Lightning Dock Geothermal
New Mexico Geothermal Energy Working Group Meeting
October 5, 2011
![Page 2: Lightning Dock Geothermal - New Mexico Department of ......Lightning Dock Geothermal. New Mexico Geothermal Energy Working Group Meeting. October 5, 2011](https://reader033.vdocument.in/reader033/viewer/2022043023/5f3ec134e486770cbf21130b/html5/thumbnails/2.jpg)
Lightning Dock Geothermal’s parent, Raser Technologies,
successfully emerged from bankruptcy reorganization.
New name, new company.
![Page 3: Lightning Dock Geothermal - New Mexico Department of ......Lightning Dock Geothermal. New Mexico Geothermal Energy Working Group Meeting. October 5, 2011](https://reader033.vdocument.in/reader033/viewer/2022043023/5f3ec134e486770cbf21130b/html5/thumbnails/3.jpg)
Loca
tion Lightning Dock
Geothermal
![Page 4: Lightning Dock Geothermal - New Mexico Department of ......Lightning Dock Geothermal. New Mexico Geothermal Energy Working Group Meeting. October 5, 2011](https://reader033.vdocument.in/reader033/viewer/2022043023/5f3ec134e486770cbf21130b/html5/thumbnails/4.jpg)
Geo
logy
![Page 5: Lightning Dock Geothermal - New Mexico Department of ......Lightning Dock Geothermal. New Mexico Geothermal Energy Working Group Meeting. October 5, 2011](https://reader033.vdocument.in/reader033/viewer/2022043023/5f3ec134e486770cbf21130b/html5/thumbnails/5.jpg)
Plan
ned
Wel
l Fie
ld
Well – Production
Well –Monitoring OperationsWell – Injection
45-7 (drilled 2011)
55-7 (drilled 1984)
53-7 (drilling now)
![Page 6: Lightning Dock Geothermal - New Mexico Department of ......Lightning Dock Geothermal. New Mexico Geothermal Energy Working Group Meeting. October 5, 2011](https://reader033.vdocument.in/reader033/viewer/2022043023/5f3ec134e486770cbf21130b/html5/thumbnails/6.jpg)
Ligh
tnin
g D
ock
Geo
ther
mal
Pro
gres
s• 2010: Re-enter, drill, and test 55-7 (original deep well)
• 2010 (summer): MT Survey
• 2010 (fall/winter): Interference Pump Test (3 wells)
• 2010: Ormat Term Sheet
• 2011 (early spring): Completed drilling 45-7
• 2011: 3-D Seismic Survey
• Drilling 53-07 (spudding today)
![Page 7: Lightning Dock Geothermal - New Mexico Department of ......Lightning Dock Geothermal. New Mexico Geothermal Energy Working Group Meeting. October 5, 2011](https://reader033.vdocument.in/reader033/viewer/2022043023/5f3ec134e486770cbf21130b/html5/thumbnails/7.jpg)
55-7
RosetteState 3
State Wells
Well – Pumped & Monitored for 2010 TestWell – Monitored for 2010 TestWell – Production
Well –Monitoring OperationsWell – Injection
Inte
rfer
ence
Pum
p Te
st
![Page 8: Lightning Dock Geothermal - New Mexico Department of ......Lightning Dock Geothermal. New Mexico Geothermal Energy Working Group Meeting. October 5, 2011](https://reader033.vdocument.in/reader033/viewer/2022043023/5f3ec134e486770cbf21130b/html5/thumbnails/8.jpg)
Lightning Dock Progress55-7
(Deep geothermal reservoir)
55-7 Discharge / IrrigationDischarge from State Wells
State Wells 3 & 5(shallow)
Inte
rfer
ence
Pum
p Te
st
![Page 9: Lightning Dock Geothermal - New Mexico Department of ......Lightning Dock Geothermal. New Mexico Geothermal Energy Working Group Meeting. October 5, 2011](https://reader033.vdocument.in/reader033/viewer/2022043023/5f3ec134e486770cbf21130b/html5/thumbnails/9.jpg)
Provides information to confirm / select future well sites
Natural “cement cap” isolates the deep geothermal water from the groundwater
Confirms significant faulting and fractures in the deep bedrock
3-D
Sei
smic
![Page 10: Lightning Dock Geothermal - New Mexico Department of ......Lightning Dock Geothermal. New Mexico Geothermal Energy Working Group Meeting. October 5, 2011](https://reader033.vdocument.in/reader033/viewer/2022043023/5f3ec134e486770cbf21130b/html5/thumbnails/10.jpg)
Plan
t -O
rmat
![Page 11: Lightning Dock Geothermal - New Mexico Department of ......Lightning Dock Geothermal. New Mexico Geothermal Energy Working Group Meeting. October 5, 2011](https://reader033.vdocument.in/reader033/viewer/2022043023/5f3ec134e486770cbf21130b/html5/thumbnails/11.jpg)
Nex
t Ste
ps
• Complete injection well
• Multi well interference test early 2012
• Complete well field drilling in 2012
• Begin engineering in 2012
• Final reservoir testing 2012
• Complete construction 2013
![Page 12: Lightning Dock Geothermal - New Mexico Department of ......Lightning Dock Geothermal. New Mexico Geothermal Energy Working Group Meeting. October 5, 2011](https://reader033.vdocument.in/reader033/viewer/2022043023/5f3ec134e486770cbf21130b/html5/thumbnails/12.jpg)
Perm
itti
ng –
Regu
lati
ons
-Inc
enti
ves
• Challenges with the regulations, but agencies anxious to work together for solutions
• Need “one-stop permitting”
• Still too easy to protest and create significant delays without real cause
• New administration supportive and seeking to reduce regulations that unnecessarily delay or inhibit investment and job creation
• Attractive incentives (Tax Credit / Tax Refund)
• Life after 1603?