Transcript

LAPORAN KEGIATAN SUPERVISI KONSTRUKSI

O&M CNG Sei Gelam for peaking 80 MW

LAMPIRAN

1. Dokumentasi cleaning compressorApadapadatanggal3November 2014.

2.

3.

2. Dokumentasi gantiolimesin EngineBpadapadatanggal6 November 2014

3. Dokumentasi perbaikan boiler1padapadatanggal7 November 2014.

4. Dokumentasi perbaikanSolenoide compressorApadapadatanggal10 November 2014.

5. Dokumentasi perbaikanpipasensing upstream PRU 2padapadatanggal 12 November 2014.

6. Dokumentasi perbaikanklem exhaust turbochargerpadapadatanggal 12 November 2014.

7. Dokumentasi perbaikanpipaseinsing upstream PRU 2 padapadatanggal 13 November 2014.

8. Dokumentasi perbaikanRegulator di PRU 2 padapadatanggal 17 November 2014.

9. Dokumentasi perbaikancleaning compressorstage 3padapadatanggal 18 November 2014.

10. Dokumentasi perbaikanklem exhaust turbochargerpadapadatanggal26 November 2014.

PAGE 5Laporan Bulan NOVEMBER2014

PT PLN Enjiniring


Top Related