Massachusetts Water Resources Authority
Residuals Treatment Facilities
Massachusetts Water Resources Authority
Residuals Processing – Schematic Overview
•
4
Massachusetts Water Resources Authority
Residuals Processing Statistics for Deer Island
• Sludge to Digestion – 246 dry TPD– 70% as Primary sludge – from gravity thickening– 30% as Waste Secondary sludge – from centrifuge thickening
• Typical sludge makeup of other plants: 50:50
– Time in Anaerobic Digestion: • 18-21 days
– 62% Volatile Solids destruction • (industry ave. is 50%)
5
Massachusetts Water Resources Authority
Residuals Processing Statistics for Deer Island
• FY14 Annual Avg digester gas production – 188 kscfh– 96% of gas is beneficially used in boilers– 95% of total boiler heat attributable to Digas
• Value of gas utilization - $21.3M (heat) & $2.3M (power)
6
Massachusetts Water Resources Authority
Overview of Current Residuals Processing
• Sludge to Pellet Plant – 100 dry TPD– On DITP, Digested sludge is stored, then pumped 7 miles to Pellet Plant
• Methane gas captured, stored, then used in boilers on site– NEFCO dewaters, dries, & pelletizes all digested sludge
– All pellets go to beneficial re-use:• turf farms • golf courses • fertilizer blenders • cement kiln
7
2005 2006 2007 2008 2009 2010 2011 2012 2013 201490
95
100
105
110
115
Average Daily Sludge to Pellet Plant (DTPD)
• Located in Fore River Shipyard
• Designed, Constructed & Ownedby MWRA– Phase I – $88 M– Phase II - $45 M– Total cost - $133 M
• Since Day 1, has always been a Contract Operation– Contract 1: 1991 – 2001 Competitive Bid – NEFCo– Contract 2: 2001 – 2015 Competitive Bid - NEFCo
MWRA Pellet Plant located in Quincy, MA
8
• Current contract - S345 – 15-year (2001-2015)
• Process liquid sludge from DITP – Receive digested sludge– Dewater with centrifuges– Dry with thermal dryers– Produce Class A Fertilizer Pellet
– In CY 2014:• Processed 100 dtpd• Paid NEFCo $14.1M
Pellet Plant – Contract O&M Since 1991 (cont.)
9
• Contractor is responsible for developing & maintaining Diverse Markets for beneficial reuse for all sludge sent to the Pellet Plant– Land Application– Fertilizer Blenders– Alternate Fuels– Bay State Fertilizer Program
• Maintain Facility & Equipment– Responsible for returning
a fully operable plantat the end of the contractto MWRA.
Pellet Plant – Contract O&M Since 1991 (cont.)
10
Land Application
Fertilizer Blenders
Alternate Fuel
Bay State Fertilizer Program
11
State Annual Tonnage Percentage
Connecticut 6,811 22%New York 5,678 18%Indiana 3,090 10%Maine 2,170 7%Rhode Island 1,835 6%Florida 1,665 5%Virginia 1,554 5%Massachusetts 1,439 5%Georgia 1,332 4%Vermont 1,175 4%Pennsylvania 1,025 3%Ohio 980 3%Maryland 980 3%Missouri 590 2%North Carolina 328 1%Michigan 259 1%Bagged/truck 106 0.3%
Pellet Distribution by State
12
Comparison of Pellet Molybdenum Concentrations to DEP Limit
Jan
'12
Apr'12
Jul'12
Oct '12
Jan
'13
Apr '13
Jul '13
Oct '13
Jan
'14
Apr '14
Jul '14
Oct '14
0%
50%
100%
150%
200%
Monthly Pellet Molybdenum Concentrations(Expressed as a % of DEP Type I Limit)
Step 1: Condition Assessment• Facility is in excellent condition
– 20+ year life remaining with no major capital
(with continued maintenance)
Step 2: Residuals Technology Assessment• Recommendations at DITP
– May impact quality & quantity of sludge sent to Pellet Plant
• Recommendations at Pellet Plant– Limited to energy efficiency gains given
condition of facility
Pellet Plant – Contract Renewal Preparation
13
Technology Assessment Recommendations (cont.)
– Consider larger, more efficient Dryer Trains• Implemented at Philadelphia & soon Detroit
– Evaluate impacts of co-digestion programs at DITP
– Given long remaining life, any capital expense
decisions must rely on payback
– Recommend 5-year extension to quantify impacts
of pilots and new dryer ops
– Suggested next long-term contract – 15 years
Pellet Plant – Contract Renewal Preparation Step 2 (cont.)
14
Pellet Plant – Existing Contract with NEFCo
15
Current Contract Cost Structure
• Fixed Fee first 90 dtpd (32,850 dry tons annually) (~$400/ton)• Excess Qty >90 dtpd (>32,850 dry tons annually) (~$280/ton)
• Fixed yearly capital dollar value (pre-determined)• No pass-throughs for utilities
– Includes adjustments for inflation
• FY14 Avg - ~$380/ton
Pellet Plant – NEFCo Contract Extension
16
Contract Cost Structure – Sludge Processing (changes)
Original Contract Contract Extension Change• Fixed Fee first 90 dtpd annual (32,850 tons/yr) same base price but for 92.5 dtpd• Variable Fee >90 dtpd same incremental price >92.5 dtpd
• CY2014 Total contract expenses $14,090,654
$13,582,354 for sludge processing $13,334,464 if on extension- $12,574,468 base + = same base + - plus $1,007,886 excess qty plus $759,996 excess qty
Savings of $247 K in year.+ $508,300 capital expenses
Pellet Plant –NEFCo Contract Extension – Capital Program
17
• Capital Program - $7.0 Million cap
• $6.087 K – project awards subject for future Board approvals• NEFCo designs all capital projects – paid 15% of awarded project
• NEFCo responsible for capital costs in excess of $7.0 M cap• Must return a fully operational plant at end of contract• Drum replacement not included in cap if completed.
Pellet Plant – NEFCo Contract Extension Summary
18
• Reduced Price for Sludge Processing
• $1.25 M savings over 5-yr extension
• Revised Capital Program Structure
• Retains NEFCo liability (must return fully operating plant at end of contract)
• Extension authorized for 5-years
Pellet Plant – NEFCo Contract Extension Summary
19
• Provides MWRA sufficient time to:
Evaluate potential energy efficiency improvements (large dryer technology)
Stabilize future sludge quantities (co-digestion)
Allow for increased competition
20
• Word of mouth marketing - 32 transactions in April and May
• Lawn care “enthusiasts” showering praise upon Bay State Fertilizer
• Marketing Intern started May 18th
– Goal: Expand retail presence
Bay State Fertilizer
21
New Bay State Fertilizer Bag – Rita Berkeley
22
• Available at no cost MWRA member Communities
• Pickup at the Pellet Plant in Quincy
• Contact Carl Pawlowski (617) 773-4295
Bay State Fertilizer
Massachusetts Water Resources Authority
Questions ?