Slide 1
LEAN TRANSFORMATION STRATEGY MIRAMAR WORLDWIDE REPAIR (MRO)ACE GOLD SITE
1
UTC PROPRIETARY INFORMATION 2
SuppliersInputs ProcessOutputsCustomersAftermarket
UTAS Miramar Worldwide Repair
INTRODUCTION
3CONTENTArea of FocusExecutive SummaryLean PhilosophyActual Indicators8 Success FactorsApproachLessons LearnedTransformation Plan
UTC PROPRIETARY INFORMATION 4FOCUS OF TRANSFORMATION
CURRENT STATE
737-NGEPIDG was selected for Lean Transformation project per product family matrix and PQ analysis. Focus on flow and material delivery.ELECTRIC POWER (EP) SHOP
UTC PROPRIETARY INFORMATION 5AREA OF TRANSFORMATION
Administration Area
AccessoriesMachine ShopShipping/ReceivingShared Services
FacilitiesNDTTestingAvionicsAirbus &BoeingGenerator, Regional & MilitaryRotor Shop
ELECTRIC POWERSite Analysis:Location: Miramar, Broward County, FloridaTotal Area: 85,000 sq. ft.Total employees: 163Salary: 27Hourly: 136Total ACE Associates 121ACE Practitioners > 50% 4Current ACE Level: ACE GOLD Area of focus will be Electric Power
Core business
Over 80% similar processes
PQ Analysis Data
6CONTENTArea of FocusExecutive SummaryLean PhilosophyActual Indicators8 Success FactorsApproachLessons LearnedTransformation Plan
UTC PROPRIETARY INFORMATION 7UTAS Miramar Worldwide Repair
Pierre GouletGeneral Manager
Osvaldo VelazquezBusiness Unit Leader Avionics/IDG/Rotor/Incoming Michael WyckoffFacilities ManagerGeorge Bowman Deputy GM/ACE Manager Kathryn CarlsonContracts & WarrantyRCA Manager
Rogelio ChongBusiness Unit Leader Electric Power & CSDTerry GreeneQuality Assurance ManagerVincent JermanyBusiness Unit LeaderAccessoriesEdgar LopezBusiness Unit Leader Machine ShopPatricia McLaughlinFinance ManagerYadira MonjeEH&SAlicia PamiesHR ManagerRaymond PoynerEngineering & Project Manager
Peter ThomasGEN/MIL/REG Manager
Darlene LorenzoSupply Chain ManagerMANAGEMENT STRUCTURE
UTC PROPRIETARY INFORMATION 8MANAGEMENT SUMMARY Project is on track Performed 3 out of 4 VSMs year to date. Avionics VSM scheduled for 12/11-12/13/2012.
Cell design training complete.
Pilot cell for lean transformation will be Electric Power to be worked jointly with Dijon and Singapore
Metrics impacted will be: CSL % (currently at 97%) TAT (currently at 9 days) Lead Time Labor Times Inventory Turn
ACE/Quality Council meets monthly to discuss project status and milestones
Opportunities exists for Supply Chain in order to meet delivery, packaging, and presentation of parts to support our overhaul & repair lines.
Contracts administration team needs to ensure a seamlessly flow of information to guarantee 100% On time delivery
MIRAMARDIJONSINGAPORE
9CONTENTArea of FocusExecutive SummaryLean PhilosophyActual Indicators8 Success FactorsApproachLessons LearnedTransformation Plan
UTC PROPRIETARY INFORMATION 10IMPROVEMENTS IN LEANCURRENT STATE VSM
EP
623457Current Lead Time3.5 Days
Current Process Time5.04 Days
Current Total Time 8.54 Days
ELECTRIC POWERCurrent State revealed issues in both information and material flow such as contract & quoting, communication, standard work, inventory, and over-processing. Identifying Waste in the Current State1 Transportation 2 Inventory 4 Waiting 5 Overproduction 6 Overprocessing 7 Defects
UTC PROPRIETARY INFORMATION 11IMPROVEMENTS IN LEANFUTURE STATE VSM
EPELECTRIC POWERThe lean principles were used to create flow and eliminate waste. Areas of opportunity included kitting for parts, standard work for SFR, and parts coding. Lean Guidelines in the Future State1 Takt Time 2 Finished Goods Strategy 3 Continuous Flow 5 FIFO 6 Pull System 6- Schedule only one point
Future Lead Time0.5 Days
Future Process Time5 Days
Takt Time55Mins
331572222247UTC PROPRIETARY INFORMATION 12IMPROVEMENTS IN LEANCURRENT STATE VSM
FSFUEL SHOPCurrent State revealed issues in both information and material flow such as contract & quoting, communication, standard work, inventory, and over-processing. Identifying Waste in the Current State1 Transportation 2 Inventory 3 Motion 4 Waiting 5 Overproduction 6 Overprocessing 7 Defects
Current Lead Time10 Days
Current Process Time1.5 Days
UTC PROPRIETARY INFORMATION 13IMPROVEMENTS IN LEANFUTURE STATE VSM
FSFUEL SHOP13Lean Guidelines in the Future State1 Takt Time 2 Finished Goods Strategy 3 Continuous Flow 5 FIFO 6 Pull System 6- Schedule only one point 7- Interval 8- Pitch
234544687Future Lead Time6.25 Days
Future Process Time1.5 Days
Takt Time113 Min
The lean principles were used to create flow and eliminate waste. Areas of opportunity included kanban for parts shortage control, FIFO, pitch, and process combination.
14IMPROVEMENTS IN LEAN
IDEAL STATE
EPELECTRIC POWER CONCEPT
Single Flow Line for IDGsHospitals built into line
15CONTENTArea of FocusExecutive SummaryLean PhilosophyActual Indicators8 Success FactorsApproachLessons LearnedTransformation Plan
UTC PROPRIETARY INFORMATION 16ACTUAL INDICATORS
Business MetricsQualifying 2006Bronze 2007Bronze 2008Silver2009Silver2010GOLD2011 GOLD2012 Improvement from Qualifying Year(As of 2012)Revenue ($)$74.7M$79.9M$86.7M$79.0M$82.9M$87.6M$90.0 M20%EBIT ($)$32.6M$41.2M$48.8M$45.5M$45.9M$47.5M$55.0 M58%Customer Survey5.505.205.756.206.036.306.40Above Gold LevelEmployee SatisfactionN/A55%55%76%76%79%89%44% IncreaseWorkmanship Escapes94613221152098% ReductionSignificant EscapesN/A001100Significant ImprovementInventory Turn (Days)N/A5.515.624.816.276.526.7518% Turn ImprovementCSL (%)77.0%80.0%85.0%88.4%93.2%97.0%97.3%26% ImprovementTurn Around Time (Days)2120171514.510.09.511 days Reduction
17CONTENTArea of FocusExecutive SummaryLean PhilosophyActual Indicators8 Success FactorsApproachLessons LearnedTransformation Plan
18UTC PROPRIETARY INFORMATION EIGHT SUCCESS FACTORS FOR LEAN OPS.
Lean Operations Target Linkage: Control TowerLean Operations Transformation Road MapLean Operations ACE 12.0 Criteria
Lean Operations Process Vision
Lean Operations Toolset
Lean Operations Roles & PeopleLean Operations Competency DevelopmentLean Operations Commitment & Communication
1
2
3
4
8
7
6
5
19UTC PROPRIETARY INFORMATION EIGHT SUCCESS FACTORS
1PROCESS VISION
Site GM, staff and executives share process vision for Lean implementation in MRO. Emphasis on developing a truly lean value stream.
20UTC PROPRIETARY INFORMATION
EIGHT SUCCESS FACTORSTARGET LINKAGE
2
Project KPIs include increased Customer Satisfaction Level to meet 100% on time delivery to be aligned with control tower and corporate compass.
Step 3: Cell Design21UTC PROPRIETARY INFORMATION EIGHT SUCCESS FACTORSTRANSFORMATION ROAD MAP
4
Step 1: Establishing Pull at the Pacemaker
Pacemaker is scheduled/set at only one point
Event ProfilePre-WorkTarget Progress ReportEstablish Flow via FIFO and/or Pull. Follow up on Kaizen Action Items. Standardize all FIFO lanes.
Step 2: Set-up Kitting Zone
22UTC PROPRIETARY INFORMATION EIGHT SUCCESS FACTORS TOOLSET
5
The 13 ACE tools:5SVSMProcess Cert.Std. Work3PTPMSet-up ReductionMFAQCPCRRCAMistake ProofingPassportPolicy Deployment
The ACE Portal is a training interface for the 13 ACE tools. Site ACE Manager uses the ACE tools to develop and train personnel.
23EIGHT SUCCESS FACTORS Roles and Responsibilities
6ACE PilotsACE ManagerSite ManagerRepair Americas DirectorVPSenseiJuan AraujoSteve BorchertDev RudraPierre GouletGeorge BowmanEbner Sanchez & Dayron Morales Provides Corporate Strategy & business goals for Worldwide Repair Worldwide Lean Transformation Manager for site organization Develops action plan for repair sites in North AmericaOversees sites initiatives for lean transformation. Verifies metrics. Develop & execute action plan to meet ACE targets. Create kaizen teams to bring projects & action items to closure.
1. FORM & TRAIN TEAMS2. ANALYZE & INVESTIGATE3. EXECUTE ACTION PLAN
STARTFINISHP1P2P3
24MIRAMAR ACE MANAGEMENT STRUCTURERaymond Poyner Site Pro-Cert ChampionYadira MonjeSite EH&S ChampionTerry GreeneSite QCPC ChampionKathryn CarlsonCustomer MFA ChampionGeorge BowmanDeputy GM/Site ACEManagerMichael WyckoffSite TPMChampionPierre GouletSite General Manager
Roles and Responsibilities
6Electronics*AvionicsElectric Power*MilitaryRegionalGeneratorAirbusBoeingAccessories*PneumaticsHydraulicsFuelActuationRCAMachine ShopShared Services* Indicates a Value Stream
UTC PROPRIETARY INFORMATION 25EIGHT SUCCESS FACTORS Competency Development
7UTAS Miramar Employees : 165Salary : 35Hourly : 130Data as of 11/7/2012Number of ACE AssociatesPractitioner Level Completion %
UTC PROPRIETARY INFORMATION 26EIGHT SUCCESS FACTORS Communication & Commitment
8
Establish a communication plan for all team members (with target dates)
Create cross functional teams
Get buy in from management and employees
Develop a Kaizen Newspaper to identify action items
Create a Project Plan to track, update, and brief both salaried and hourly employees for any changes
Develop a timeline to track project completions
Projects List
2013
Q1Q2Q3Q4
Lighthouse ProjectTraining & EducationPilot CellDry RunsMonitor & ImplementationPhase
26
27CONTENTArea of FocusExecutive SummaryLean PhilosophyActual Indicators8 Success FactorsApproachLessons LearnedTransformation Plan
FIVE PHASESPre-WorkPreparation & AnalysisPre-Work Activities PQ Analysis Product Family Matrix Current State Map Future State Map Site Pre-Analysis Selection of Lighthouse
Phase 1Training ACE VSM Line Back Logistics Leading Lean Cell Design Kanban for Internal Cell Supply Chain & Logistics
ACE Events
Phase 2Phase 3ACE 12.0 CriteriaPilot EventsDesign & Implement Lighthouse Electric Power Cell Design Electric Power Kanban System Design & Implementation Parts Delivery Design & Implementation
Phase 4Implementation
ConceptACE LEAN 12.0 Criteria Apply the lean concepts while concentrating on the following: Plan for every part Optimized Part packaging Visual Pitch Model Cell Design Continuous Flow and/or FIFO Kanban
Phase 5Shop Floor LayoutCreate Kaizen team to deploy the first lean cell design. Focus effort on part family matrix and monitor progress with turn back collection.Start Roll-Out
FIVE PHASES
2014
2014Q4December 31,2014Verification & Implementation
Monitor and verify turnbacks generated by pilot cell Open & Close out projects to resolve turnbacks Best practices implementation Develop strategy to deploy pilot cell throughout the site for 2014
Monitor & Implementation
Lighthouse Communication & ControlQ1March 31, 2014Lighthouse project initiation- Management Communication Set milestones Biweekly meetings to verify milestones Breakdown of unit subassemblies plan
Education &TrainingQ2June 30, 2014All personnel trained and aligned with the lighthouse project.
3P Cell DesignStandard Work Cell Design Kanban Lineback Logistics Leading Lean Apply lessons learned from Dijon and Singapore
Pilot Cell Design
Q3September 30, 2014Lighthouse Dry-runs
Pilot cell design Parts kitting presentation Kanban Parts distribution to pilot cell Completed 3D simulation for pilot cell
Competency Development30UTAS Miramar Employees = 165Salary = 35Hourly = 130ACE AssociateACE Practitioner
31UTC PROPRIETARY INFORMATION
L o c a l A C E O f f i c e
MIRAMAR, FL. U S AACE GOLD SITEL o c a l A C E O f f i c e
M I r a m a r, F l. U S AACE GOLD SITECONTENTL o c a l A C E O f f i c e
M I r a m a r, F l. U S AACE GOLD SITE