Methodologies followed in late 60s for software
Development The Software was developed on a Trial & Error basis.
No Specific Process was followed during the development of the Product.
Defects were detected only after the product is delivered to the external Users.
This resulted in software crisis
Software fail to meet user requirements.
Software's used to crash frequently.
Development of Software became expensive.
Software became difficult to alter, debug, and enhance.
The Software was often delivered late.
Software use resources non-optimally..
-
8/3/2019 Manual Testing - Day 1- SDLC Phase
3/12
STATZONEWe deliver the ultimate need of yours
Some Root Causes for Failure
Inaccurate understanding of end-user-needs
Adhoc requirements management
Ambiguous and imprecise communication
Overwhelming complexity
Undetected inconsistencies in requirements, design and implementations
Insufficient testing resulting in late discovery of serious flaws
Poor software quality
Failure to attack risk
Insufficient use of automation tools
-
8/3/2019 Manual Testing - Day 1- SDLC Phase
4/12
STATZONEWe deliver the ultimate need of yours
.
SDLCSDLC
Requirements
BusinessReq.
Development
Code/Build
Maintenance
Analysis
FunctionalSpec. Design
Spec
Testing
UnitTesting
SystemTesting
Performance
Implementation
-
8/3/2019 Manual Testing - Day 1- SDLC Phase
5/12
STATZONEWe deliver the ultimate need of yours
Inception Phase
Request for Proposal
Proposal
Negotiation
Letter Of Intent (LOI) some companies may do this
along with a feasibility study to ensure that everything is correct,
before signing contract
Contract
-
8/3/2019 Manual Testing - Day 1- SDLC Phase
6/12
STATZONEWe deliver the ultimate need of yours
Requirements phase
This is also known as feasibility study. In this phase, the development /Testing teamvisits the customer and studies their system. They investigate the need for possible
software automation in the given system. By the end of the feasibility study, the teamfurnishes a document that holds the different specific recommendations for thecandidate system.
The requirements gathering process is intensified and focused specially on software. Tounderstand the nature of the program's to be built, the system engineer ("analyst")must understand the information domain for the software, as well as required function,behavior, performance and interfacing. The essential purpose of this phase is to find theneed and to define the problem that needs to be solved .
Note: We have different naming for requirement document F.S - Functional
Specification, SRS Software Requirement specification, URS User Requirements
Specification, BRD Business Requirement document. Etc.
-
8/3/2019 Manual Testing - Day 1- SDLC Phase
7/12
STATZONEWe deliver the ultimate need of yours
Design phase
In this phase, the software development process, the software's overall structure and its fine
distinction are defined. In terms of the client/server technology, the number of tiers needed forthe package architecture, the database design, the data structure design etc are all defined inthis phase. A software development model is created.
Analysis and Design are very crucial in the whole development cycle. Any glitch in the designphase could be very expensive to solve in the later stage of the softwaredevelopment. Much care is taken during this phase. The logical system of the productis developed in this phase.
The below are the list of activities done in the phase
High Level Design (HLD)
List of modules and a brief description of each module.
Brief functionality of each module.
Interface relationship among modules
Dependencies between modules (if exists, B exists etc.)
Database tables identified along with key element.
Overall architecture diagrams along with technology details.
-
8/3/2019 Manual Testing - Day 1- SDLC Phase
8/12
STATZONEWe deliver the ultimate need of yours
Design phase
Low Level Design (LLD)
Details functional logic of the module, in pseudo code.
Database tables, with all elements, including their type and size
All interface details with complete API references (both requests and responses)
All dependency issues Error message Listings
Complete input and outputs for a module.
-
8/3/2019 Manual Testing - Day 1- SDLC Phase
9/12
STATZONEWe deliver the ultimate need of yours
Coding phase
The design must be translated into a machine-readable form. The code generationstep performs this task. If the design is performed in a detailed manner, code
generation can be accomplished without much complication. Programmingtools like Compilers, Interpreters, Debuggers are used to generate the code.
Different high level programming languages like C, C++, Pascal, Java are used for
coding. With respect to the type of application, the right programminglanguage is chosen.
-
8/3/2019 Manual Testing - Day 1- SDLC Phase
10/12
STATZONEWe deliver the ultimate need of yours
Testing phase
Once the code is generated, the software program testing begins. Different testingmethodologies are available to unravel the bugs that were committed during
the previous phases. Different testing tools and methodologies are alreadyavailable
In this phase we would have already Followed up the STLC. Based on the
organization standards and the client requirement, the process arestandardized.
-
8/3/2019 Manual Testing - Day 1- SDLC Phase
11/12
STATZONEWe deliver the ultimate need of yours
Implementation phase
This is the sixth (and sometimes last) Phase in the SDLC. This Phase will provide users withthe documentation and training required to use the system effectively.
In addition, user and operation procedures are tested for the system.
Refer to the System Implementation standards and documentation for a more detailed
description of the deliverables associated with this Phase
-
8/3/2019 Manual Testing - Day 1- SDLC Phase
12/12
STATZONEWe deliver the ultimate need of yours
Maintenance phase
Software will definitely undergo change once it is delivered to the customer. There are manyreasons for the change. Change could happen because of some unexpected input values
into the system.
In addition, the changes in the system could directly affect the software operations. Thesoftware should be developed to accommodate changes that could happen during the
post implementation period.
In Simple software undergoes
Bug fixing
Upgrade