Click to edit Author, Func2on Helmut Ennen RIM Plus Workshop, Brussels 04.11.2014
KETs Pilot Lines and Combined Funding
H. Ennen, KETs Pilot Lines and Combined Funding RIM Plus Workshop, Brussels, 04.11.2014
Content
1. Nanoelectronics: a KET 2. The Challenge 3. The FP7 Progress 4. H2020 PerspecDve: ECSEL JU
H. Ennen, KETs Pilot Lines and Combined Funding RIM Plus Workshop, Brussels, 04.11.2014
Nanoelectronics: the “Smart” of Everything
Smartphone
Smart Card
Smart Grid
Smart Cities
Smart Mobility
Smart Governance
….
Smartanything ! Nan
oele
ctro
nics
: a K
ET
H. Ennen, KETs Pilot Lines and Combined Funding RIM Plus Workshop, Brussels, 04.11.2014
Increasing Awareness
Who forgets the strategic importance of
Nanoelectronics
as basis for the Informa2on and Communica2on Technology
may end up receiving a wake-‐up call…
Nan
oele
ctro
nics
: a K
ET
H. Ennen, KETs Pilot Lines and Combined Funding RIM Plus Workshop, Brussels, 04.11.2014
Call to PoliDcal AcDon
Market Share of the Leading Companies Headquartered in Europe
The
Cha
lleng
e
CapEx per Headquarter Region
H. Ennen, KETs Pilot Lines and Combined Funding RIM Plus Workshop, Brussels, 04.11.2014
Call 2012-1 Call 2013-1
Call 2012-2 Call 2013-2
MATURITY MILESTONE
Non-‐commercial engineering samples, prototypes… Commercial products
Failing system qualificaDon may require another fulll development loop!
Pilot Lines: Moving Towards InnovaDon FP
7 P
rogr
ess
H. Ennen, KETs Pilot Lines and Combined Funding RIM Plus Workshop, Brussels, 04.11.2014
Raising to the Challenge: The “Three Pillar Bridge” of the HLG on KETs
1 Executed by an industrial consorDum
2 Using an innovaDve technology
3 Developing an innovaDve product, meeDng a social challenge
4 DemonstraDng its value and potenDal
5 Establishing a realisDc environment, a facility
6 Having a deployment plan to a real life European manufacturing site
! !
!
!
!
! R&D Part
ENIAC JU compatibility R&D Project :
FP7
Pro
gres
s
(at least “experimental development”)
H. Ennen, KETs Pilot Lines and Combined Funding RIM Plus Workshop, Brussels, 04.11.2014
ParDcipaDons in the ENIAC KET Pilot Lines
29
13
1
6
56
2
4
11
97
3
13
14
4
6
45
4
3
5
3
1
5
IL
FP7
Pro
gres
s
3 10
TR
→Malta
NO
H. Ennen, KETs Pilot Lines and Combined Funding RIM Plus Workshop, Brussels, 04.11.2014
The ENIAC JU Pilot Lines Projects
With 14 Pilot Lines selected for funding
with total eligible costs pf 1.79 B€ supported by 265 M€ na2onal funding
and 267 M€ ENIAC JU grants,
the ENIAC Joint Undertaking became the leading instrument
for implemen2ng
KET policies !
FP7
Pro
gres
s
H. Ennen, KETs Pilot Lines and Combined Funding RIM Plus Workshop, Brussels, 04.11.2014
10
INDEXYS SCALOPES iLAND ACROSS ASAM SMECY
PRESTO CRAFTERS PaPP COPCAMS R3COP
CESAR CHARTER CHESS SYSMODEL iFEST RECOMP MBAT pSafeCer nSafeCer DESERVE VARIES VeTeSS CONCERTO
.. starting from single projects towards the EMC2 platform approach..
‘Embedded MulD-‐Core Systems for Mixed CriDcality ApplicaDons in Dynamic and Changeable Real-‐Dme Environments’
98 Partner , 16 EU Countries, 100 Mio € Budget
Innovation Pilots
Scientific Communities
Multi-core Technology
Safety-critical Systems
.. Technology Bus
Living lab 1
Living lab 6
EMC2 System Architecture
Technology Subprojects
EMC2
H. Ennen, KETs Pilot Lines and Combined Funding RIM Plus Workshop, Brussels, 04.11.2014
EMC 2 -‐ Applica'on Domains Addressed
11
• Automo2ve
• Aerospace
• Railway
• Shipping
• Industrial manufacturing
• Logis2cs
• IT-‐infrastructure (‘Internet of Things’)
• Healthcare
H. Ennen, KETs Pilot Lines and Combined Funding RIM Plus Workshop, Brussels, 04.11.2014
ENIAC JU Public Funding
Box: plan from 2008. Line: actual FP7
Pro
gres
s
H. Ennen, KETs Pilot Lines and Combined Funding RIM Plus Workshop, Brussels, 04.11.2014
ENIAC JU Eligible R&D Costs
Box: plan from 2008. Line: actual FP7
Pro
gres
s
H. Ennen, KETs Pilot Lines and Combined Funding RIM Plus Workshop, Brussels, 04.11.2014
Ecosystem ParDcipaDon in ENIAC JU FP
7 P
rogr
ess
H. Ennen, KETs Pilot Lines and Combined Funding RIM Plus Workshop, Brussels, 04.11.2014
ENIAC Pilot Lines: MulD-‐KET
KET AGAT
E E450ED
L EP
PL
Lab4
MEM
S PLACES2BE
DEM
ETER
E450LM
DAP
eRAMP
Lab4
MEM
S II
PANACH
E PLACY
D
POLIS
THINGS2DO
ViDaP
Nanotechnology
Micro-‐/nanoelectronics
X X X X X X X X X X X X X X
Photonics X X X
Advanced materials
X X X X X X
Industrial biotechnology
Advance Manufacturing
X X X X X X X X
" Nanotechnologies
" Micro and Nanoelectronics
" Photonics
" Advanced materials
" Industrial Biotechnology
" Advanced Manufacturing Systems
Commission communication “Preparing for our future: Developing a common strategy for key enabling technologies in the EU, Brussels, 30.09.2009”, COM(2009) 512
" Micro and Nanoelectronics
" Photonics
" Advanced Materials
" Advanced Manufacturing
FP7 H2020
Driving inno
va2o
n
H. Ennen, KETs Pilot Lines and Combined Funding RIM Plus Workshop, Brussels, 04.11.2014
The strategy in Electronic Component and Systems relies on obvious necessi2es: " Without a state of the art technological infrastructure, Europe will be
dependent on importa2on (ENIAC)
" Without func2onality provided by the embedded so`ware the chips are useless and the fabs are economically unsustainable (ARTEMIS)
" Without integra2ng components in smart systems, it is impossible to capture the economic benefits on the end user markets (EPoSS)
► ENIAC + ARTEMIS + EPoSS = ECSEL
Synergies in Components and Systems H
2020
: EC
SE
L
H. Ennen, KETs Pilot Lines and Combined Funding RIM Plus Workshop, Brussels, 04.11.2014
EvoluDon of European public funding policy and its impacts on the Dresden related implantaDon decisions of AMD / GlobalFoundries
European Social Fund; Source: Area Development magazine, Saratoga Economic Development Corporation, ttp://www.bizjournals.com/albany/stories/2010/05/31/daily1.html, Expert interviews, Own analysis
2002 – 2011
• Reduction of the existing funding quota
• ⇒ Funding rates of ~10,5% for large investments
1990 – 1997 • Combined Funding of
– Subsidy for investment – Support of a credit (debt guarantee) – Qualification via ESF1
– Support for R&D (Federal and Regional Gvmnt, EC)
• ⇒ Funding rate of 35%
1998 – 2001
• Multisectoral framework for large investments
• ⇒ Funding rates of 5,25% to 35% – 19,8% for Infineon 300mm plant – 35% for certain PV plants
AMD builds a plant in Dresden thanks to special aids and 30% subsidies ‘90s
Labour, Educa2on, U2li2es, Cost of Manufacturing
3 shortlisted candidates
Saratoga not first, but…
Saratoga (NY)
33% or $1.4B
Dresden
~10,5% or ~450M$
Singapore
No data Subsidies
08/2010 Global Foundries builds its 4,2B$ factory in Saratoga (US), thanks to subsidies
Selec2on Criteria
H. Ennen, KETs Pilot Lines and Combined Funding RIM Plus Workshop, Brussels, 04.11.2014
Large Investment Supported by Combined Funding: “Airbus of Chips”
Total Investment : 6 B €
R&D&I: 2 B€
IA eligible 0.6B€
ESIF eligible 1B€
JU 75M
NaDonal/regional: 200M
ERDF 300M (at 60%)
State Aid: 420M (10.5%)
Industrial Investment : 4 B€
Maximum Aid Amount Without Combined Funding : = R × (50 + 0.50 × B + 0.34 × C) Assuming R=0.3: 0.3 X (50 + 0.50 x 50 + 0.34 x 5,900) = = 624.3 M€ (10.4%)
Combined Funding: • H2020: 50M€ • JU: 150 M€ • ERDF: 300 M€ • Na2onal/regional: 770M€
Total: 1,270 million (21.2% of the total investment)
RIA eligible 0.4B€
H20
20
50M
JU 75M
Nat 75M
Nat 75M
Impl
emen
tatio
n
H. Ennen, KETs Pilot Lines and Combined Funding RIM Plus Workshop, Brussels, 04.11.2014
Intended Call(s) Note: work in progress, informaDon may change
" Call launching: – 9 July 2014 – No Project Outline phase, just Full Project Proposal – Submission deadline: mid September – Funding decision: before year end
" One Call TRL 2-‐5: Research / Innova2on Ac2ons One call on TRL 4-‐8: Innova2on Ac2ons (Pilot Lines)
H20
20: E
CS
EL
H. Ennen, KETs Pilot Lines and Combined Funding RIM Plus Workshop, Brussels, 04.11.2014
Thank you for your attention!