Transcript
![Page 1: John Vernooij (Director Waste Processing Department, Omrin)](https://reader036.vdocument.in/reader036/viewer/2022081603/56815cb7550346895dcab46b/html5/thumbnails/1.jpg)
Binnenvaart & Dryport Congres
Harlingen
John Vernooij(Director Waste Processing Department, Omrin)
![Page 2: John Vernooij (Director Waste Processing Department, Omrin)](https://reader036.vdocument.in/reader036/viewer/2022081603/56815cb7550346895dcab46b/html5/thumbnails/2.jpg)
Omrin waste management company
Waste collection180,000 households
Waste processing400,000 tonnes/year
Logistics710,000 tonnes/year
Demolition waste370,000 tonnes/year
Share holders: Frisian municipalitiesTurn over: approx. € 110 m/aEmployees: 550
![Page 3: John Vernooij (Director Waste Processing Department, Omrin)](https://reader036.vdocument.in/reader036/viewer/2022081603/56815cb7550346895dcab46b/html5/thumbnails/3.jpg)
Inhabitants: 1.7 million
Companies: 78,000
Annual tonnes of waste: 1.2 million
Work area: The Netherlands
![Page 4: John Vernooij (Director Waste Processing Department, Omrin)](https://reader036.vdocument.in/reader036/viewer/2022081603/56815cb7550346895dcab46b/html5/thumbnails/4.jpg)
• ABE
![Page 5: John Vernooij (Director Waste Processing Department, Omrin)](https://reader036.vdocument.in/reader036/viewer/2022081603/56815cb7550346895dcab46b/html5/thumbnails/5.jpg)
DryportOudehaske
![Page 6: John Vernooij (Director Waste Processing Department, Omrin)](https://reader036.vdocument.in/reader036/viewer/2022081603/56815cb7550346895dcab46b/html5/thumbnails/6.jpg)
Visualisation WtE facility in Harlingen
• 230,000 t/y• 100 MW• Heat supply to Frisia Zout • 75 mio m3 natural gas savings• 80% Energy efficiency• Reduction CO2–emission 140,000 ton