May 9, 2017
Issue: Renovation of Bechtel ES
• To be addressed /answered:
– What are the dates of construction?
– Where will children go to school?
– How will children get to and fromschool?
– What is gained from the renovation?
•
•
•
•
•
Construction Timeline
Dec. 2019
June 2020
December 2022
ProjectCompleted
Work Begins
ContractAwarded
June2021
June2022
30 Months of Construction Work
Work Continues
WorkContinues
–
•
•
•
Bob Hope/Amelia Earhart Complex
Bob Hope Primary School
Typical Classroom Space
Classroom Technology
Media Center
Cafeteria at Bob Hope
–
–
–
–
–––
–
• East edge of campus is bounded
by controlled perimeter {along
Gushikawa Loop Road).
• North and west perimeter of
campus is bounded by residential
unit s and lwo Jima Circle.
• AT standoff setbacks require a
minimum distance from roads,
POV parking and controlled
perimeters limiting building
footprint
• Natural topography would require
massive excavation and sizable
retaining walls to re-grade for new
construction to the south of
existing buildings.
Log·s c - Co trado Exe usion Zone
A Contractor Exelus·o
Zone (CEZ) was proposed
fort e project si e to:
Provide unrestricted site
access for construction
activities
Eliminate down time due
to controlled gate access
to CampMclureous
Provide access to an
unfettered
laydown/storageand
parking area
Provide Contractor
parking area
Before and After Renovation Comparison
Current Bechtel Elementary School Renovated Bechtel Elementary School
5003
Increase of over 30,000 square feet of space
Demolish 1-story Building 5003 and southportion of Building 5000 and replace withnew 2-story building additions.