Why a Capital Project?
• Maintain the Infrastructure of our Facilities
• Improve Safety & Security for Students and Staff
• Provide Modest Enhancements to improve programs & services
2015 BCS - High School | Mosaic Associates Architects
Infrastructure
Lake Placid Elementary School
2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Replace original 1975 windows and doors
2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Reconstruct exterior masonry columns near Cafeteria
2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Replace elevator cab, reuse existing shaft
2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Reconstruct asphalt paving from Boiler Room to parking lot (regrade)
2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Reconstruct loading dock columns and main beam/concrete slab
Photo of existing sign
Picture or drawing of a digital sign
2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Add DDC control to all UVs
Photo of UV
2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Upgrade main electrical service
2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Roofing – overlay existing (approx. 30,000 sf)
2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Exterior lighting – building mounted, full perimeter
2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Replace original air handler
Lake Placid Middle/High School
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Replace auditorium air handling units
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Replace remaining 1973 unit ventilators
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Convert building from steam to HW. Upgrade heating system – building wide.
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Add ventilation to rooms 316, 316A, 314, 305, and Rm 211 (SED required)
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Replace domestic HW boiler
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct existing roofing, skylights, and roof access hatch over original 1920’s portion of building
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct concrete retaining wall at School Street and adjacent to Olympic Oval
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Replace 1970’s wing windows/insulation
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Upgrade distribution (hallway panels 6ft AFF) and main distribution in basement
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct/overlay exterior stairs (front of building – south side)
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Replace elevator cab (bay state), reuse existing shaft
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct stairs from Cummings Road to front of building (North Side)
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct ramp at 1970 entrance, add canopy & walls to enclose
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct concrete retaining/fencing adjacent to south entrance & loading dock
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Reconstruct sloping retaining wall under 1970 addition
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Replace original exhaust fans and roof vents
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Roofing- re seam/overlay existing (approx. 34,400 sf)
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Exterior lighting – building mounted, full perimeter
2016 Pre-Referendum Study – Horse Show Grounds | Mosaic Associates Architects
Resurface track at Horse Show Grounds.
Safety and Security
Lake Placid Elementary School
2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Provide security vestibule (add roof and wall at elevated walk)
2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Provide impact resistant film on non-tempered doors/windows – building wide interior
2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Provide bullet resistant film on first floor exterior glass
Lake Placid Middle/High School
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Provide security vestibule addition (rear)
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Provide impact resistant film on non-tempered doors/windows – building wide interior
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Provide bullet resistant film on first floor exterior glass
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Provide aisle lighting for auditorium (SED required)
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Auditorium - Replace railing at balcony
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Provide stairs at side of District Office
Enhancements
Lake Placid Elementary School
2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Signage and landscaping
Photo of existing sign
2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Original 1975 Building – Reconstruct restrooms, both floors
2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Glass enclosure, vestibule to loop entrance
Floor Plan
2016 Pre-Referendum Study – Elementary School | Mosaic Associates Architects
Main office reconstruction
Lake Placid Middle/High School
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Build storage under 1975 addition
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Add road access to front of building (part of #16)
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Gym storage addition
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Signage and landscaping (location to be determined)
Lake Placid Middle/High School
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Auditorium - Seating (includes ADA requirements)
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Auditorium - Ceilings/lighting
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Auditorium - Wings/storage area below
2016 Pre-Referendum Study – High School | Mosaic Associates Architects
Auditorium - Sound system
2016 Pre-Referendum Study – Shipman Youth Center | Mosaic Associates Architects
Provide (2) tennis courts at Shipman Site.
2015 BCS - High School | Mosaic Associates Architects
Finances
49 Separate Items ≈ $21 Million
NYS Building Aid of 30% ≈ $6 Million
Total Cost after Building Aid ≈ $15 Million
Annual Cost of Bonded Debt ≈ $1 Million
Total Change to the Annual Budget After 2001 Bond Payoff ≈ $ 0