![Page 1: Local Government Association The need for speed ... meth… · Local Government Association The need for speed: increasing build out rates for new homes 11th October 2018 Insight](https://reader035.vdocument.in/reader035/viewer/2022062919/5ee3b4f2ad6a402d666d631b/html5/thumbnails/1.jpg)
Local Government Association
The need for speed: increasing build out rates for new homes
11th October 2018
Insight into modern methods of construction
Michelle Hannah
![Page 2: Local Government Association The need for speed ... meth… · Local Government Association The need for speed: increasing build out rates for new homes 11th October 2018 Insight](https://reader035.vdocument.in/reader035/viewer/2022062919/5ee3b4f2ad6a402d666d631b/html5/thumbnails/2.jpg)
DEFINING MODERN METHODS OF CONSTRUCTION
![Page 3: Local Government Association The need for speed ... meth… · Local Government Association The need for speed: increasing build out rates for new homes 11th October 2018 Insight](https://reader035.vdocument.in/reader035/viewer/2022062919/5ee3b4f2ad6a402d666d631b/html5/thumbnails/3.jpg)
![Page 4: Local Government Association The need for speed ... meth… · Local Government Association The need for speed: increasing build out rates for new homes 11th October 2018 Insight](https://reader035.vdocument.in/reader035/viewer/2022062919/5ee3b4f2ad6a402d666d631b/html5/thumbnails/4.jpg)
Prefabrication
Modular
Modern methods of construction
Volumetric
Precision manufactured housing
Prefab
Smart construction
Offsite construction
Offsite manufacturing
Factory made housing
Onsite innovation
Alternative delivery Panelised
Component and sub assemblies
![Page 5: Local Government Association The need for speed ... meth… · Local Government Association The need for speed: increasing build out rates for new homes 11th October 2018 Insight](https://reader035.vdocument.in/reader035/viewer/2022062919/5ee3b4f2ad6a402d666d631b/html5/thumbnails/5.jpg)
Category TitleCategory 1 Pre-manufactured 3D structural systemsCategory 2 Pre-manufactured 2D structural systems Category 3 Pre-manufactured non – systemised substructure and superstructureCategory 4 Additive manufacturing – structural and non-structural Category 5 Pre-manufacturing – non-structural assemblies & sub-assembliesCategory 6 Traditional building product led site labour reduction / productivity
improvementsCategory 7 Site process led site labour reduction / productivity improvement
MMC Working Group
![Page 6: Local Government Association The need for speed ... meth… · Local Government Association The need for speed: increasing build out rates for new homes 11th October 2018 Insight](https://reader035.vdocument.in/reader035/viewer/2022062919/5ee3b4f2ad6a402d666d631b/html5/thumbnails/6.jpg)
BARRIERS TO USE
![Page 7: Local Government Association The need for speed ... meth… · Local Government Association The need for speed: increasing build out rates for new homes 11th October 2018 Insight](https://reader035.vdocument.in/reader035/viewer/2022062919/5ee3b4f2ad6a402d666d631b/html5/thumbnails/7.jpg)
Procurement
Traditional approach Alignment to MMC
Procurement carried out post planning Early engagement in design process
Single point of warranty provision Suitability to sub-contracting model
Public sector minimum procurement thresholds Ability to tender through OJEU and frameworks
Fixed price contract Requires detailed design and specification
Decision making weighted to lowest price Not necessarily cheaper from a capex perspective
Delays to contract award Factory overheads without any ‘filler’
Contract and allow design flexibility Early design freeze
![Page 8: Local Government Association The need for speed ... meth… · Local Government Association The need for speed: increasing build out rates for new homes 11th October 2018 Insight](https://reader035.vdocument.in/reader035/viewer/2022062919/5ee3b4f2ad6a402d666d631b/html5/thumbnails/8.jpg)
Funding and Mortgagability
Target launch: Q1 2019
Joint working group with lenders, valuers and the industry to ensure mortgages and building insurance are readily available
across a range of tested MMC.To develop a ‘MMC Scheme’ that will become the minimum benchmark to be able to access mortgage finance and normal
insurance policies.
![Page 9: Local Government Association The need for speed ... meth… · Local Government Association The need for speed: increasing build out rates for new homes 11th October 2018 Insight](https://reader035.vdocument.in/reader035/viewer/2022062919/5ee3b4f2ad6a402d666d631b/html5/thumbnails/9.jpg)
Design standardisation and rationalisation
Offsite manufacturing design code to Design for Manufacturing and Assembly approach at early site development stage.
Ensure that manufacturer parametric design rules are reflected in the tool.
Client concerns around bespoke systems.Wider stakeholder concerns around uniformity.
![Page 10: Local Government Association The need for speed ... meth… · Local Government Association The need for speed: increasing build out rates for new homes 11th October 2018 Insight](https://reader035.vdocument.in/reader035/viewer/2022062919/5ee3b4f2ad6a402d666d631b/html5/thumbnails/10.jpg)
![Page 11: Local Government Association The need for speed ... meth… · Local Government Association The need for speed: increasing build out rates for new homes 11th October 2018 Insight](https://reader035.vdocument.in/reader035/viewer/2022062919/5ee3b4f2ad6a402d666d631b/html5/thumbnails/11.jpg)
Demonstrating social value
‘Social value’ association with using local labour through S106
SMEs
Mayor Construction Academy Scheme
Careers Advice
Local community events
Onsite digital skills
![Page 12: Local Government Association The need for speed ... meth… · Local Government Association The need for speed: increasing build out rates for new homes 11th October 2018 Insight](https://reader035.vdocument.in/reader035/viewer/2022062919/5ee3b4f2ad6a402d666d631b/html5/thumbnails/12.jpg)
WHY USE MODERN METHODS OF CONSTRUCTION?
![Page 13: Local Government Association The need for speed ... meth… · Local Government Association The need for speed: increasing build out rates for new homes 11th October 2018 Insight](https://reader035.vdocument.in/reader035/viewer/2022062919/5ee3b4f2ad6a402d666d631b/html5/thumbnails/13.jpg)
Drivers behind client decision making
Better quality
Improved efficiency
Increased productivity
Accelerate delivery
![Page 14: Local Government Association The need for speed ... meth… · Local Government Association The need for speed: increasing build out rates for new homes 11th October 2018 Insight](https://reader035.vdocument.in/reader035/viewer/2022062919/5ee3b4f2ad6a402d666d631b/html5/thumbnails/14.jpg)
SUPPORT FOR OFFSITE CONSTRUCTION
![Page 15: Local Government Association The need for speed ... meth… · Local Government Association The need for speed: increasing build out rates for new homes 11th October 2018 Insight](https://reader035.vdocument.in/reader035/viewer/2022062919/5ee3b4f2ad6a402d666d631b/html5/thumbnails/15.jpg)
![Page 16: Local Government Association The need for speed ... meth… · Local Government Association The need for speed: increasing build out rates for new homes 11th October 2018 Insight](https://reader035.vdocument.in/reader035/viewer/2022062919/5ee3b4f2ad6a402d666d631b/html5/thumbnails/16.jpg)
![Page 17: Local Government Association The need for speed ... meth… · Local Government Association The need for speed: increasing build out rates for new homes 11th October 2018 Insight](https://reader035.vdocument.in/reader035/viewer/2022062919/5ee3b4f2ad6a402d666d631b/html5/thumbnails/17.jpg)
![Page 18: Local Government Association The need for speed ... meth… · Local Government Association The need for speed: increasing build out rates for new homes 11th October 2018 Insight](https://reader035.vdocument.in/reader035/viewer/2022062919/5ee3b4f2ad6a402d666d631b/html5/thumbnails/18.jpg)
![Page 19: Local Government Association The need for speed ... meth… · Local Government Association The need for speed: increasing build out rates for new homes 11th October 2018 Insight](https://reader035.vdocument.in/reader035/viewer/2022062919/5ee3b4f2ad6a402d666d631b/html5/thumbnails/19.jpg)
Thank You
![Page 20: Local Government Association The need for speed ... meth… · Local Government Association The need for speed: increasing build out rates for new homes 11th October 2018 Insight](https://reader035.vdocument.in/reader035/viewer/2022062919/5ee3b4f2ad6a402d666d631b/html5/thumbnails/20.jpg)