{Kochi Metro Rail }Group Members:
Aiman Deepti
Gajalakshmi Imran Raghuraman Suryadev Maity
![Page 2: Kochi metrorail project](https://reader036.vdocument.in/reader036/viewer/2022062513/5561bae2d8b42aad2b8b4e91/html5/thumbnails/2.jpg)
Introduction
![Page 3: Kochi metrorail project](https://reader036.vdocument.in/reader036/viewer/2022062513/5561bae2d8b42aad2b8b4e91/html5/thumbnails/3.jpg)
Introduction
1.81 million (2001 census)
Growth Rate: 1.4% Per annum
![Page 4: Kochi metrorail project](https://reader036.vdocument.in/reader036/viewer/2022062513/5561bae2d8b42aad2b8b4e91/html5/thumbnails/4.jpg)
Energy
Introduction
Reliable
Comfortable
Safer
![Page 5: Kochi metrorail project](https://reader036.vdocument.in/reader036/viewer/2022062513/5561bae2d8b42aad2b8b4e91/html5/thumbnails/5.jpg)
{
![Page 6: Kochi metrorail project](https://reader036.vdocument.in/reader036/viewer/2022062513/5561bae2d8b42aad2b8b4e91/html5/thumbnails/6.jpg)
{
Vision
Our vision is to be a world-class metro rail system that enhances the quality of life for the citizens of Kochi
Mission
To provide a reliable, safe, efficient, viable and customer friendly rapid transit system for the greater Kochi area that is environmentally sustainable
Strategic Goals
Operational Goals
![Page 7: Kochi metrorail project](https://reader036.vdocument.in/reader036/viewer/2022062513/5561bae2d8b42aad2b8b4e91/html5/thumbnails/7.jpg)
Project ProfileRoute Length (between dead ends) 25.612 Km
Number of Stations 23
Total estimated cost (without taxes)- Rs 3733 crores Completion cost (by Year 2016) (i) including escalation and Central taxes only Rs. 4910 Crores(ii) including escalation, Central and State taxes Rs. 5146 CroresCapacity/train : 600 passengers (initial) Financial Indices a) FIRR
3.04%b) EIRR
14.2%Fare : Rs 12/- to Rs 30/
![Page 8: Kochi metrorail project](https://reader036.vdocument.in/reader036/viewer/2022062513/5561bae2d8b42aad2b8b4e91/html5/thumbnails/8.jpg)
{5,181.79 crore (US$943.09 million)
Project Time & Cost
Total cost
Surcharge : 250 Crore annually
Taxes and duties: 616 crores
![Page 9: Kochi metrorail project](https://reader036.vdocument.in/reader036/viewer/2022062513/5561bae2d8b42aad2b8b4e91/html5/thumbnails/9.jpg)
Project plan
Construction
Station Locations
Coach design and basic parameters
Selection of Technology
Passenger Safety Features
Planning and Design Criteria for Stations
![Page 10: Kochi metrorail project](https://reader036.vdocument.in/reader036/viewer/2022062513/5561bae2d8b42aad2b8b4e91/html5/thumbnails/10.jpg)
![Page 11: Kochi metrorail project](https://reader036.vdocument.in/reader036/viewer/2022062513/5561bae2d8b42aad2b8b4e91/html5/thumbnails/11.jpg)
Tickets are expected to be priced between 10 and 30
Operation Philosophy
Make the MRT System more attractive and economical
Train Operation Plan
Traffic Demand
![Page 12: Kochi metrorail project](https://reader036.vdocument.in/reader036/viewer/2022062513/5561bae2d8b42aad2b8b4e91/html5/thumbnails/12.jpg)