LS1 DayEN-CV
M. Nonis on behalf of CV group / CERN - 12.06.2012
Contents• Introduction• Projects for LS1
– PS and Meyrin site– LHC and Experiments– SPS– North Area
• Overview on maintenance• Operation
2M. Nonis - LS1 Day - 12.06.2012
PreambleThe object of this presentation is to show what will be done by CV Group during LS1 with respect to the requests received and consolidation needs; the focus is made mainly in the projects that cannot be performed during LS1.In addition, some activities (projects, maintenance) that have a major impact in the availability of circuits will be mentioned in order to allow everyone to have the full picture of the constraints to face in LS1.The presentation is divided in geographical zones, almost corresponding to the different machines complex.In this talk we take into account requests created in Plan.cern until Wednesday 5th June; later ones are not included and not accepted at today.
3M. Nonis - LS1 Day - 12.06.2012
I n
t r
o d
u c
t i
o n
Terms and Definitions
When is LS1 for CV?
In order to be able to allow the cool down of LHC and the powering tests, the LS1 for CV Group is from January to December 2013.We are requested that in 2014, all plants linked to the run of any accelerator shall be operational, only maintenance work will be allowed in view to minimize the time without maintenance until December 2015.
4M. Nonis - LS1 Day - 12.06.2012
I n
t r
o d
u c
t i
o n
General overview of CV ActivitiesPS + Meyrin SPS + NA LHC + Exp Total
Consolidation 4 / 1 / 2 10 / 0 / 6 30 / - / 2 55
Upgrade existing plants 5 / 3 / 1 2 / 1 / 1 16 / - / 0 29
New requests/plants 13 / 6 / 3 3 / 3 / 4 8 / - / 4 44
Not clear requests 24 24
Total 152
Operation interventions 33 / 11 / - 12 / - / - 10 / - / - 64
CV maintenance (hrs*) 15000 / 12000 24000 / 18000 64000 / 54000 103000 / 84000
Activities confirmed for 2013 (CV LS1) 91 60% Activities that will start in 2014 14 10%Activities postponed after 2014 23 15%Pending requests 24 15%49% of request not declared before end May
* Base 2012: 71’000 hours
5
I n
t r
o d
u c
t i
o n
6
Other figures• New major supply & installation contracts: 26• Massive use of existing contracts: > 50 orders
– Number of additional contractors’ staff depends on final dates of maintenance interventions but it can’t be considered unlimited (supervision work for CERN, need to know circuits before working on them).
General Organization CV• External help from INFN for engineering activities?
– Ok on some projects – not on any– Time is (almost) late, decision is more than urgent.
• During LS1 all possible resources will be moved from operation activity to work supervision.
• However, the maintenance workload will increase.• Operation requests: most of the dates are not defined so that we cannot
confirm whether they can be satisfied according to installation availability, or if they cumulate at the same period and represent a too high workload.
• It will not be possible to cumulate the workload for projects and maintenance (and operation) in the same period, therefore maintenance work must be distributed all along the 12 months of 2013. This implies that maintenance will not be limited to the very first few months of 2013.
7M. Nonis - LS1 Day - 12.06.2012
I n
t r
o d
u c
t i
o n
Demin. Water make up from bldg 378
Simplified Scheme CV Cooling Circuit
8M. Nonis - LS1 Day - 12.06.2012
I n
t r
o d
u c
t i
o n
Test & CommissioningGiven the quantity of CV systems concerned and the important modifications to be performed, the test & commissioning of each CV plant will be a major activity requiring several days per plant.In addition, each equipment Group will need to test & commission his equipment before considering his work completed.During each of these steps the effort required to CV team is not negligible (drain, fill up, balancing of circuits…) and, only after their successful completion, CERN can enter the commissioning phase of each accelerator.
I am convinced that all this should not be under evaluated.
9M. Nonis - LS1 Day - 12.06.2012
I n
t r
o d
u c
t i
o n
Done in LS1Not done in LS1
nTOF
ELENA
ISOLDE
PSB
L4
FAIR
Meyrin - PS
10M. Nonis - LS1 Day - 12.06.2012
Pro
jec
ts i
n L
S1
LINAC 4• HVAC plant is completed July 2012• Cooling plant is completed September 2012
The decision of delaying the commissioning phase of L4 of 1 year does not have an effect on the CV installation work; however it will avoid clashes between operational needs for L4 and CV maintenance/project work during 2013.
11M. Nonis - LS1 Day - 12.06.2012
Pro
jec
ts i
n L
S1
ISOLDECOOLINGHVAC
building 197
Cooling – Dec 12 to May 13:
1 circuit for existing + extension, 27-37°C
1 circuit for BTY magnets (RP safety), 27-37°C
1 circuit for RF cavities, 20-30°C (primary: chilled water)
• Ventilation – Sept 12 to Febr 13:
Bldg 170, 199, 198
Faraday cage
Cryo cold box
Air conditioning Labo class C bldg 115
Refurbishment existing station (open loop): no
cooling possible until June 2013
12
Pro
jec
ts i
n L
S1
Other ISOLDE activitiesCV work (design and installation) linked to the following requests:• New ventilation for the extension of storage for target
area• ISOLDE robot installation• Hot cell installation• Integration of Rabit in the ventilation system
to be moved during 2014 or later if not compatible with beam program.
13M. Nonis - LS1 Day - 12.06.2012
Pro
jec
ts i
n L
S1
Other Projects• ELENA: ventilation new building• nTOF EAR2: ventilation new building
DESIGN ACTIVITIES WILL START BEGINNING 2014 AND WORK PERFORMED ACCORDING TO THEIR COMPLEXITY AND THE TIME SLOTS MADE AVAILABLE BY 2014 RUNS.
14M. Nonis - LS1 Day - 12.06.2012
Pro
jec
ts i
n L
S1
Meyrin + PS - Requested Projects2013 Start in 2014 Start Later
L4 OK
PSB new circuits OK (dump) X (HVAC - bldg) X (water - bldg)
PSB new connections (MSC) pending
PS new connections (TS15 – ABT, longitudinal damper – RF)
pending
New bldg 107 OK
ISOLDE OK (HIE) X
nTOF X
ELENA X
Laboratories, halls:• EPC (269, 171, 363, 287…)• EL (Diesel, 192)• FAIR• New HUB – IT Dept.• CLIC (185)
XXXXX
15M. Nonis - LS1 Day - 12.06.2012
Pro
jec
ts i
n L
S1
PS Ventilation: Planning• Dismantling: 4 weeks• GS/SE room repairs: 2 weeks• Ventilation work: 3 months• Overall duration per local: 5 months
• Parallel work on 4 technical rooms (ideally)
• Installation fresh air 353: Jan-Feb 2013
• Reduced ventilation during all work duration
Dismantling CommissioningInstallation16
Pro
jec
ts i
n L
S1
Chilled Water: Concerned Areas
Priority 2
Priority 1
Already done!
• First phase, completion in LS2• Work duration: around 6 months• Stop of chilled water plant:
• LINAC3 cooling• Ventilation of PS complex bldgs.
17
Pro
jec
ts i
n L
S1
• Consolidation of the demineralized water production station for all CERN; power and control cubicles for cooling circuits ISR, nTOF, chilled water concerned.
• Duration: – 6 months with 3 months of full stop (May till mid August)– 4 weeks stop of cooling circuits.
Consolidation Bldg 378
NO circuit make up or refill in any CERN complex possible: WHAT IS FULL, STAYS FULL, WHAT IS EMPTY (because of drain, leaks…) CANNOT BE FILLED strong impact in operating and in start up of any circuit between May to August + the delay to refill all the circuits throughout CERN.
18
Pro
jec
ts i
n L
S1
LHC
Done in LS1Not done in LS1
SMS18
SL53 offices
UPS bldg Pt 2
New offices
New bldg + data center
SR1, SR5 cooling circuits
ECAL circuit
19M. Nonis - LS1 Day - 12.06.2012
Storage bldg
Pro
jec
ts i
n L
S1
SR1 clean room
LHC + Exp - Requested Projects2013 Start in 2014 Start Later
R2E X
Collimators (incl. walls Pt 7) X
Chilled water upgrade Pt 2 X X
Back up cooling towers (cryo) X
New cooling circuits SR1 SR5 - EPC X
Cooling circuits racks BE-BI in SRs X
Modification control SVC for EPC X
SR1 clean room modification X
Pt 18: ventilation storage bldg + SMS18 X
Modification controls ATLAS X
Modification CMS ECAL cooling circuit X
Ventilation ALICE L3 X
ALICE cooling jacket X
HR% control in USA15 X
Detector cooling work (ALICE, ATLAS, CMS) X
Consolidation air conditioning control room LHCb X
New office bldgs for ALICE; CMS, LHCb (GS)
Mixed water circuit USA15, SR1, SDX1 X (*)
(*): workload needed might be a blocking point 20M. Nonis - LS1 Day - 12.06.2012
Pro
jec
ts i
n L
S1
Circuit concerned Works Consequences
ATLAS Muons, TRT, cables, LAr, Tile
September 2013 No cooling on concerned circuit
ALICE TRD, TPC March 2013 No cooling on concerned circuit
CMS Electrical system,Brine, SS, Compressed air
First 2: March 2013Third: September 2013
No cooling on concerned circuit
Detector Cooling Work
21M. Nonis - LS1 Day - 12.06.2012
Pro
jec
ts i
n L
S1
One Typical CV InstallationPowering and ELQA tests prior to Warm-up (4+4 d)
• qualify circuits except mains to 7TeV• fault localization..• CSCM (1 sector)
Warm-up: incl. vacuum leak tests at 80K (1wk) to localize leaks
Extended Maintenance (stop)
Powering tests
From an original idea by K Foraz
? ?
Work, test, commissioning (stop)
Maintenance (lighter)
Preparation for cool-down
22
Pro
jec
ts i
n L
S1
Equipmentand cabling
PLCsand code
PCVue, PVSS
Projects on Controls• PCVue- Upgrade PCVue: USC55 water, DC plants,
UAPT, SFs, BAs, cooling PS.• Wizcon- Migration Wizcon: Cooling CNGS, cooling
USA15, ventilation ATLAS, CMS, CNGS, cooling PS EST-SUD.
• Replacement of Wizcon by UNICOS, SCADA, PLC- LHC cooling: SFs, UWs- LHC HVAC surface bldg. Pt 1, 18, 4, 5, 6, 8.- 378 cooling towers- SPS 863 towers
• Schedule- Preparation of test on platform before LS1.- Deployment/downtime 1 to 2 week/project.- Planned: end of each plant maintenance
Sup
ervi
sion
Pro
cess
co
ntro
lF
ield
23M. Nonis - LS1 Day - 12.06.2012
Pro
jec
ts i
n L
S1
Cooling Towers Availability
Point 1
Point 8
Point 6
Point 4
Back up cooling towers for cryo: downtime 2 weeks/PointMaintenance work: duration 2 months/PointControls modifications: duration 1 week/Point
Back up work Maintenance
Point 1 October 2013 June to August 2013
Point 2 n.a. August to mid October 2013
Point 4 August 2013 October to mid December 2013 (including new primary pumps)
Point 5 n.a. December 2013 to January 2013
Point 6 March 2013 April to June 2013
Point 8 June 2013 February to April 201324M. Nonis - LS1 Day - 12.06.2012
Pro
jec
ts i
n L
S1
Pumps Replacement in UWsFurther increase of flow ratein the sectors shall requirechange of all piping.
Planning• Work duration: 2 months per UW• During work no cooling for UPS in REs• UW25 and UW85: not refilled until mid August (bldg
378 project). • UW65 no spare days in planning for filling circuit before
bldg 378 project25M. Nonis - LS1 Day - 12.06.2012
Pro
jec
ts i
n L
S1
SPS
Done in LS1Not done in LS1
26M. Nonis - LS1 Day - 12.06.2012
Pro
jec
ts i
n L
S1
Bypass BA2New RF bldg
New cell cooling towers
Consolidation Valves BAsBuldings Valve supply Valves
returnValves
hydrantsDisconnectors
BA1 x x
BA2 x x x x
BA3 x x n.a. n.a.
BA4 x x x x
BA5 x x x x
BA6 x x x x
BA7 & Point 1.8 x x x x
27M. Nonis - LS1 Day - 12.06.2012
Pro
jec
ts i
n L
S1
SPS Cooling Towers• Carbonatation of concrete + waterproofing of basins GS/SE:
– Civil engineering works: 3 months complete stop from March 2013
• Complementary work for CV:– Equipment dismantling (fans, gearboxes, motors, packing etc.) and remounting.– Start 21 January 2013 cells 1 and 2 (cells 3 and 4 to remain in service). Cooling
tower can remain in service until end February/beginning March 2013 and will return to service end May 2013
– On completion of civil engineering works 3 weeks to return to service with 2 cells operational
• Storage:– outside, fencing required to prevent packing being displaced by strong
winds– packing volume 550 m3 - 1242 pieces at 30cm x 120cm x 32cm– Miscellaneous equipment 80 m2
28M. Nonis - LS1 Day - 12.06.2012
Pro
jec
ts i
n L
S1
Availability of SPS Loop• Carbonatation of cooling towers• Replacement of valves and fire fighting disconnectors
SPS loop has to be emptied (difficult task):• 4 months at least starting from March-April 2013• No fire hydrants in SPS complex (BAs)• Point 18 cooling towers stopped (budget requested to
solve problem in 2012)• Waste water discharge from each BA and cooling towers
North Area?• Air conditioning BA1 and BA5 affected
29M. Nonis - LS1 Day - 12.06.2012
Pro
jec
ts i
n L
S1
Prevessin, North Area
Done in LS1Not done in LS1
30M. Nonis - LS1 Day - 12.06.2012
Pro
jec
ts i
n L
S1
NA62
TDC2 – TCC2 HVAC
Consolidation chilled water
CCC HVAC Upgrade• BE91 construction - completion in
May 2013;• Demolition of bldg. 936 and
construction of new bldg. 774;• Primary water modifications for
BA3 and future BAF3; • GS replacing area drains;• Space will be highly constrained -
workspace, material storage, unloading, crane maneuvering, car parks, waste sorting and collection.
HVAC shutdown for final connection and testing (CCC will remain operational).
2 – 27 September 2013
Commissioning (perturbations) 30 September – 18 October
31M. Nonis - LS1 Day - 12.06.2012
Pro
jec
ts i
n L
S1
NA62• Ventilation surface premises: completed 2012
• T10 Cooling station: completed 2012
• Ventilation underground TCC8 and ECN3: work between December 2014
– March 2015 (pending derogation from RP for 2014 run).
• Surface racks cooling: design start beginning 2014 - 3 months delay
• Cooling Gigatracker: design start beginning 2014 - 3 months delay
32M. Nonis - LS1 Day - 12.06.2012
Pro
jec
ts i
n L
S1
SPS + NA - Requested Projects2013 Start in 2014 Start Later
Consolidation HVAC CCC X
BE91 - EL X
SPS Upgrade – BA3 work - RF X X
Refurbishment cooling towers (GS)
Consolidation drain TT20 X
NA62:• HVAC ECN3• Cooling racks• gigatracker
XXX
Consolidation HVAC TCC2 / TDC2 X
North Area consolidation X
BA2 bypass - EPC pending
Cooling renovation LSS1 dump - EPC pending
Compressed air sectorization SPS_IVM, sectors X10 and X60, 136, 142 - VSC
pending
33M. Nonis - LS1 Day - 12.06.2012
Pro
jec
ts i
n L
S1
ONE COMMON ACTIVITY: MAINTENANCE
one complete intervention in 2013one lighter intervention in 2014
…..and its impact
M. Nonis - LS1 Day - 12.06.2012 34
2013 2 months
2014 3 weeks (cryo excepted)
2013 1 month
2014 2 weeks
2013 1 month
2014 2 weeks
2013 1 week
2014 1 day
CV Installations’ Availability – Any Complex
M. Nonis - LS1 Day - 12.06.2012 35
Ma
inte
na
nc
e
Maintenance Planning for LHC Experiments
• ATLAS: June to September 2013• ALICE: June to September 2013• CMS: November 2012 to January 2013• LHCb: January to April 2013
M. Nonis - LS1 Day - 12.06.2012 36
Ma
inte
na
nc
e
Functional Tests
• CV needs to perform functional tests in order to ensure the functionality of the installations during operation:– Safety tests or back up;– Valves manipulation (e.g: in concrete
floor);– Degraded mode scenario (ventilation
systems);• During maintenance and tests, the
availability of CV services shall be affected and/or stopped.
• Estimated 1-2 days per Point
37M. Nonis - LS1 Day - 12.06.2012
Ma
inte
na
nc
e
M. Nonis - LS1 Day - 12.06.2012
REQUESTS FOR OPERATION OF CV SYSTEMSIN 2013
38
CV Services Available during LS1• CV will ensure only essential services:
– Ventilation of underground and surface premises (tunnel, experimental areas, buildings…) but not the ones dedicated to specific equipment.
– Chilled water only for ventilation purposes– Compressed air– Raising systems– Drinking water supplies– Fire hydrants network
• Temporary stop of these installations might take place according to modification work or maintenance interventions to be performed.
Op
era
tio
n
39M. Nonis - LS1 Day - 12.06.2012
Operation 2013Requests received have not enough details: “need water for 130 weeks from December 2012”. Received requests (full list):• PS• LINAC 2, 3 and 4• CTF3• Cloud• ISR area• AD• RF (mainly SPS)• CAST• CMS, LHCbThese requests can be satisfied provided that they do not clash with the planning for projects and maintenance.Requests 2014 are ok: maintenance interventions will be adapted accordingly.
40M. Nonis - LS1 Day - 12.06.2012
Op
era
tio
n
Conclusions
M. Nonis - LS1 Day - 12.06.2012 41
Still lot of details have to be defined.
Present situation is tight but CV is confident we can succeed.
What we do not know is whether the picture we have is complete or someone has still to show up and formulate additional requests. This is the most sensible and urgent point: CV has to evaluate, launch or complete the studies now, there is no possibility to change direction in a few weeks.
Thank you for your attention
Questions? 42M. Nonis - LS1 Day - 12.06.2012