JWST Data Management Systems
Gretchen Greene
Nov 26 2012
Nov 26 2012
Nov 26 2012
Nov 26 2012
JWST Mission Hierarchy for DMS
Nov 26 2012
Nov 26 2012
Nov 26 2012
Nov 26 2012
DMS Estimated Archived Data Volumes – Baseline
Data Per Yr (TB)
5.5 yr Mission (TB)
10 yr Mission (TB)
Recorded engineering
0.3 1.6 3.0
Level-0 20.9 115.0 209.0
Level-1a 20.9 115.0 209.0
Level-1b 20.9 115.0 209.0
Level-2a (compressed 2:1)
1.0 5.6 10.2
Level-2b (compressed 2:1)
1.0 5.6 10.2
Level-3 (compressed 2:1)
1.0 5.6 10.2
WSS Archive package (compressed 2:1)
0.05 0.25 0.5
Total 66.1 363.7 661.1
Nov 26 2012
Nov 26 2012
Nov 26 2012
Nov 26 2012
JWST DMS Interface Context
Project Level Agreements will be defined ~L-24mo
Dec 6-7. 2012
Nov 26 2012
Nov 26 2012
Nov 26 2012
Nov 26 2012
JWST vs. HST DMS…Many Similarities, systems reuse (DADS, MAST), and
lessons learned, however there are…• Key Basic Differences:
– Order of magnitude increase in computational and I/O DMS throughputs
– Flight Operations System interfaces to DMS will support direct transfer at STScI of DSN telemetry data and require priority data processing for Wavefront Sensing and Control
• Functional Decisions:– As a result of Trade Studies, BOTH HST and JWST will be moving
toward scalable distributed architecture• Data Processing Workflow Management system (OWL-CONDOR)• Dynamic Reprocessing of Data Products with CRDS• Online Data Product File CACHE
– Higher Level data product generation assumed fundamental– Service based architecture to support multi-mission DMS
Nov 26 2012
Nov 26 2012
Nov 26 2012
Nov 26 2012
MAST + JWST
• STScI Archive Access systems include the intersection between the JWST mission operations & MAST– Distribution Services– Archive User Interface (MAST Portal)– User Authentication– Archive Catalog (CAOM)– Online Data Product Cache
Nov 26 2012
Nov 26 2012
Nov 26 2012
Nov 26 2012
Multi mission Functional Architecture Overview – SDR1
Nov 26 2012
Nov 26 2012
Nov 26 2012
Nov 26 2012
JWST SOC DMSRequirements and Design Phases
• Completed formal Systems Level 4 Requirements– ~ 650 requirements for I&T verification
• Beginning DMS I&T for internal Build 1• Currently in year 2+ of design and development
– Systems Design Review 2 – Dec 6-7, ’12
• Designing for Launch Readiness Data (LRD) 2018 with 95% level of current STScI DMS capability
Nov 26 2012
Nov 26 2012
Nov 26 2012
Nov 26 2012
S&OC Science Systems Engineering, Flight Operations, and Systems Development Timeline for a JWST 2018 LRD
Nov 26 2012
Nov 26 2012
Nov 26 2012
Nov 26 2012
DMS Build PlanBuild Name
Build Description
Components enabled Supported Systems
TargetedDelivery
Status
0 Internal Build Workflow Manager, Minimal Ramp Processing Pipeline, SID
DMS Design & Development
Dec-11 Completed
1 DMS Level 1 Internal I&T
DMS Workflow, Baseline Level-2a Pipeline, Baseline Level-2b Imaging Pipeline, CRDS, SID, Baseline SDP-1a
DMS, ISIM CV1RR
Sept-12 In Test
2 DMS I&T
ISIM Cryo 2 (OSIM)
DMS SDP WFS&C, Baseline WSS Pipeline, Baseline Level-2b Spectrographic Pipeline, SID , Baseline SDP-1b
DMS, ISIM Cryo 2
Sept-13 In Dev
3 DMS I&T
ISIM Cryo 3 (OSIM)
DMS - All SIs SDP, Baseline Operations Archive, Baseline Level-3 Imaging Pipeline, SID
DMS, ISIM Cryo 3 (?)
Sept-14
4DMS I&T SOC
Integration
DMS, CAL, SDP, EDP, CRDS, SID. Partial Baselines for Archive Access, Level 2 Spectrographic
SOC with DMS internal
Sept-15
5 DMS I&TJSC/OTIS
DMS, CAL, SDP, EDP, CRDS, Baseline Archive Access, Baseline Level-3 Spectrographic Pipeline, SID
SOC1,DMS, JSC/OTIS Testing
June-16
6 DMS CST2&3
+ Flight Release Fully Functional DMS SOC2,DMS
Flight Release Feb-17 (test cycle
+L-12)
6.1DMS Pre-Flight
UpdatesFully Functional DMS Updates SOC Pre-Flight
UpdatesJan-18