J I M N E L SO N , I O WA D O T
MASSENA LATERAL BRIDGE SLIDE CASE STUDY
![Page 2: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY](https://reader035.vdocument.in/reader035/viewer/2022062501/5681693b550346895de0aba5/html5/thumbnails/2.jpg)
PROJECT LOCATION
• IA 92 over Small Natural Stream, 1.0 mile west of Jct. IA 148
![Page 3: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY](https://reader035.vdocument.in/reader035/viewer/2022062501/5681693b550346895de0aba5/html5/thumbnails/3.jpg)
PROJECT LOCATION
![Page 4: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY](https://reader035.vdocument.in/reader035/viewer/2022062501/5681693b550346895de0aba5/html5/thumbnails/4.jpg)
EXISTING STRUCTURE
• 40’ x 30’ Steel I-beam• Constructed 1930• Reconstructed
1949• Overlay 1968• Retrofit rail 1992• Overlay 1998
![Page 5: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY](https://reader035.vdocument.in/reader035/viewer/2022062501/5681693b550346895de0aba5/html5/thumbnails/5.jpg)
EXISTING STRUCTURE
• Structurally deficient – sufficiency rating is 38.2• Bridge is not
adequate for legal loads – posted “One truck at a time.”
![Page 6: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY](https://reader035.vdocument.in/reader035/viewer/2022062501/5681693b550346895de0aba5/html5/thumbnails/6.jpg)
PROPOSED REPLACEMENT BRIDGE
• Pretensioned Prestressed Concrete Beam Bridge
![Page 7: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY](https://reader035.vdocument.in/reader035/viewer/2022062501/5681693b550346895de0aba5/html5/thumbnails/7.jpg)
MOBILITY IMPACTS
• Detour traffic for duration of construction• 7 miles out of distance travel for detour• AADT (2012) – 1,460 w/ 16% trucks• User costs for 180 day detour• Indirect $437,000• Direct $15,000 (Co. Road Maint. & Detour
Signing)
![Page 8: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY](https://reader035.vdocument.in/reader035/viewer/2022062501/5681693b550346895de0aba5/html5/thumbnails/8.jpg)
PROJECT STAGING AREA
![Page 9: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY](https://reader035.vdocument.in/reader035/viewer/2022062501/5681693b550346895de0aba5/html5/thumbnails/9.jpg)
UTAH DOT WANSHIP BRIDGE SLIDE
![Page 10: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY](https://reader035.vdocument.in/reader035/viewer/2022062501/5681693b550346895de0aba5/html5/thumbnails/10.jpg)
BRIDGE CONSTRUCTION VISUALIZATION
![Page 11: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY](https://reader035.vdocument.in/reader035/viewer/2022062501/5681693b550346895de0aba5/html5/thumbnails/11.jpg)
SEMI-INTEGRAL ABUTMENT
• Abutment Diaphragm Details – sheet number 14
![Page 12: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY](https://reader035.vdocument.in/reader035/viewer/2022062501/5681693b550346895de0aba5/html5/thumbnails/12.jpg)
SLIDING PAD
• Superstructure Details – sheet number 15• Bonded PTFE surface on bearing pad detail
![Page 13: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY](https://reader035.vdocument.in/reader035/viewer/2022062501/5681693b550346895de0aba5/html5/thumbnails/13.jpg)
PROJECT COST
• Let April 16, 2013
• Winning bid $1.3 Million
• Bridge unit cost - $112/SF
• Historic bridge unit cost - $85/SF
![Page 14: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY](https://reader035.vdocument.in/reader035/viewer/2022062501/5681693b550346895de0aba5/html5/thumbnails/14.jpg)
CRITICAL CLOSURE SCHEDULE
Activity 1 2 3 4 5 6 7 8 9Bridge Removal and GradingPavement RemovalRevetmentPile DrivingAbutment FootingBridge slidePrecast wingsBarrier RailingGranular BackfillApproach pavingLongitudinal GroovingSteel GuardrailPavement Marking
Day
![Page 15: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY](https://reader035.vdocument.in/reader035/viewer/2022062501/5681693b550346895de0aba5/html5/thumbnails/15.jpg)
MASSENA LATERAL BRIDGE SLIDE WEB SITE
![Page 16: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY](https://reader035.vdocument.in/reader035/viewer/2022062501/5681693b550346895de0aba5/html5/thumbnails/16.jpg)
CONSTRUCTION PROGRESS
![Page 17: MaSSENA LATERAL BRIDGE SLIDE CASE STUDY](https://reader035.vdocument.in/reader035/viewer/2022062501/5681693b550346895de0aba5/html5/thumbnails/17.jpg)
ACKNOWLEDGEMENTS
• Designer – Iowa DOT• Constructability Review – Michael Baker
Corporation• ABC Peer Exchange – Utah DOT• ABC Detail Testing – Iowa State University• Construction Administration – Iowa DOT• Prime Contractor – Herberger Construction Co., Inc.• Precast Wing Supplier – Cretex Concrete Products• Precast Beam Supplier – Cretex Concrete Products• HfL Grant – FHWA