8/14/2019 Manavgat River Alternative Water Resource _prez Grer
1/24
MANAVGAT RIVER WATER AS A LIMITED
BUT ALTERNATIVE WATER RESOURCE FORDOMESTIC USE IN MIDDLE EAST
T.C
GAZ UNIVERSITY
Faculty of Engineering and ArchitectureDepartment of Civil Engineering ,
Hydraulics Section
BRAHM GRER
MEHMET LGER
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
2/24
INTRODUCTION
MANAVGAT RIVER WATER SUPPLY PROJECT
WATER EXPORT FROM MANAVGAT RIVER
INDEX
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
3/24
MANAVGAT RIVER
Manavgat Riveroriginates from theeastern slopes of
Western TaurusMountain (with anaverage flow of 156m3/s) and flows intoMediterranean Seaafter following about90 km distance to
south.
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
4/24
MANAVGAT RIVER WATER SUPPLYPROJECT
500.000 m3/day
147 Million US $
Water Amount and
Expected Cost
Supply water both toTurkey and othercountries.
Aim of The Project
22.January 2000Completed
April 1992Starting Date
DS, 2001
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
5/24
DS,2001
The Plan and Flow Diagram of Manavgat River Water Supply Project
DSI, 2001
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
6/24
DS,2001
Hydraulic Flow Diagram
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
7/24
Water intake structure ofManavgat Dam is situated onapproximately 800 mdownstream of Manavgat
Dam. Water taken from thelevel of + 8m is pumped upinto balancing and aeratingtank that is located
approximately at the level of+ 68 m.s.l
LGER, 2004
Water intake Structure and Raw WaterPumping Structure
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
8/24
Air Tanks
DS2x50:100 mCapacity Of
Air Tanks
F 700 mmDiameter Of
Pumping Pipes
F 800 mmDiameter OfSuction Pipes
7Number OfSuction Pipes
2.15 mSuction Head
DSILGER 2004
DS,2000
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
9/24
Raw Water Pumping Structure
75 mTotalPumpingHead
900 KwEffectivePower
967 lt /secCapacity Of
Pumps
7 + 1Number OfPumps
DS, 1998
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
10/24
Pumping Mains
Water taken from raw waterpumping mains is transferred
to the balancing and aeratingtank by means of elevation line
PEOuter Coating OfPipes
Icoment Added
Concrete
Inner Coating Of
Pipes
Spiral Welded
Steel Pipe
Type Of Pipes
1000 mLength Of Pipeline
8,8 mmWall
Thickness
1200 mmDiameter Of
Pipes
2Number Of
Pipes
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
11/24
Balancing And Aerating Tank
Pumping Mains
Balancing Tank
Aerating Tank
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
12/24
Treatment Plant
Components Of The Treatment Plant
Rapid mixers and flocculation tanks
Clarifiers
Rapid sand filtration units
Chlorination contact tank and clean water tank
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
13/24
Mehmet lger 2004
Clarifiers
Rapid sand filtration unitsChlorination Tubes
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
14/24
Gravity Mains
DS, 2001
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
15/24
Valve Control Chamber and Pumping Station
Valve Control Chamber is
designed to load 250 000m refined water and 250000 m raw water or 500000 m raw water
simultaneously to twodifferent tanks. Also thereare totally 12 pumps withthe capacity of 1 m/sec,
10 mains and 2 substitutesto pump water to the tanks
Mehmet lger 2004
LGER 2004
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
16/24
Off-Shore Pipelines
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
17/24
SPM (Single Point Mooring ) Structures
DS
Loading from SPM terminals to the tankers can be performedaccording to the following options,
- From one SPM 250 000 m/day refined, from the other SPM 250 000m/day raw water,
- From each pontoon, 250 000m/day raw water- From each pontoon, 125 000 m/day refined water and total 250 000m refined water
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
18/24
RAW WATER ANALYSIS REPORT
DS,2001
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
19/24
Quality of the refined water conforms to all the specified requirements of DrinkingWater Quality Guide of TSE (Turkish Drinking Water Standard) and
WHO (World Health Organization).
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
20/24
CURRENT STATE OF THE PROJECT
Project is ready to work and supplywater with its every unit.
Also it has been in the scope of privatizationof Privatization High Council Decision dated23.02.2004.
It was decided that privatization procedureswould be completed in 12 months.
.
www.oib.gov.tr
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
21/24
PROJECT OF WATER EXPORT FROM
MANAVGAT RIVERAnnual capacity of Manavgat River
5x109 m
Manavgat River Water SupplyProject
180x106 m
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
22/24
Water Sale To Israel And Alternatives Countries
For Marketing Of Water from Manavgat RiverWater Supply Project
Manavgat
DS, 2001
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
23/24
CONCLUSON
As a conclusion it can be stated that, for thewater scarcity problem of Middle East countries,
Manavgat River Water Supply Project ofTurkey, can be viewed as an alternative butpartial solution.
-
8/14/2019 Manavgat River Alternative Water Resource _prez Grer
24/24
Thank You
ForYour Patience