, flora & fauna, socio- economic health components and land use patterns.
2.2 AMBIENT AIR QUALITY
Six ambient air quality stations were established and the monitoring was carried out from October 2010
to December 2010 on 24 hourly bases. The range of average values of the pollutants is as below.
Table 2.1 Monitoring Locations
Station
Code
Name of the Station Wind Diresction Distance from Project
Site (km)
Direction from
Project Site
A1 Project Site -- Centre of Site -
A2 Vadgaon Village Upwind 5.2 N
A3 Khapri (More)
Village
Downwind 6.1 SW
A4 Mandva Village Upwind 4.5 W
A5 Satgaon Village Upwind 3.8 E
A6 Butibori Village Downwind 4.5 E
Table 2.1 Ambient Air Analysis Result
Location
PM-10 (μg/m3) PM-2.5 (μg/m
3) SO2 (μg/m
3) NOx (μg/m
3)
CO
(mg/m3)
Max. Min. Avg. Max. Min. Avg. Max. Min. Avg. Max. Min. Avg. Max. Min. Avg.
A1 37.12 31.20 34.16 14.28 11.22 12.75 17.72 15.56 16.64 9.35 8.86 9.10 0.22 0.19 0.20
A2 38.55 36.23 37.39 16.78 14.31 15.54 15.11 14.34 14.72 11.76 9.22 10.49 0.49 0.40 0.44
A3 35.34 31.32 33.33 17.23 13.45 15.34 14.43 12.29 13.36 12.54 10.33 11.43 0.67 0.55 0.61
A4 29.11 28.02 28.56 19.34 15.44 17.39 15.23 13.38 14.30 9.76 7.78 8.77 0.78 0.68 0.73
A5 26.96 24.98 25.97 13.11 11.42 12.26 15.76 13.34 14.55 11.70 9.98 10.84 0.56 0.45 0.50
Executive Summary for Proposed Production of Organic Chemicals At M/s. Jeevika Spakchem Pvt.Ltd.
6
A6 34.78 32.65 33.71 16.78 13.46 15.12 17.22 14.84 16.03 10.65 8.98 9.81 0.74 0.65 0.69
2.3 MICRO-METEOROLOGICAL DATA
Meteorological data was observed by installing micro meteorological station. Wind
speed and direction, temperature, relative humidity and cloud cover were observed.
Table Error! No text of specified style in document..13 Summary of the Meteorological Data for Year
2010
Month Temperature (o
C) Relative
Humidity (%)
Monthly
Rainfall
(mm) Max Min Average
January 29 13 54 16
February 32 16 43 2
March 36 20 30 25
April 40 23 24 20
May 43 28 27 10
June 37 26 55 174
July 32 24 77 352
August 31 24 80 278
September 32 23 74 186
October 33 20 61 61
November 31 16 55 9
December 29 13 56 2
2.4 NOISE LEVEL
Executive Summary for Proposed Production of Organic Chemicals At M/s. Jeevika Spakchem Pvt.Ltd.
7
Noise levels were observed at six monitoring sites from October 2010 to December 2010 . The
minimum recorded level during this period was 49.0 dB (night time) and the maximum 58.3 dB (day time).
2.5 WATER QUALITY
Ground Water Quality: Ground Water Monitoring was done at five locations.
• Ground water quality: pH was 7.53-7.83. Total hardness was 310-720 mg/l, and TDS was found
388.7-821.4 mg/L.
• Ground water Alkalinity was 180-444 mg/L , sulphate and magnesium as like, 55.4 - 265 mg/L, and
31.78-105 mg/L.
2.6 FLORA AND FAUNA
An ecological survey was conducted in and around a proposed site at MIDC Butibori. The study area
was a 10 km radius around the proposed site. The general topography of the area is gradually
undulating to flat. Most of the area were bare or with very scanty vegetation. There are three
Reserve Forest coming in the study area. Bid Sukali RF, Junapani RF and Angoli RF. Most of the area
were bare or with very scanty vegetation. The Reserve Forests occurring in this area are dry
deciduous forest. Most of the Reserved Forests are mostly invaded by Acacia catechu and open
places. The ecological studies were conducted to understand terrestrial ecosystems around the
proposed site
2.6.1 Flora
The survey has resulted in documenting 112 plant species. The list of the plants is given in theEIA
report. The land use in the area is agriculture with crop like Wheat (Triticum aestivum),Cotton
(Gossypium hirsutm). The farms are interspersed with human habitation, i.e. villages. The vegetation
in the surrounding was natural.
2.6.2 Fauna
The records for the birds, mammals and other faunal groups were made at the same site where
vegetation sampling was carried out. Most of the records of the mammalian and reptilian fauna are
opportunistic, nonetheless very useful to understand habitat specificity and interrelationship
between certain floral and faunal elements and also between certain geological and faunal features.
Executive Summary for Proposed Production of Organic Chemicals At M/s. Jeevika Spakchem Pvt.Ltd.
8
2.7 DEMOGRAPHY AND SOCIO - ECONOMIC PROFILE
The significant observations are as follows:
The total population of the villages surveyed is 66257
The ratio of Female/Male is 877/1000 for the villages surveyed as compared to the national average
of 933/1000 which is very low.
Literacy level among the respondent is satisfactory as the educational facilities are adequate in the
villages surveyed. The literacy rate is 65%.
The percentage of scheduled caste (SC) and scheduled tribe (ST) population is 13.9% and 16.91%
respectively in the study area.
The employment rate is 34.67% & marginal workers are 10.%.
Chapter - 3.
IMPACTS & MITIGATION MEASURES
Executive Summary for Proposed Production of Organic Chemicals At M/s. Jeevika Spakchem Pvt.Ltd.
9
Prediction of impacts is the most important component in the Environment Impact Assessment
process. Prediction of impact is carried out based on waste / emission generation from the
proposed bulk drug manufacturing plant and baseline data collected
3.1 SOURCE OF POLLUTION & CONTROL MEASURES
3.1.1 Wastewater Generation & Mitigation Measures
Domestic wastewater will be generated from the proposed Project. The wastewater generated from
the Project is estimated to be given below with treatment scheme.
Table-3.1 Wastewater Generation & Mitigation measures
Domestic wastewater:
Domestic effluent will be treated in the Septic Tank & Soak pit. The overflow from the septic tank will
be used for gardening.
Sr.No. Source
Total
m3/ day
Losses
m3/day
Effluent
Generation
m3/ day
Mitigation
1 Domestic 1
0.25
(human
consumption)
0.75 To Septic Tanks followed by Soak Pits.
Overflow will be used for gardening
2 Industrial
i
Industrial
cooling &
boiler Feed
2
2
(Evaporation)
- -
iii
Processing
Non-
Biodegradable
(Chemical
Reaction outlet
& Reactor)
2
(Evaporation)
2 To ETP for primary treatment & sent to
CETP, Butibori
iv Tree plantation
and Gardening2 2 - -
Executive Summary for Proposed Production of Organic Chemicals At M/s. Jeevika Spakchem Pvt.Ltd.
10
Industrial Wastewater:
Total industrial effluent generation due to existing & proposed facility is 2 m3/day. This industrial
effluent will be treated in proposed ETP (3 KLD) on the project site and then sent to CETP, Butibori.
3.1.2 Solid Waste Generation & Mitigation Measures
Table-3.1 Solid Waste Generation & Mitigation Measures
SSrr..NN
oo.. SSoouurrccee AAnnttiicciippaatteedd
QQuuaannttiittyy MMTT//MM
MMiittiiggaattiivvee MMeeaassuurreess
Biodegradable
1 Domestic Waste 0.093 Composting
2 Gardening Waste 0.075 Composting
Hazardous Waste
1 Sludge (after primary
treatment) 0.6 Sent to CHWTSDF,
Butibori Non Biodegradable
1 Discarded
containers/barrels/lin
ers
1.0 Sold to authorized
parties
3.1.3 Air Pollution & Control Measures
Major air pollution source will be due to stack emissions within the project site. There will be only
one stack provided i.e. for boilers. The fuel used in boiler is LDO. Whereas for the DG set Dieselis
been used. The major pollutant from stack emissions are expected to be Particulates, NOx, CO, Sox.
3.1.4 Noise Pollution & Control Measures
During the operation, major sources of noise pollution are expected to be from machinery.
The machinery and techniques used for manufacturing process would be such that there is no
nuisance of noise in the surrounding region.
Executive Summary for Proposed Production of Organic Chemicals At M/s. Jeevika Spakchem Pvt.Ltd.
11
The D.G. Sets will be only used in case of emergency. Proper acoustic enclosures will be provided for
avoiding any noise problem.
The expected noise level from proposed project would be much less than the statutory requirement,
i.e. less than 75 dB (A) during day time and less than 70 dB (A) during night time.
Executive Summary for Proposed Production of Organic Chemicals At M/s. Jeevika Spakchem Pvt.Ltd.
12
Chapter- 4
ENVIRONMENTAL MONITORING PROGRAMME
4.1 ENVIRONMENTAL MONITORING
The Post Project Monitoring to be carried out at the project is discussed below:
Table 4.1 Environmental Monitoring Schedule
Sr.No. Particulars Frequency of
Monitoring
Duration of
Monitoring
Parameters for Monitoring
1. Air Quality
Ambient Air Quality
within the plant
premises
Monthly One 24 hourly
sample
PM10, SOx, NOx,PM2.5, CO
Continuous monitoring of fugitive
emissions in work
area will be provided.
Stack Monitoring Monthly PM,SOX,NOX,CO
2a. Water & Waste Water Quality
Raw water quality
within plant
premises
Once in three
months
Grab As per CPCB MoEF specification
2b. Waste water Quality
Quality of raw
effluent
Daily Primary parameters such as
PH,COD,BOD,TDS,SS,Temp,Colour
Quality of treated
effluent
3. Soil Quality
Within plant
premises at 1
Once in a year Composite
Sample
Physical and chemical parameters.
Executive Summary for Proposed Production of Organic Chemicals At M/s. Jeevika Spakchem Pvt.Ltd.
13
location
4. Noise Quality
Within plant
premises at
identified locations
Once in three
months
8 hourly Leq levels
At the periphery of
plant premises at
least 5 locations
8 hourly Day and Night time Leq levels
5. Work Zone
monitoring
Once in three
months
8 hourly SPM
6. Solid waste
generation
Records of quantity of generation, handling, storage and
transportation of solid waste will be maintained.
7. Employee Health Pre –employment and periodic health check-up of employees at least
once in six months.
Executive Summary for Proposed Production of Organic Chemicals At M/s. Jeevika Spakchem Pvt.Ltd.
14
Chapter-5
ADDITIONAL STUDIES
5.1.1 RISK ASSESSMENT & MANAGEMENT
Risk Assessment study covers the following:
• Hazard Identification
• Hazard Unit Identification
• Causes of Risks/Hazards
• Recommendations on the minimization of the worst accident possibilities
Risk Management
This accident scenario has considerable damage potential. In such scenario the
following steps should be taken:
• Determine the extent of damage; and
• Undertake all the emergency actions i. e. evacuate the area in vicinity, take all necessary
actions to avoid escalation of the accident
• Detect the source of leakage/Fire Accident Involving HSD
• If possible, try to collect the leaking oil in a suitable container
• Use fire extinguishers to diminish the fire
• In case of fire, ensure suffocation and toxicity due to flame does not take place
• Call fire brigade & police for assistance
5.1.2 OCCUPATIONAL HEALTH MANAGEMENT
Health and Safety Measures for the Workers
a. Buildings and structures: No walls, Chimneys, Galleries, Stairways, Floor, Platform, Staging
or structure whether of a permanent or temporary character shall be constructed in such manner as to
cause risk or bodily injury.
Executive Summary for Proposed Production of Organic Chemicals At M/s. Jeevika Spakchem Pvt.Ltd.
15
b. Provision of crawling boards etc: No person shall be required to stand to pass over or work on
or near by any roof of ceiling cover with fragile material through which he is liable to fall, in case it
breaks or gives away the distance for more than 3 meters without use of sufficient number of
suitable ladders, duck ladders or crawling boards which are securely support.
c. Service platforms: Whenever practicable and demanded service platforms and gangways
will be provided for overhead shafting, and where required by him these will be securely
fence with guardrails and toe boards.
d. Belts, etc: All belts will be regularly examined to injure that the joints are safe and the
belts are proper tension.
e. Helmets: Helmets will be provided to the workers for safe guarding themselves against
any head injuries.
f. Machinery: No machineries are equipments will be situated, operated or maintained
in such a manner as to cause risk of bodily injury.
g. Methods of work: No process of work will be carried out in such a manner as to cause risk
of bodily injury.
h. Electricity: No electricity installation shall be provided during construction so as to be
dangers to human life or safety.
i. Medical Check-up: Medical examination for every employee shall be examined by certified
surgeon at least once in 3 months of a calendar.
Safety of Personnel
All workmen employed in working conditions will be provided with adequate
personal safety equipments as applicable to the work like:
• Safety Shoes
• Industrial Helmets
• Hand gloves
• Ear Muffs
• Welder’s screen
• Aprons
• Gas masks
Executive Summary for Proposed Production of Organic Chemicals At M/s. Jeevika Spakchem Pvt.Ltd.
16
• Respirators
• Safety Belts
• Goggles
Executive Summary for Proposed Production of Organic Chemicals At M/s. Jeevika Spakchem Pvt.Ltd.
17
Chapter -6
PROJECT BENEFITS
Project will create direct & indirect employment opportunities within the surrounding region. Unit
will use good faith efforts to employ local people from the nearby villages depending upon the
availability of skilled & un-skilled man-power surrounding the project site.
In operation phase, the proposed project would require significant workforce of non-technical and
technical persons. Migration of highly education and skilled experience will result in increase of
literacy in the surrounding villages.
In addition, the proposed project shall enhance the prospects of employment.
Executive Summary for Proposed Production of Organic Chemicals At M/s. Jeevika Spakchem Pvt.Ltd.
18
Chapter -7
ENVIRONMENTAL MANAGEMENT PLAN
Preparation of Environmental Management Plan is a must to fulfill bifocal aspect of the statutory
compliance as well as that of social concern.
7.1 AIR ENVIRONMENT MANAGEMENT
• Handling of soils and construction materials will be carefully managed to
minimize the risk of wind-blown material and dust.
• For suppression of dust during required construction activities, water will be sprinkled at
regular interval.
• For proposed project, all transferring and feeding areas will be well covered to avoid any
fugitive emissions.
• The recovery of solvent is done through effective working of solvent recovery system
to maintain work area air quality. And for the proposed expansion , same practice will be
continued.
• For the process area of proposed expansion manufacturing capacity, proper
ventilation will be provided on the shop floor for proper air circulation to
maintain the work area air quality.
• Proper preventive maintenance of fuel firing system will be ensured.
• Air - fuel ratio will be optimized.
• Efficient working of proposed APC system will be ensured.
• It will be ensured that the vehicles to be deployed at the site should have PUC certification.
7.2 WATER ENVIRONMENT
• Optimum use of water will be done for construction activities required for proposed
expansion.
• Any wastages/leakages will be avoided at all possible locations / opportunities.
• Proper handling of spillages if any will be ensured by introducing spill control procedures for
various chemicals.
• Water usage will be carefully monitored and re-use shall be maximized to the extent possible.
Executive Summary for Proposed Production of Organic Chemicals At M/s. Jeevika Spakchem Pvt.Ltd.
19
• Proper facilities for storage of raw materials (i.e. with roof and pucca floor) will be provided to
prevent storm water contamination during the storage of various raw materials.
• Monitored data will be analyzed and reviewed at regular intervals and compared with the
operating standards so as to take necessary corrective actions.
Enough care is taken to prevent any leakages / accidental spillages from ETP units in order to
avoid any ground water resource contamination. And the same practice will be continued for
the proposed expansion.
• Generated domestic waste water will be treated and reused for green belt development.
• The regular environment monitoring is done through established laboratory and the same practice
will be continued.
7.3 SOLID WASTE
• Biodegradable waste will be sent for composting
• Non Biodegradable waste will be sold to dealers
7.4 AESTHETIC (NOISE & ODOUR) ENVIRONMENT
The Project will generate noise from various locations like –Plant & machinery, DG sets.
• Steam traps and leaking points
• Scrubbers and chilled water condensers to the vents of process reactors wherever necessary
It may be noted that the project will have the following facilities, which will reduce the overall
impact of noise/odour pollution –
• Use of better acoustic systems to minimize noise generated by the equipments and regular
maintenance of equipments to minimize noise pollution
• Monitor the ambient noise level and work zone noise level to ensure conformance to the
stipulated norms.
7.5.1 BIOLOGICAL ENVIRONMENT
• Special attention is planned to maintain green belt in and around the Amenities premises.
• Adequate provisions are made to facilitate daily watering of all plants and lawns.
Special attention provided during summer to ensure that the green belt does not
Executive Summary for Proposed Production of Organic Chemicals At M/s. Jeevika Spakchem Pvt.Ltd.
20
suffer from water shortage.
• Development & maintenance of green belt to be considered as a priority issue.
• Return water collection, treatment and reuse under watch.
7.5.2 SOCIO-ECONOMIC ENVIRONMENT
• The operators and workers are trained in various aspects of ESH.
• The managers and officers involved in Environment Management Cell shall undergo
refresher workshop and up gradation of information on various environmental issues.
• The industrial authority shall help in promoting the activities related to environmental
awareness in nearby villages and visitors.
• The industrial authority shall help in promoting local people for livelihood commensurate
with their will, skill and abilities
• Health Statistics will be assembled, compiled and displayed.
• Environmental status will be displayed.
Form-I
M/s JEEVIKA SPAKCHEM PVT. LTD.
1
FORM 1
(I) Basic Information
# Item Details
1. Name of the Project M/s. Jeevika SpakChem Pvt .Ltd.
2. S. No. in the schedule 5(f)
3. Proposed capacity/area/length/tonnage to be
handled/command area/lease area/number of wells to
be drilled.
Sr no Name of Products Capacity
1 Esters 50 MT/ M
2 Surfactants / Sulphosuccinates 30 MT/M
3 Defoamers / Antifoamers 50 MT/M
4 Emulsifying agents 20 MT/M
4. New/Expansion/Modernization New project
5. Existing Capacity/Area etc. Nil
6. Category of Project i.e., ‘A’ or ‘B’ B
7. Does it attract general condition? If yes, please specify. Yes as per EIA notification 2000
8. Does it attract specific condition? If Yes, please specify. No
9. Location MIDC Industrial Area, Butibori. Dist- Nagpur
(M.S)
Plot/Survey/Khasra No. Plot No.K- 53
Village Tembhari
Tehsil Hingna
District Nagpur
State Maharsahtra
10. Nearest Railway Station/Airport along with distance in
kms.
Butibori Railway Station- 5 km
B.A.I. Airport, Nagpur- 20 km
11. Nearest Town, City, District Headquarters along with
distance in kms.
Nagpur – 35 kms
12. Village Panchayats, Zilla Parishad, Municipal Corporation,
Local body (complete postal addresses with telephone
nos. to be given)
Village- Tembhari
Pachayat – Tembhari
Zilla Parishad- Nagpur
Municipal Corporation – Nil
13. Name of Applicant M/s Jeevika Spakchem Pvt.Ltd
14. Registered Address 311,312-A Wing, Lokmat Bhawan,
Wardha Road, Nagpur (M.S)
15. Address for correspondence: 311,312-A Wing, Lokmat Bhawan,
Wardha Road, Nagpur (M.S)
Name Shri Ghanshyamdas Kothari
Designation (Owner/Partner/CEO) Managing Director
Address 311,312-A Wing, Lokmat Bhawan,
Wardha Road, Nagpur (M.S)
Pin Code 440010
E – mail gdk_ [email protected]
Telephone No. 0712-2421996/+91-9823078281
Fax. No. 0712-2432996
16. Details of Alternate Sites examined, if any. Location of
these sites should be shown on a topo sheet
_
17. Interlinked Projects NO.
Form-I
M/s JEEVIKA SPAKCHEM PVT. LTD.
2
18. Whether separate application of interlinked project has
been submitted?
NO.
19. If yes, date of submission N.A.
20. If no, reason N.A.
21. Whether the proposal involves approval/clearance
under: if yes, details of the same and their status to be
given.
(a) The Forest (Conservation) Act, 1980?
(b) The Wildlife (Protection) Act, 1972?
(c) The C.R.Z. Notification, 1991?
N.A.
N.A.
N.A.
22. Whether there is any Government Order/Policy
relevant/relating to the site?
NO.
23. Forest Land involved (hectares) NO
24. Whether there is any litigation pending against the
product and/or land in which the project is propose to
set up?
(a) Name of the Court
(b) Case. No.
(c) Orders/Directions of the court, if any and its
relevance with the proposed project.
NO
(II) Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause
physical changes in the locality (topography, land use, changes in water bodies, etc.)
Sr.
No. Information/Checklist Confirmation
Yes/
No
Details thereof (with approximate
quantities/ rates, wherever possible) with
source of information data
1.1
Permanent or temporary change in land use,
land cover or topography including increase in
intensity of land use (with respect to local land
use plan)
No
Proposed Unit will be established in
Notified Industrial Area.
1.2 Clearance of existing land, vegetation and
building? No
There will be no clearance of existing land,
vegetation or building.
1.3 Creation of new land uses:
No --
1.4 Pre-construction investigations e.g. bore holes,
soil testing? No
--
1.5 Construction works ? Yes --
1.6 Demolition Works ? No --
1.7 Temporary sites used for construction works or
housing of construction workers?
No
--
1.8
Above ground buildings, structures or
earthworks including linear structures, cut and
fill or excavations
Yes
Building with 282.20 Sq. M. area to be
constructed
1.9 Underground works including mining or
tunneling? No --
1.10 Reclamation works? No --
1.11 Dredging? No --
1.12 Offshore structures? No --
1.13 Production and manufacturing Process? Yes Production of organic chemicals
manufacturing process involved mainly
Form-I
M/s JEEVIKA SPAKCHEM PVT. LTD.
3
Sr.
No. Information/Checklist Confirmation
Yes/
No
Details thereof (with approximate
quantities/ rates, wherever possible) with
source of information data
mixing. Details are given in EIA report
enclosed
1.14
Facilities for storage of goods or materials?
Yes
Liquid raw material/Finished goods will be
stored in tanks whereas solid raw materials
will be stored in stores to be constructed
and having area of 50 Sq.mt.
1.15 Facilities for treatment or disposal of solid
waste or liquid effluents? Yes
Effluent treatment plant of capacity 3 KLD
for giving primary treatment wis proposed.
The treated effluent will be sent to
CETP,Butibori.
1.16 Facilities for long term housing of operational
workers? No
--
1.17 New road, rail or sea traffic during construction
of operation? No
--
1.18
New road, rail, air waterborne or other
transport infrastructure including new or
altered routes and stations, ports, airports etc.?
No --
1.19
Closure or diversion of existing transport routes
or infrastructure leading to changes in traffic
movements?
No
--
1.20 New or diverted transmission lines or
pipelines? No --
1.21
Impoundment, damming, culverting,
realignment or other changes to the hydrology
of watercourses or aquifers?
No --
1.22 Stream crossings? No --
1.23 Abstraction or transfers of water from ground
or surface waters? Yes
--
1.24 Changes in water bodies or the land surface
affecting drainage or run-off No
--
1.25 Transport of personnel or materials for
construction, operation or decommissioning? Yes
Transportation will be done using roadways
which will be very low.
1.26 Long-term dismantling or decommissioning
/restoration works? No --
1.27 Ongoing activity during decommissioning which
could have an impact on the environment? No
--
1.28 Influx of people to an area in either temporarily
or permanently? No
--
1.29 Introduction of alien species? No --
1.30 Loss of native species or genetic diversity? No --
1.31 Any other actions? No --
2.0 Use of Natural resources for construction or operation of Project (such as land, water, materials or
energy, especially any resources which are non-renewable or in short supply).
Sr.
No. Information/Checklist Confirmation
Yes/
No
Details thereof (with approximate
quantities/ rates, wherever possible) with
source of information data
Form-I
M/s JEEVIKA SPAKCHEM PVT. LTD.
4
2.1 Land specially undeveloped or agricultural
land (ha) No
It is and industrial land given on long
(95 years) lease by MIDC
2.2 Water (expected source & competing
users) unit KLD Yes
MIDC water supply is available Expected
consumption – 7.0 KLD.
2.3 Minerals (MT) No --
2.4
Construction material – stone, aggregates
and soil(expected source-MT) Yes
Stone and aggregates- 300MT being purchase
by building contractor for construction of
building from building material suppliers.
2.5 Forests and timber (source-MT) No --
2.6 Energy including electricity and fuels
(source, competing users) Unit: fuel (MT),
energy (MW) Yes
Requirement of electricity is low. Electricity –
50 HP
Fuel
LDO – 90 MT/Annum
Diesel – 3000 Lit/Annum
2.7 Any other natural resources (use
appropriate standard units) No --
3.0 Use, storage, transport, handling or production of substances or materials, which could be
harmful to human health or the environment or raise concerns about actual or perceived risks to
human health.
Sr.
No. Information/Checklist Confirmation
Yes/N
o
Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
3.1 Use of substances or materials, which are
hazardous (as per rules) to human health or
the environment (flora, fauna, and water
supplies)
Yes
Methanol will be used.
3.2 Changes in occurrence of disease or affect
disease vectors (e.g. insect or water borne
diseases)
No --
3.3
Affect the welfare of people e.g. by changing
living conditions? Yes
Positive Impact
Employment opportunities will be
generated.
3.4
Vulnerable groups of people who could be
affected by the project e.g. hospital patients,
children, the elderly etc.,
No --
3.5 Any other causes No --
4.0 Production of solid wastes during construction or operation or decommissioning (MT/M)
Sr. No. Information/Checklist Confirmation Yes/
No
Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
4.1 Spoil, overburden or mine wastes No --
4.2
Municipal waste (domestic and or
commercial wastes) Yes
Domestic Waste – 0.093 MT/M
Garden Waste- 0.075 MT/M
Biodegradable waste will be sent for composting.
4.3 Hazardous wastes (as per hazardous
waste management rules) Yes
Yes Hazardous Waste will be generated, 0.6 MT/
M , sent to CHWTSDF
4.4 Other industrial process wastes No --
Form-I
M/s JEEVIKA SPAKCHEM PVT. LTD.
5
4.5 Surplus product No --
4.6 Sewage sludge or other sludge from
effluent treatment No
--
4.7 Construction or demolition wastes Yes --
4.8 Redundant machinery or equipment No --
4.9 Contaminated soils or other materials No --
4.10 Agricultural wastes No --
4.11 Other solid wastes No --
5.0 Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr)
Sr.
No. Information/Checklist Confirmation Yes/No
Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
5.1
Emissions from combustion of fossil
fuels from stationary or mobile sources Yes
Fuel gas will come out from Thermic
fluid heater where LDO will be used as
fuel. Stack will be provided.
5.2 Emission from production processes Yes Scrubber will be provided
5.3 Emissions from materials handling
including storage or transport Yes
Very Minimal Impact Envisaged
5.4 Emissions from construction activities
including plant and equipment
Yes Very Minimal Impact Envisaged
5.5
Dust or odors from handling of materials
including construction materials, sewage
and waste
Yes Very Minimal Impact Envisaged
5.6 Emissions from incineration of waste No --
5.7
Emissions from burning of waste in open
air (e.g. slash materials, construction
debris)
No --
5.8 Emissions from any other sources No --
6.0 Generation of Noise and vibration, and emissions of Light and heat
Sr.
No. Information/Checklist Confirmation Yes/No
Details thereof (with approximate
quantities/ rates, wherever possible) with
source of information data
6.1
From operation of equipment e.g.
engines, ventilation plant, crushers
Yes
The noise will be generated from machinery
& DG sets. Sturdy foundations for all the
machineries will be provided. DG sets shall
confirm standards prescribed under
Environment Protection Act & shall have
the acoustic enclosures.
6.2 From industrial or similar processes Yes Process takes place under closed system, so
noise pollution will be controlled.
6.3
From construction or demolition Yes Adequate measures taken to keep noise
and vibrations under control during
construction. Demolition works are not
carried out.
6.4 From blasting or piling No --
Form-I
M/s JEEVIKA SPAKCHEM PVT. LTD.
6
6.5 From construction or operational traffic Yes
The noise levels will be <75 dB (A) and
these will be fleeting noise sources.
Workers will be provided with protective
equipment such as earmuffs, earplugs etc.
6.6 From lighting or cooling systems
Yes Adequate measures taken to keep noise
and vibrations under control.
6.7 From any other sources No --
7.0 Risks of contamination of land or water from releases of pollutants into the ground or into sewers,
surface waters, groundwater, coastal wasters or the sea.
Sr.
No. Information/Checklist Confirmation Yes/No
Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
7.1 From handling, storage, use or spillage of
hazardous materials Yes
Adequate measures will be taken as per
MSIHC handling rules.
7.2 From discharge of sewage or other effluents to
water or the land (expected mode and place of
discharge)
Yes
The wastewater will be given primary
treatment and then sent to CETP
Butibori. Whereas domestic sewage will
be treated in septic tanks and soak pit
and its overflow is used for gardening.
7.3 By deposition of pollutants emitted to air into
the land or into water
No --
7.4 From any other sources No --
7.5 Is there a risk of long term build up of
pollutants in the environment from these
sources?
No --
8.0 Risk of accidents during construction or operation of the project, which could affect human health or
the environment
Sr.
No. Information/Checklist Confirmation
Yes/No Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
8.1 From explosions, spillages, fires etc from
storage, handling, use or production of
hazardous substances
Yes On Site Emergency Plan will be provided.
8.2 From any other causes No --
8.3
Could the project be affected by natural
disasters causing environmental damage
(e.g. floods, earthquakes, landslides, cloud
burst etc)?
No --
9.0 Factors which should be considered (such as consequential development) which could lead to
environmental effects or the potential for cumulative impacts with other existing or planned activities in
the locality
Sr.
No. Information/Checklist Confirmation Yes/No
Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
9.1 Lead to development of supporting, facilities,
Form-I
M/s JEEVIKA SPAKCHEM PVT. LTD.
7
Sr.
No. Information/Checklist Confirmation Yes/No
Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
ancillary development or development
stimulated by the project which could have
impact on the environment e.g.:
Supporting infrastructure (roads, power supply,
waste or waste water treatment, etc)
Housing development
Extractive industries
Supply industries
Other
No
Not Envisaged
9.2
Lead to after use of the site, which could have an
impact on the environment No
There will be minor effect on the air
quality as all the precautions will be
taken to maintain healthy environment.
9.3 Set a precedent for later developments
Yes GMP (Good manufacturing Process) will
be adopted.
9.4 Have cumulative effects due to proximity to
other existing or planned projects with similar
effects
No --
(III) Environmental Sensitivity
Sr.
No. Areas
Name/
Identity
Aerial distance (with 15-km)
Proposed project location
boundary
1
Areas protected under international conventions,
national or local legislation for their ecological,
landscape, cultural or other related value
No --
2
Areas which are important or sensitive of ecological
reasons – wetlands, water courses or other water bodies,
coastal zone, biospheres, mountains, forests
No --
3
Areas used by protected, important or sensitive species
of flora or fauna for breeding, nesting, foraging, resting,
over wintering, migration
No --
4 Inland, coastal, marine or underground waters No --
5 State, national boundaries No --
6 Routes or facilities used by the public for access to
recreation or other tourist, pilgrim areas No --
7 Defense installations No --
8
Densely populated or built-up area
Yes
MIDC, Butibori
9
Areas occupied by sensitive man made land uses
(hospitals, schools, places of worship, community
facilities)
No
-
10
Areas containing important, high quality or scarce
resources (ground water resource, surface resources,
forestry, agriculture, fisheries, tourism, minerals)
No -
11 Areas already subjected to pollution or environmental No This is not listed under
Form-I
M/s JEEVIKA SPAKCHEM PVT. LTD.
8
Sr.
No. Areas
Name/
Identity
Aerial distance (with 15-km)
Proposed project location
boundary
damage. (those where existing legal environmental
standards are exceeded)
critically polluted area. The
baseline environmental
conditions are within the
permissible limits.
12
Areas susceptible to natural hazard which could cause
the project to present environmental problems
(earthquakes, subsidence, landslides, erosion, flooding or
extreme or adverse climatic conditions) No
The project falls under seismic
zone-II as per IS1893 (Part-
1):2002. Further it is not flood
prone or landslide prone areas.
Hence, no risk due to natural
hazards is envisaged.
“I hereby given undertaking that the data and information given in the application and enclosures are true
to the best of my knowledge and belief and I am aware that if any of the data and information submitted
is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the
project will be revoked at our risk and cost.
Date: 22/03/2011
Place: Nagpur
Signature of the Applicant
(Project Proponent/ Authorized Signatory)
ANNEXURE-I
LAYOUT PLAN
ANNEXURE-II SOCIO ECONOMIC SURVEY REPORT
Sr. No. District Name of
Taluka
Name of
village
No. of HH Total
Populatio
n
Male Female SC
1 Nagpur Nagpur RuralMohgaon 85 381 192 189 18
2 Bothali 271 1259 703 556 143
3 Waranga 165 821 429 392 68
4 Borkhedi 1076 4675 2496 2179 1150
5 Bori 1702 7593 4035 3558 815
6 Kolar 180 857 456 401 49
7 Sonurli 107 492 249 243 28
8 Rui khairi 582 2124 1278 846 248
9 Jaipur 56 272 138 134 11
10 Khapari Subhedar 73 373 190 183 0
11 Vathoda 30 117 58 59 9
12 Jangeshwar 53 278 142 136 28
13 Borkhedi 502 2273 1197 1076 410
14 Sonegaon (mahar)197 920 474 446 74
15 Kinhalmakadi 116 532 268 264 7
16 Alagondi 95 480 248 232 34
17 Bamhani 318 1382 725 657 439
18 Dudha 138 695 349 346 98
19 Mangli 86 345 171 174 96
20 Chimanzari 62 511 274 237 13
21 Hingana Lakhamapur 44 196 108 88 4
22 Kinhi 48 204 100 104 0
23 Mandawa 100 397 215 182 93
24 Bhansoli 63 386 228 158 81
25 Khadki 129 638 329 309 10
26 Khairi kh 82 399 209 190 105
27 Ghodeghat 115 536 290 246 16
28 Wadgaon 84 385 201 184 61
29 Gumgaon 1045 5153 2631 2522 274
30 Devali (Amgaon) 193 861 441 420 15
31 Pitesur 11 36 18 18 0
32 Amgaon 321 1508 771 737 399
33 Ladgaon 24 86 43 43 0
34 Dhanoli 63 298 152 146 9
35 Wagdara 542 2603 1312 1291 230
36 Kanholi 61 276 145 131 30
37 Wadgaon 201 872 454 418 58
38 Katangdhara 128 614 311 303 12
39 Pipardhara 138 657 326 331 9
40 Sukali (Gharpure) 100 527 270 257 4
41 Datala 42 191 98 93 2
42 Umred Devalipeth 14 70 40 30 24
43 Salaidabha 247 1114 581 533 38
Demographic Pattern of the Villages Surveyed
44 Pohi 53 216 115 101 12
45 Sirul 265 1172 596 576 252
46 Turkmari 1176 4687 2537 2150 1034
47 Kirmiti 271 1043 604 439 355
48 Wateghat 127 541 337 204 55
49 Tembhari 242 873 578 295 179
50 Kinhi 143 517 355 162 43
51 Sukali 100 401 211 190 31
52 Gangapur 10 52 26 26 0
53 Pipri 107 526 276 250 18
54 Devali 38 180 92 88 8
55 Takalghat 2150 8771 4723 4048 1523
56 Bid-ganeshpur 251 959 523 436 81
57 Khapri (Moreshwar)240 1065 538 527 271
58 Asola 172 867 443 424 107
Total 15034 66257 35299 30958 9181
ST Lit Main
Workers
Marginal
Workers
Non
Worker
153 256 184 12 185
433 822 163 336 760
223 350 296 122 403
457 3442 1527 97 3051
607 5288 1847 810 4936
13 581 290 115 452
59 324 192 57 243
457 1248 1032 31 1061
28 159 146 0 126
27 242 199 7 167
40 68 60 0 57
0 130 54 86 138
454 1236 419 519 1335
21 637 442 30 448
99 310 238 87 207
20 302 246 27 207
254 892 660 41 681
400 395 419 1 275
48 192 211 2 132
429 422 70 69 372
170 114 41 52 103
62 104 68 45 91
263 210 230 5 162
232 277 138 16 232
161 409 231 114 293
165 270 214 19 166
133 408 297 16 223
241 253 76 127 182
1062 3630 1683 560 2910
173 594 286 97 478
2 12 22 0 14
241 931 556 192 760
28 12 44 10 32
7 197 67 77 154
334 1832 626 455 1522
133 158 133 11 132
94 511 424 60 388
285 351 164 138 312
289 400 268 89 300
161 292 226 79 222
46 111 63 51 77
20 33 14 18 38
254 714 273 239 602
Demographic Pattern of the Villages Surveyed
83 135 112 5 99
27 772 479 69 624
380 3116 1396 426 2865
136 723 506 26 511
218 292 321 3 217
67 674 447 51 375
110 307 275 70 172
67 233 153 0 248
10 17 20 0 32
279 236 274 4 248
171 103 117 4 59
317 6011 3085 561 5125
89 600 197 222 540
272 674 463 96 506
199 524 289 216 362
11203 43536 22973 6672 36612
ANNEXURE-III
MATERIAL SAFETY DATA SHEET
Methanol
MATERIAL SAFETY DATA SHEET
This Material Safety Data Sheet complies with the Canadian Controlled ProductRegulations and the United States Occupational Safety and Health Administration (OSHA)
hazard communication standard.
1. Product and Supplier Identification
Product:
Synonyms:
Methanol (CH3OH)
Methyl alcohol, methyl hydrate, wood spirit, methylhydroxide
Non-Emergency Tel. #:
Emergency Tel. #:(CHEMTREC)
(604) 661-2600
1-800-424-9300(Canada and US)
Product Use: Solvent, fuel, feedstock
CompanyIdentification:
Methanex Corporation,1800 Waterfront Centre,200 Burrard Street,Vancouver, B.C. V6C 3M1
Note: CHEMTREC number to be used only in the event of chemical emergencies involving a spill, leak, fire, exposure or accident involving chemicals.
Importer: Methanex Methanol CompanySuite 1150 – 15301 Dallas ParkwayAddison, Texas 75001Telephone: (972) 702-0909
2. Composition
Component % (w/w) Exposure Limits* LD50 LC50
Methanol
(CAS 67-56-1)
99-100 ACGIH TLV-TWA: 200 ppm, skin STEL: 250 ppm, skin notationOSHA PEL: 200 ppm
TLV Basis, critical effects:neuropathy, vision, central nervous system
5628 mg/kg
(oral/rat)
20 ml/kg
(dermal/ rabbit)
64000 ppm
(inhalation/rat)
* Exposure limits may vary from time to time and from one jurisdiction to another. Check withlocal regulatory agency for the exposure limits in your area.
Methanex Corporation - 1 - October 13, 2005
Methanol
3. Hazards Identification
Routes of Entry:
Skin Contact: Moderate Eye Contact: Moderate Ingestion: Major Inhalation: Major
Effects of Short-Term (Acute) Exposure:
Inhalation: Inhalation of high airborne concentrations can also irriate mucous membranes, causeheadaches, sleepiness, nausea, confusion, loss of consciousness, digestive and visual disturbances and even death. NOTE: Odour threshhold of methanol is several times higher thanthe TLV-TWA. Depending upon severity of poisoning and the promptness of treatment, survivors may recover completely or may have permanent blindness, vision disturbances and/or nervoussystem effects. Concentrations in air exceeding 1000 ppm may cause irritation of the mucousmembranes.
Skin Contact: Methanol is moderately irritating to the skin. Methanol can be absorbed throughthe skin and harmful effects have been reported by this route of entry. Effects are simialr to those described in “Inhalation”
Eye Contact: Methanol is a mild to moderate eye irritant. High vapour concentration or liquid contact with eyes causes irritation, tearing and burning.
Ingestion: Swallowing even small amounts of methanol could potentially cause blindness or death. Effects of sub lethal doses may be nausea, headache, abdominal pain, vomiting and visualdisturbances ranging from blurred vision to light sensitivity.
Effects of Long-Term (Chronic) Exposure: Repeated exposure by inhalation or absorption maycause systemic poisoning, brain disorders, impaired vision and blindness. Inhalation may worsen conditions such as emphysema or bronchitis. Repeated skin contact may cause dermal irritation,dryness and cracking.
Medical Conditions Aggravated By Exposure: Emphysema or bronchitis.
4. First Aid Measures
Note: Emergency assistance may also be available from the local poison control centre.
Eye Contact: Remove contact lenses if worn. In case of contact, immediately flush eyes withplenty of clean running water for at least 15 minutes, lifting the upper and lower eyelidsoccasionally. Obtain medical attention.
Skin Contact: In case of contact, remove contaminated clothing. In a shower, wash affectedareas with soap and water for at least 15 minutes. Seek medical attention if irritation occurs orpersists. Wash clothing before reuse.
Inhalation: Remove to fresh air, restore or assist breathing if necessary. Obtain medical attention.
Ingestion: Swallowing methanol is potentially life threatening. Onset of symptoms may be delayed for 18 to 24 hours after digestion. If conscious and medical aid is not immediately
Methanex Corporation - 2 - October 13, 2005
Methanol
available, do not induce vomiting. In actual or suspected cases of ingestion, transport to medicalfacility immediately.
NOTE TO PHYSICIAN: Acute exposure to methanol, either through ingestion or breathing highairborne concentrations can result in symptoms appearing between 40 minutes and 72 hoursafter exposure. Symptoms and signs are usually limited to CNS, eyes and gastrointestinal tract.Because of the initial CNS’s effects of headache, vertigo, lethargy and confusion, there may be an impression of ethanol intoxication. Blurred vision, decreased acuity and photophobia are common complaints. Treatment with ipecac or lavage is indicated in any patient presenting withintwo hours of ingestion. A profound metabolic acidosis occurs in severe poisoning and serumbicarbonate levels are a more accurate measure of severity than serum methanol levels.Treatment protocols are available from most major hospitals and early collaboration with appropriate hospitals is recommended.
5. Fire Fighting Measures
Flash point: 11oC (TCC)
Autoignition temperature: 385oC (NFPA 1978), 470
oC (Kirk-Othmer 1981;
Ullmann 1975)Lower Explosive Limit: 6% (NFPA, 1978)Upper Explosion Limit: 36% (NFPA, 1978), 36.5% (Ullmann, 1975)Sensitivity to Impact: Low
Sensitivity to Static Discharge: Low
Hazardous Combustion Products: Toxic gases and vapours; oxides of carbon andformaldehyde.
Extinguishing Media: Small fires: Dry chemical, CO2, water spray Large fires: Water spray, AFFF(R) (Aqueous Film Forming Foam (alcoholresistant)) type with either a 3% or 6% foam proportioning system.
Fire Fighting Instructions: Methanol burns with a clean clear flame that is almost invisible in daylight. Stay upwind! Isolate and restrict area access. Concentrations of greater that 25% methanol in water can be ignited. Use fine water spray or fog to control fire spread and cooladjacent structures or containers. Contain fire control water for later disposal. Fire fighters mustwear full face, positive pressure, self-contained breathing apparatus or airline and appropriateprotective clothing. Protective fire fighting structural clothing is not effective protection frommethanol. Do not walk through spilled product.
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) HAZARD INDEX:
HEALTH: 1
FLAMMABILITY: 3
REACTIVITY: 0
6. Accidental Release Measures
Overview: Flammable liquid which can burn without a visible flame. Release can cause animmediate risk of fire and explosion. Eliminate all ignition sources, stop leak and use absorbentmaterials. If necessary, contain spill by diking. Fluorocarbon alcohol resistant foams may be applied to spill to diminish vapour and fire hazard. Maximize methanol recovery for recycling orre-use. Restrict access to area until completion of cleanup. Ensure cleanup is conducted by
Methanex Corporation - 3 - October 13, 2005
Methanol
trained personnel only. Wear adequate personal protection and remove all sources of ignition.Notify all governmental agencies as required by law.
Personal Protection: Full face, positive pressure self-contained breathing apparatus or airline,and protective clothing must be worn. Protective fire fighting structural clothing is not effective protection from methanol.
Environmental Precautions: Biodegrades easily in water Methanol in fresh or salt water mayhave serious effects on aquatic life. A study on methanol’s toxic efffects on sewage sludge bacteria reported little effect on digestion at 0.1% while 0.5% methanol retarded digestion.Methanol will be broken down to carbon dioxide and water.
Remedial Measures: Flammable liquid. Release can cause an immediate fire/explosion hazard.Eliminate all sources of ignition, stop leak and use absorbent materials. Collect liquid with explosion proof pumps. Do not walk through spill product as it may be on fire and not visible.
Large Spills: If necessary, contain spill by diking. Fluorocarbon alcohol resistant foams may beapplied to spill to diminish vapour and fire hazard. Maximize methanol recovery for recycling orreuse. Collect liquid with explosion proof pumps.
Small Spills: Soak up spill with non-combustible absorbent material. Recover methanol and dilutewith water to reduce fire hazard. Prevent spilled methanol from entering sewers, confined spaces,drains, or waterways. Restict access to unprotected personnel. Full. Put material in suitable,covered, labeled containers. Flush area with water.
7. Handling and Storage
Handling Procedures: No smoking or open flame in storage, use or handling areas. Use explosion proof electrical equipment. Ensure proper electrical grouding procedures are in place.
Storage: Store in totally enclosed equipment, designed to avoid ignition and human contact.Tanks must be grounded, vented, and should have vapour emission controls. Tanks must be diked. Avoid storage with incompatible materials. Anhydrous methanol is non-corrosive to mostmetals at ambient temperatures except for lead, nickel, monel, cast iron and high silicon iron. Coatings of copper (or copper alloys), zinc (including galvanized steel), or aluminum are unsuitable for storage. These materials may be attacked slowly by the methanol. Storage tanks of welded construction are normally satisfactory. They should be designed and built in conformancewith good engineering practice for the material being stored. While plastics can be used for short term storage, they are generally not recommended for long-term storage due to deteriorationeffects and the subsequent risk of contamination.
Corrosion rates for several construction materials:
<0.508 mm/year Cast iron, monel, lead, nickel <0.051 mm/year High silicon iron Some attack PolyethyleneSatisfactory Neoprene, phenolic resins, polyesters, natural rubber, butyl rubberResistant Polyvinyl chloride, unplasticized
8. Exposure Controls, Personal Protection
Engineering Controls: In confined areas, local and general ventilation should be provided to maintain airborne concentrations beloew permissable exposure limits. Ventilation systems must be designed according to approved engineering standards.
Methanex Corporation - 4 - October 13, 2005
Methanol
Respiratory Protection: NIOSH approved supplied air respirator when airborne concentrationsexceed exposure limits.
Skin protection: Butyl and nitrile rubbers are recommended for gloves. Check with manufacturer. Wear chemical resistant pants and jackets, preferably of butyl or nitrile rubber.Check with manufacturer.
Eye and Face Protection: Face shield and chemical splash goggles when transferring is taking place.
Footwear: Chemical resistant, and as specified by the workplace.
Other: Eyewash and showers should be located near work areas. NOTE: PPE must not be considered a long-term solution to exposure control. PPE usage must be accompanied by employer programs to properly select, maintain, clean, fit and use. Consult a competent industrialhygiene resource to determine hazard potential and/or the PPE manufacturers to ensure aadequate protection.
9. Physical and Chemical Properties
Appearance: Liquid, clear, colourlessOdour: Mild characteristic alcohol odourOdour Threshold: detection: 4.2 - 5960 ppm
(geometric mean) 160 ppm recognition: 53 – 8940 ppm
(geometric mean) 690 ppm
pH: Not applicableVapour Pressure: 12.8 kPa @ 20
oC
Solubility: Completely solubleVapour Density: 1.105 @ 15
oC
Freezing Point: -97.8oC
Boiling Point: 64.7 oC @ 101.3 kPa
Critical Temperature: 239.4 oC
Relative Density: 0.791 Evaporation Rate: 4.1 (n-butyl acetate =1)
Partition Coefficient: Log P (oct) = -0.82Solubility in other Liquids: Soluble in all proportions in other alcohols, esters,ketones, ethers and most other organicsolvents
10. Stability and Reactivity
Chemical Stability: Yes
Incompatibility: Yes. Avoid contact with strong oxidizers, strong mineral or organic acids,and strong bases. Contact with these materials may cause a violent or explosive reaction. May be corrosive to lead, aluminum, magnesium, and platinum.
Conditions of Reactivity: Presence of incompatible materials and ignition sources.
Hazardous Decomposition Products: Formaldehyde, carbon dioxide, and carbon monoxide.
Hazardous Polymerization: Will not occur.
Methanex Corporation - 5 - October 13, 2005
Methanol
11. Toxicological Information
LD50: 5628 mg/kg (oral/rat), 20 ml/kg (dermal/rabbit)LC50: 64000 ppm (rat) Acute Exposure: See Section 3 Chronic Exposure: See Section 3.Exposure Limits: See Section 2.Irritancy: See Section 3.Sensitization: NoCarcinogenicity: Not listed by IARC, NTP, ACGIH, or OSHA as a carcinogen.Teratogenicity: NoReproductive toxicity: Reported to cause birth defects in rats exposed to 20,000 ppm Mutagenicity: Insufficient data Synergistic products: None Known
12. Ecological Information
Environmental toxicity: Methanol in fresh or salt water may have serious effects on aquatic life.A study on methanol’s toxic effects on sewage sludge bacteria reported little effect on digestion at 0.1% while 0.5% methanol retarded digestion. Methanol will be broken down into carbon dioxideand water.
Biodegradability: Biodegrades easily in water.
13. Disposal Considerations
Review federal, provincial or state, and local government requirements prior to disposal. Storematerial for disposal as indicated in Section #7, Handling and Storage. Disposal by controlledincineration or by secure land fill may be acceptable.
14. Transport Information
Transport of Dangerous Goods (TDG and CLR): Methanol, Class 3(6.1), UN1230, P.G. II
Limited Quantity: 1 litres
United States Department of Transport (49CFR): Methanol, Class 3, UN 1230, P.G. II,(Domestic Only) (RQ 5000 lbs/2270 kg)
Limited Quantity: 1 litres
International Air Transport Association (IATA): Methanol, Class 3(6.1), UN1230, P.G. II Packaging Instruction: 305,1 litre maximum per package,
International Maritime Organization (IMO): Methanol, Class 3(6.1), UN1230, P.G. II, Flash Point = 12
oC
EmS No. F-E, S-D Stowage Category “B”, Clear of living quarters
Methanex Corporation - 6 - October 13, 2005
Methanol
15. Regulatory Information
CANADIAN FEDERAL REGULATIONS:
CEPA, DOMESTIC SUBSTANCES LIST: Listed
WHMIS CLASSIFICATION: B2, D1A
UNITED STATES REGULATIONS:
29CFR 1910.1200 (OSHA): Hazardous
40CFR 116-117 (EPA): Hazardous
40CFR 355, Appendices A and B: Subject to Emergency Planning and Notification
40CFR 372 (SARA Title III): Listed
40CFR 302 (CERCLA): Listed
16. Other Information
Preparation Date: October 13, 2005
Prepared by: Kel-Ex Agencies Ltd., P.O. Box 52201, Lynnmour RPO, North Vancouver, B.C., V7J 3V5
Disclaimer: The information above is believed to be accurate and represents the best information currently available to us. Users should make their own investigations to determinethe suitability of the information for their particular purposes. This document is intended as a guide to the appropriate precautionary handling of the material by a properly trained person usingthis product.
Methanex Corporation and its subsidiaries make no representations or warranties, either expressor implied, including without limitation any warranties of merchantability, fitness for a particularpurpose with respect to the information set forth herein or the product to which the informationrefers. Accordingly, Methanex Corp. will not be responsible for damages resulting from use of or reliance upon this information.
Revisions: None
Methanex Corporation - 7 - October 13, 2005
1
Consolidated Statement on Environmental Aspects
# Particular Commitment On
1. Name of
Project:
Proposed Organic chemical manufacturing unit at Plot No. K-53,MIDC Butibori, Dist.
Nagpur, Maharashtra.
2. New Project/
Expansion in
existing
project/ diversification
in exiting project
New Project
3. If expansion/ Diversification,
Whether environmental
clearance has been obtained
for existing
project (If yes,
enclose a copy
with
compliance
table)
N.A.
4. Name, address ,
email & contact
number of Proponent
M/s . Jeevika Spakchem Pvt. Ltd.
311,312-A Wing, Lokmat Bhavan, Wardha Road, Nagpur (MS) Email : [email protected]
5. Name & Address
contact number of
Consultant
M/s. Enviro Analysts & Engineers Pvt. 1-A, Enviro House, Hansa Complex,
Carter Road No.2, Datta Pada, Borivali (E), Mumbai- 400 006
Tel: 2854 1647 / 48 / 49, Fax: 2854 1290
Email: [email protected]
6. Accrediation of Consultant
(Nabet
Accrediation)
Provisional Accrediation by NABET
7. Type of
project:
Activity serial
Number as per
MoEF
Notification
(amended)
Synthetic Organic Chemicals Industry.
5 (f) – B Category
2
8. Total plot
Area: Notified
Industrial Area/Estate:
1974 sq .m
Yes. Project does fall under notified industrial area.
9. TOR given by SEAC?
We have submitted revised EIA report as per standard TOR.
10. EIA Submitted?
Yes
11. Estimated cost
of
the project : (Pl quote
estimation clearly
specifying cost
for land,
building, plant
and machinery
separately)
Total Project Cost : 93 Lakhs
12. Location details of
the project :
Latitude: 20° 56’32.95”N Longitude: 78° 57’39.72”E
Elevation above sea level : 943 ft above Mean Sea Level
13. Distance from
protected areas/Critically
polluted area/Eco
sensitive areas/Inter
State
boundaries
The existing industry is situated in notified MIDC.
There are three Reserved Forest as given below: Bidsukli – 5-6 kms
Junpani- 8-9 kms Dongargaon-5-6kms
14. Water Conservation
I. Rain water Harvesting (RWH) Peak Rainfall per day = 0.2 m/day
Sr.No. Description Area
(m2)
Co-Eff Max. Rain
(m/Day)
Volume
(m3/Day)
1 Terrace Area 600 0.90 0.2 108
Maximum quantity of rainwater that can be harvested = 108 m3 per day
No. of Recharge pits: 1 (one) 3m x 3m x 3m
II Total Water Requirement: i) Water Supply Source : MIDC, Butibori
ii) Total water requirement : 7 KLD
Domestic : 1 KLD
Industrial process : 0.5
Industrial CoolingTower : 2 KLD
3
Reactors and Tools Washing: 1.5KLD
Gardening : 2 KLD
15. Sewage & Waste water
Total Sewage Generation : 0.75 m3/day
- Mode of collection: Septic tank
- Mode of treatment: Soak pit & Septic tank
- Mode of Disposal
Overflow of septic tank will be used for gardening.
Total Effluent Generation: 2 m3/day
- Mode of treatment: Primary treatment in proposed ETP of capacity 3
KLD and will be sent to CETP, Butibori.
16. Solid Waste Management
# Source Total Quantity Mitigation
A Non-Biodegradable
1. Discarded
Containers/Barrels/Liners
1.0 MT/Month Sold to authorized
parties
B Biodegradable
1. Domestic Waste 0.093
MT/Month
Composting
2 Gardening Waste 0.075MT/Month Composting
C Hazardous Waste
1. Chemical sludge from
waste water treatment
0.6MT/Month CHWTSDF, Butibori
17. Green Belt Development
I. Total R.G. Area in sqm Total R.G. Area – 651.42 sq.mt.
II. Numbers and name of species of trees to be planted.
Green belt will be developed around the plant to mitigate the air and noise pollution in the plant.
No. of trees to be planted : 40 Nos.
Sr.No. Name Number
1. Ficus religiosa 10
2. Azadiracha indica 05
3. Melia azadiracta 10
4. Delonix regia 10
5. Peltophorum pterocarpum 05
Total 40
III. Tree cutting/transplantation/compensatory plantation, if Any –NOC : N.A.
18. Details of Fuel used:
Source of Fuel : Mode of
Transportation of fuel to site
S. No. Fuel Total
1 LDO 90 KL/Annum
2 Diesel (DG
set) 3000 Lit//Annum
4
19. Energy I. Energy saving by non conventional method
- details calculations & % of saving N.A.
II. Source of Power & Supply capacity Source: MSEB
Requirement: 50 HP III. Distribution System: N.A.
IV. Alternate supply for essential service 1 nos. of D. G. set with capacity of 25 KVA will be used as back up for
emergency
V. DG Set (Only for back-up): Type of fuel used and capacity Type of fuel : Diesel
20. Environmental Management
Plan Budgetary Allocation
Sr. No. Description Cost (Rs. in
Lakhs/Annu
m)
Construction Phase
1 ETP(Construction) 3.50
2 Air Pollution Control Measures 1.20
3 Rain Water Harvesting 0.50
4 Tree Plantation and gardening 0.50
Total 5.70
Operational Phase
1 ETP (O & M) 1.00
2 Solid Waste Management 0.40
3 Health Care & Safety 0.40
4 Environmental Monitoring 1.50
Total 3.30
Total 9.0
21. Public Hearing Details: N.A.
22. Manufacturing Process Details
22A Raw Materials Refer Annexure-I
22B Products Sr no Name of Products Capacity
1 Esters 50 MT/ M
2 Surfactants / Sulphosuccinates 30 MT/M
3 Defoamers / Antifoamers 50 MT/M
4 Emulsifying agents 20 MT/M
23. Storage of Hazardous
Chemicals
Methanol is the only hazardous chemical used which will be
stored in tanks.
24. Details of pollution control Air Pollution Control System : Scrubber
5
system Water Pollution Control System :
- Sewage generated will be treated in Septic tanks & Soak pits & treated sewage will be used for green belt
area. - Industrial effluent will be given primary treatment in
proposed ETP of 3 KLD and then sent to CETP, Butibori.
Noise Pollution Control System :
- Buffer in the form of wall & Tree plantation
- Use of Acoustic Enclosures
- Predictive maintenance of fans, blowers, compressors
& other machineries.
- Steady foundations for all the equipments.
25. Emission Atmospheric Emission: No atmospheric emission has observed
due to loading & de loading of material.
Stack Emission:
Sr.No Particular Stack
No
Details of Stack
Height,
m
Diameter
m
1. Scrubber 01 24 1
26.
Emission standard
Pollutant NAAQS
standard
MPCB Consent
SPM 500 µg/m3
150 mg/Nm3 RPM 100 µg/m
3
SO2 80 µg/m3 72 kg/day
NOx ---- 35 mg/Nm3
CO 2 mg/m3 ---
27. Ambient air quality data Refer Annexure- II
28. Specific air pollution issue N.A.
6
ANNEXURE-I
Sr no Name of Product Raw Material Quantity
1 S.M.S (Sorbitan Mono Stearate)
Yield 1600 Kg
Stearic Acid
Sorbitol
Caustic Soda
1056 Kg
677Kg
5 Kg
2 S.M.P (Sorbitan Mono Plamitate)
Yield 1600 Kg
Palmic Acid
Sorbitol
Caustic Soda
1400 Kg
1000 Kg
5 Kg
3 G.M.S. (Glycerol Mono Stearate)
Yield 1600 Kg
Stearic Acid
Glycerin
Caustic Soda
1270 Kg
411 Kg
3 Kg
4 S.M.O (Sorbitol Mono Oleate)
Yield 2200 Kg
Rice Bran Fatty Acid/Oleic Acid
Sorbitol
Caustic Soda
1450 Kg
935 Kg
4.1Kg
5 Di - Octyl Sulphosuccinate
Yield 1750Kg
(Stage I) 2 EHA (2 Ethlyl hexa Alchol)
Meleic Anhydride
PTSA (Para Toluene Sulphonic Acid) (Stage II) ON (Dioctyl Maleate)
Sodium Bi Sulphide Methanol
955 Kg
360 Kg
14 Kg 800 Kg
260 Kg 400 Lit
6 Defoamers / Antifoamers
Yield 3000 Kg
S.M.O
O.S.A.A
FUSSAL OIL
1160 Kg
1780 Kg
80 Kg
7
ANNEXURE-II
Station
Code
Name of the
Station
Wind Diresction Distance from
Project Site (km)
Direction from
Project Site
A1 Project Site -- Centre of Site -
A2 Vadgaon Village Upwind 5.2 N
A3 Khapri (More) Village
Downwind 6.1 SW
A4 Mandva Village Upwind 4.5 W
A5 Satgaon Village Upwind 3.8 E
A6 Butibori Village Downwind 4.5 E
Location PM-10 (μg/m
3) PM-2.5 (μg/m
3) SO2 (μg/m
3) NOx (μg/m
3)
CO
(mg/m3)
Max. Min. Avg. Max. Min. Avg. Max. Min. Avg. Max. Min. Avg. Max. Min. Avg.
A1 37.12 31.20 34.16 14.28 11.22 12.75 17.72 15.56 16.64 9.35 8.86 9.10 0.22 0.19 0.20
A2 38.55 36.23 37.39 16.78 14.31 15.54 15.11 14.34 14.72 11.76 9.22 10.49 0.49 0.40 0.44
A3 35.34 31.32 33.33 17.23 13.45 15.34 14.43 12.29 13.36 12.54 10.33 11.43 0.67 0.55 0.61
A4 29.11 28.02 28.56 19.34 15.44 17.39 15.23 13.38 14.30 9.76 7.78 8.77 0.78 0.68 0.73
A5 26.96 24.98 25.97 13.11 11.42 12.26 15.76 13.34 14.55 11.70 9.98 10.84 0.56 0.45 0.50
A6 34.78 32.65 33.71 16.78 13.46 15.12 17.22 14.84 16.03 10.65 8.98 9.81 0.74 0.65 0.69