KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS PLANS
OCTOBER 2007
![Page 2: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/2.jpg)
THE PORT OF MOMBASA… Gateway to East & Central Africa
KPA
VALUE S
ITS
CUSTOMERS
MANDATE
The port of Mombasa is managed by Kenya Ports Authority.The port of Mombasa is managed by Kenya Ports Authority.
Vision Vision
To be rated amongst the top 20 ports in the world in To be rated amongst the top 20 ports in the world in terms of reputation and performance by the year 2010.terms of reputation and performance by the year 2010.
Mission Mission
Facilitate seaborne trade in the most efficient manner by Facilitate seaborne trade in the most efficient manner by progressively benchmarking operational targets against progressively benchmarking operational targets against internationally accepted standards.internationally accepted standards.
PORT OF MOMBASA
![Page 3: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/3.jpg)
PORT OF MOMBASA
• Gateway to East & Central Africa• Natural harbour for Deep sea-going ships• Multi-purpose port• Multi-modal links
![Page 4: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/4.jpg)
ONE OF EAST & SOUTHERN AFRICA’S LEADING PORTS
Durban Mombasa
Daresalaam
Maputo
![Page 5: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/5.jpg)
MOMBASA PORT – RAIL NETWORK
![Page 6: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/6.jpg)
MOMBASA PORT – ROAD NETWORK
![Page 7: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/7.jpg)
The Port of Mombasa comprises• General Cargo berths:• Dockyard and ship repair
facilities• Container Terminal• Specialised berths• Liquid oil terminals
![Page 8: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/8.jpg)
PORT PERFORMANCE PORT PERFORMANCE –– TOTAL THROUGHPUT TOTAL THROUGHPUT 2002 2002 -- 20072007
02468
10121416
2002 2003 2004 2005 2006
'000
' DW
T
In the past five years the volume of cargo traffic through the port has risen by over 40%
![Page 9: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/9.jpg)
PREAMBLE
CAPACITY UTILISATION (General)• Currently high as shown below despite yard
demolitions and related projects
PERIOD TRAFFIC CAPACITYUTILISATION
CURRENT (with developments)
14.42M 60 – 65%
2007 (Projected) 15.30M 68%
Growth in throughput expected to grow at the rate of 6% ++ in tandem with growth in GNP
![Page 10: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/10.jpg)
PREAMBLE
TRAFFIC PROJECTIONS
Trends indicate increase in traffic leading to stress on currentcapacity as shown below:
MASTER PLAN PROJECTIONS
MANAGEMENTPROJECTION
ACTIONREQUIRED
Port to handle traffic of 32 million tonnes
By: 2028 By: 2023 Urgent need to develop additionalCapacity now.
Recall that other ports accept 40% as the optimal capacity utilisation level
Mgt projection is based on the following consideration:
1. Expected traffic from Sudan, Ethiopia and Tiomin Exports. 2. Continued impressive economic performance of Hinterland
Countries
![Page 11: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/11.jpg)
Port Operations
• Trend indicative of a mature sectoral distribution• Mombasa still a Mixed Cargo Port
TYPE BulkLiquid
DryBulk
ConventionalCargo
ContainerisedCargo
20062006 34.8% 18.4% 9.1% 34.1%
5 Year Average5 Year Average 38.6% 16.5% 10.7% 34.3%
• Last 5 years imports averaged 9.95M Tonnes: 79% of Total Traffic of 12.63
• Cargo composition is shown below:
![Page 12: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/12.jpg)
Port Operations
2006 JAN – MAR2007
Remarks
Mombasa ContainerMombasa ContainerTerminalTerminal 80.0 95.3
(Red Flag) at saturation levels
SOTSOT 65.0 51.0 tending towards saturation
KOTKOT 79.0 68.0 Red Flag
Conventional CargoConventional Cargo 43.8 41.4 Acceptable levels
BERTH OCCUPANCY IN PERCENTAGE
•Need to generate handling capacity for containers, bulk oil and dry bulk
•Need to consider development of additional Berth at the Mbaraki Wharf
Strategic Plan the following discusses programmes for progressively transforming the Port of Mombasa into a world class Port in line with the corporate VISION
![Page 13: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/13.jpg)
• MEASURES PUT IN PLACE TO IMPROVE PERFORMANCE
![Page 14: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/14.jpg)
Equipment Modernisation
• 3NO. TUGBOATS
Capacity; 55- 6O Ton BoullardPull
4th Tug under rehabilitation
![Page 15: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/15.jpg)
TWO PILOT BOATS-
![Page 16: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/16.jpg)
MARINE CRAFT
PATROL BOATS
• 2No: Patrol Boats delivered in 2003
![Page 17: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/17.jpg)
SHIP TO SHORE GANTRY CRANES (STS)
• 4No: Delivered in 2005
PERFORMANCE SPEEDS
Trolley 200m/minHoist 70m/minTravelling: 46 min/min
![Page 18: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/18.jpg)
RUBBER TYRED GANTRIES (RTGs)
• 12 NO. RTGs delivered in 2004/5SPEEDSTrolley: 70M/m/minTravel: 135m/minHoist: 25m/min (Load)
52m/min No: Load
![Page 19: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/19.jpg)
RAIL MOUNTED GANTRY CRANES (RMGs)
• 2 No: Delivered in 2005
PERFOMANCE SPEEDS
Trolley 7Om/minHoist 25m/min
Load52m/min no load
Travel 45m/min
![Page 20: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/20.jpg)
TERMINAL TRACTORS
• 65No: deliveredBetween 2003-05• 17 delivered in August
2007
![Page 21: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/21.jpg)
REACHSTACKERS
• 11 No: Delivered between 2002 and 2004
• Received 3 more in August 2007
![Page 22: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/22.jpg)
PROPOSED REFORMS
RATIONALE FOR REFORMS
1. Enhanced Efficiency2. Improved Productivity3. Private Sector Participation
![Page 23: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/23.jpg)
PROPOSED REFORMS
PREFERRED OPTIONS1.Privatisation of the Conventional Cargo
operations2. Concessioning of Dyd Services & ICDs3. Corporatisation of MCT 4. Rehablitation and operation of Cruise Passenger
Terminal Facility5. Devt of FTZs on BOT6. Corporatisation of the Bandari College Services
Approved Actions by the Board were to be implemented. A review on Progress follows
![Page 24: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/24.jpg)
THE MOMBASA CONTAINER TERMINAL
STATUS OF MCT
1. Handles 34% traffic2. Contributes 55% Revenue3. Capacity problems: nearing saturation
Design capacity: 250,000 2006 Handled: 479,000 2006 Projected: 530,000
With current configuration, capacity limit is 540,000 TEUS
SHORT-TERM MEASURE
1. Construction of Berth No. 19
Quay Length: 760mStorage: 140,000 TEUs
MCT throughput to improve to 600,000 TEUS
Urgent Need to construct Berth No. 19 and acquire the necessary equipment. Tendering for Construction after June 2007
Given the investment madeAt the MCT and its pivotal
Role in the economy,Corporatisation is the
Preferred option
![Page 25: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/25.jpg)
THE MOMBASA CONTAINER TERMINAL:EXPANSION PROGRAMME
PROPOSED NEW TERMINAL1. Involves expansion of MCT to area west of
KOT2. Features:
100 Hectares of yard space from the reclamation.3 berths of 900 meters.Draught of -15.5 meters.60,000 GT Panamax Vessels.New Access Road, (3 lane highway) at Port Reitz to join the old port Reitz airport road. New Railtainer Terminal to Kipevu
Layout of Proposed Terminal follows
![Page 26: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/26.jpg)
New Container Terminal
PROPOSED NEW TERMINAL
![Page 27: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/27.jpg)
Proposed New Container Terminal Plan
![Page 28: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/28.jpg)
PROPOSED REFORM : SPECIAL OPERATIONS BERTHSCRUISE TERMINAL
• Conversion of Berth No. 1 with future extension to No2• Response to tender poor • Lessons learnt from the Miami trip• KPA to undertake project on RO- improvement works started• Promotion of business thro’ the CIOA
![Page 29: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/29.jpg)
CONTAINER FREIGHT STATIONS
• UNPRECEDENTED BERTH THROUGHPUT• 15,000 TEUs Daily• Licensed two CFSs to handle containers• Operations started on 1st October, 2007• Plans for transit countries to have own CFSs
![Page 30: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/30.jpg)
MCT EXPANSION PROJECT: EXPANSION (ADDITIONAL WORKS)
• Plans to Dredge channel and berths to 15 metrs
![Page 31: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/31.jpg)
DEVELOPMENT OF THE 2ND COMMERCIAL PORT
• Authority looking into the possibility of developing a second commercial port
• Usage of small ports
![Page 32: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/32.jpg)
•CURRENT CHALLENGES
![Page 33: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/33.jpg)
FACTORS AFFECTING CONTAINER TERMINAL PERFORMANCE
Rapid increase of container traffic volumes
Importers use the port as a storage area Average dwell time of 14 days
Poor off take by rail. Rail now handling only 6%
Lack of adequate capacity by road and poor road infrastructure.
Long bureaucratic cargo clearance processes
Equipment Breakdown and erratic power supply
![Page 34: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/34.jpg)
FACTORS AFFECTING CONTAINER TERMINAL PERFORMANCE
Inadequate equipment to handle the growing traffic
Unusual long rains from Nov 2006 to February 2007
Changing routine patterns i.e shorter rotations. Mombasa is now a feeder port.
Deployment of additional vessels by shipping linesNew shipping Lines
Deployment of unsuitable vessels
![Page 35: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/35.jpg)
FACTORS AFFECTING CONTAINER TERMINAL PERFORMANCE
Changing box ratio . More 40 foot containers
Bunching of vessels & unscheduled arrivals
Overbooking of cargo by shipping lines
Late submission of clearance documents
Lengthy custom warehouse and auctioning processes
![Page 36: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/36.jpg)
• Addition of two new Ship to Shore Gantry cranes at the container terminal in the year 2007/8
•Additional six new Rubber Tyre gantry cranes at the container terminal in year 2007/8
• Building another Berth 19 to boost the container terminal’s operational capacity. To be complete in the year 2009/10
• Construction of a 2nd container terminal –Expected to be ready by 2013 and will handle 1.2 million TEUs annually.
MEDIUM/LONG TERM INITIATIVESMEDIUM/LONG TERM INITIATIVES
![Page 37: KENYA PORTS AUTHORITY- OVER VIEW & PORT REFORMS …Gateway to East & Central Africa K P A V A L U E S I T S C U S T O M E R S MANDATE The port of Mombasa is managed by Kenya Ports](https://reader033.vdocument.in/reader033/viewer/2022050410/5f8756554320103eb6310765/html5/thumbnails/37.jpg)
• We are embarking on dredging the harbourchannel and widening the turning basin to accommodate larger vessels
• Additional terminal equipment on order including 2 STSs, 6 RTGs, 6 Terminal Tractors, Reachstakers and Trailers
• Implementation of waterfront system & VTMIS by Nov 2007
• Utilization of small ports
• Development of a second commercial port
MEDIUM/LONG TERM INITIATIVESMEDIUM/LONG TERM INITIATIVES