20112012
C A T A S T R O D E
M I N E R O SPROYECTOS
MINING PROJECTS SURVEY
www.minsurvey.com
2011
/ 2
012
R e l i a b l e a n d T i m e ly i n f o R m aT i o n
CA
TA
ST
RO
D
EP
RO
YE
CT
OS
MIN
ER
OS
MIN
ING
PR
OJE
CTS
SU
RV
EY
31 años
R E L I A B L E A N D T I M E LY I N F O R M AT I O N31
añ
os
RE
LIA
BL
E A
ND
TIM
EL
Y I
NF
OR
MA
TIO
N
STUDIES & COMPENDIUMS
The Most prestigious Directory of theChilean MiningIndustry.
• A strong mining industry analysis.• The balance of the industry in the last
10 years.• From small to large scaled mining.• All chilean mining operations.• A complete directory of suppliers in
the Industry.
The Most prestigious Directory of theChilean MiningIndustry.
In the Chilean Mining Compendium you will find all the information you need to know about mining industry in Chile:
For more information, visit www.mch.cl or contact us in [email protected]
CHILE’S LEADING BUSINESS AND TECHNICAL PUBLISHER
COMPENDIO MCH 2011.indd 14 23-08-11 18:23
11PRÓLOGO
Foreword
20112012
Fotografía Portada / Cover Picture:Con gentileza de / With courtesy of
SCM Lumina Copper Chile – Proyecto Caserones
La exploración minera es una de las actividades que posee mayores niveles de incertidumbre respecto de su resultado final aun así es la base de la minería que, para sustentar su producción, requiere
encontrar nuevos recursos. / Mineral exploration is an activity that has higher levels of uncertainty about its outcome, It is still the base of mining, that to sustain their
production, require new resources.
Preparado por / Prepared byEditec S.A.
Presidente / PresidentRicardo Cortés
Gerente General / General ManagerRoly Solís
Gerente de Producción / Production ManagerNelson Torres
Jefe de Estudios / Studies ChiefCristián Cifuentes
Análisis y Edición / Analysis and EditionÁrea de Estudios de Editec / Editec Research Department
Traducción / TranslationRoberto Andrade
Diseño y Producción / Layout and ProductionEdiarte S.A.
Impresión / PrintImprescolor Ltda.
Editec S.A. Av. del Cóndor 844 of. 205
Ciudad Empresarial, HuechurabaSantiago de Chile
Registro Propiedad Intelectual Nº 207.771
© Editec S.A. Prohibida su reproducción total o parcial, y por cualquier tipo de medios o sistemas, sin el consentimiento por escrito y previo de sus
creadores. / It is prohibited its total or partial reproduction, by any means, without the written and previous approval of is authors.
C A T A S T R O D E
M I N E R O SPROYECTOS
MINING PROJECTS SURVEY
31 años
R E L I A B L E A N D T I M E LY I N F O R M AT I O N
2 CATASTRO DE PROyECTOS MINEROS / 2011 - 2012
Mining Projects Survey 2011-2012
Pró
log
o F
orew
ord
Estimado lector:
La minería constituye una de las principales actividades económicas en muchos países de Sudamérica; sin embargo, su dependencia de las condiciones del mercado a nivel inter-nacional y del sector financiero, hace de este rubro un negocio riesgoso
Aun así, cabe destacar que el 2010 fue un año extraordina-rio en donde muchos de los proyectos mineros que se habían suspendido o paralizado como consecuencia de la crisis finan-ciera de 2008-2009, debido fundamentalmente a la recupera-ción de los precios de los metales.
Por lo anterior, es aún más importante conocer bien como se mueve la industria minera, los actores más relevantes y obvia-mente los futuros desarrollos mineros en carpeta. De esta ma-nera es más fácil de prever las tendencias y futuras necesidades que se puede traducir en ganancias.
En este contexto, proveemos una nueva edición de nuestro Catastro de Proyectos Mineros que desde su primera publica-ción en 1992 se ha convertido en una de las herramientas más importantes de análisis y consultas para el sector minero sud-americano. Con mucho agrado le presentamos la versión actua-lizada 2011-2012 que tiene Ud. en sus manos.
Este documento es el resultado de nuestro esfuerzo diario para buscar y proveer información confiable y oportuna desde hace 31 años a través de la revista MINERIA CHILENA, el Com-pendio de la Minería Chilena, y servicios de noticias diarias onli-ne, entre otros productos.
Dear Reader:
Mining represents one of the most impor-tant economic activities in many countries of South America. However, its dependence on global market conditions and the financial sec-tor makes this business risky.
Nevertheless, it has to be highlighted that 2009 was better than expected. Many of the projects that had been suspended or postponed as a consequence of the financial crisis in 2008 have been reactivated due to the recovery of metal prices.
Accordingly, it is even more important to know best the market, the most relevant players and, of course, their project pipeline. In this way, it is easier to predict trends and future requirements what can be translated directly into earnings.
Within this context, we provide a new edi-tion of our Mining Projects Survey which from its beginning in 1992 has become one of the most important tools for the South American mining sector. We are pleased to present you the updated volume 2010-2011 which you are holding in your hands.
The present document is the result of our daily effort searching for and providing reliable
33PRÓLOGO
Foreword
and timely information since 30 years, by means of MINERIA CHILENA magazine, the Chilean Mining Compendium, and a daily online news service, among other products.
Chapter 1 offers an introduction to the economy in general, and the mining sector, in particular, in each of the presented countries. The following sections present data on min-ing projects according to the country, project type, and stage of development.
In order to facilitate the access to further information sources, we also include a register of engineering and construction firms dedicated to the development of mining projects. The directory of junior mining com-panies in chapter 7 gives an overview over the key players in exploration.
An appendix and alphabetic index at the end of the book allow for a quick search of investments by project names, locations or other items.
We kindly invite you to get familiar with our Mining Projects Survey 2009-2010 – with detailed information, a clear structure and a modern layout.
The Editors
El primer capítulo del libro introduce al lector a la situación económica en general, y al rubro minero en particular, de cada uno de los países incluidos. En tanto, las secciones subsiguien-tes se presentan las inversiones según país, tipo de proyecto y etapas de desarrollo.
Con el objetivo de facilitar el acceso a otras fuentes de in-formación, además incluimos un directorio de empresas de inge-niería y construcción que se dedican al desarrollo de proyectos mineros. Un directorio de empresas mineras junior que permite formarse una idea de los actores más importantes en la explo-ración.
Asimismo un anexo y un índice alfabético al final del libro permiten una búsqueda rápida de inversiones e información es-pecífica a través de nombre, ubicación u otros ítems de cada proyecto.
Le invitamos a conocer el Catastro de Proyectos Mineros 2011-2012
Los editores
ES impORTAnTE conocer COmO SE muEvE
lA industria minERA, lOS actores
relevantes y lOS fuTuROS DESARROllOS
minEROS
4 CATASTRO DE PROyECTOS MINEROS 2011 - 2012
Mining Projects Survey 2011-2012
Índ
ice
de
cont
enid
os
Inde
x Prólogo .............................................................. 2
capítulo 1 / Chapter 1 ..................... 9La minería en Sudamérica ............................... 11/ Mining in South America1.1 Exploración en el continente ....................... 13/ Exploration in the continent1.2 La región andina / The Andean region ................. 17
•Argentina / Argentina ..................................... 18•Chile / Chile .................................................. 25• El Tratado Binacional entre Chile ............. 36 y Argentina / Binational Agreement between Chile
and Argentina•Perú / Peru .................................................... 38
1.3 El Escudo continental de Sudamérica ....... 43/ The continental shield of South America
•La minería en Brasil / Mining in Brazil ........... 43• Vale –la minera líder del País .................... 51 / Vale – The country’s leading miner
1.4 Minería Latina fuera de Sudamérica ......... 53/ Latin mining outside of South America
capítulo 2 / Chapter 2 .................... 61Proyectos greenfield en Argentina/ Greenfield projects in ArgentinaEstudio / Study
•Agua Rica .................................................... 62•Calcatreu ..................................................... 67•Cerro Negro................................................. 70•Diablillos ....................................................... 74•Don Nicolás ................................................. 77•El Pachón .................................................... 81•Lindero ......................................................... 85•Los Azules ................................................... 88•Navidad ........................................................ 91•Río Colorado ............................................... 94•San Jorge .................................................... 98
Exploración / Exploration•Cerro Cuadrado ........................................ 102•Potrerillos ................................................... 104•Rio Grande ................................................ 106•Taca Taca ................................................... 109•Vicuña ........................................................ 111
capítulo 3 / Chapter 3 ..................... 115Proyectos en Chile / Projects in Chile3.1 Chile – Brownfield
•Cerro Bayo ................................................ 116Fabiola y Dagny .............................................. 116
•Codelco Andina ........................................ 120Nueva Andina 2 .............................................. 120
•Codelco El Teniente .................................. 124Nuevo Nivel / New Level...................................... 127Rajo Sur ........................................................ 125Diablo Regimiento Fase II / Phase II ...................... 130
•Codelco Chuquicamata ........................... 132Chuquicamata Subterráneo / Underground Mine ...... 132
•Codelco Radomiro Tomic ........................ 136Radomiro Tomic Sulfuros / Sulphides ..................... 137
•Codelco Salvador ..................................... 139San Antonio ................................................... 139
•Collahuasi .................................................. 142Extensión Fase 1 / Extension Phase 1 ...........................142Extensión Fase 2 / Extension Phase 2....................... 144
•El Abra ....................................................... 146Sulfolix .......................................................... 146
•El Dorado ................................................... 149Reactivación / Reactivation ................................... 149
•El Peñón .................................................... 152Ampliación / Expansion........................................ 152
•El Tesoro .................................................... 154Mirador ......................................................... 154
•Escondida .................................................. 157Expansión Fase 5 / Expansion Phase 5 .........................158Pila Dinámica de Óxidos de Cobre .................... 161/ Dynamic Snack of Copper Oxide
•Lomas Bayas ........................................... 163•Extensión - Lomas Bayas II / Extension - Lomas Bayas II ..163
Extensión - Lomas Bayas III / Extension - Lomas Bayas III ...167•Los Bronces .............................................. 169
Expansión / Expansion ........................................ 169•Mantos Blancos ........................................ 173
Expansión Santa Bárbara / Expansion Santa Barbara ......173
Mercedes ...............................................................175•Quebrada Blanca...................................... 177
Hipógeno / Hypogene ......................................... 177•Spence ....................................................... 179
Optimización / Optimization................................... 179•SQM .......................................................... 182
Pampa Blanca .......................................................1823.2 Chile – GreenfieldConstrucción / Construction
•Caserones ................................................. 185•Pascua Lama ............................................ 189
Estudio / Study•Antucoya .................................................... 196•Caspiche .................................................... 198•Cerro Blanco ............................................. 201
55CATASTRO DE PROyECTOS MINEROS 2011 - 2012
Mining Projects Survey 2011-2012
•Cerro Casale ............................................. 205•Copaquire .................................................. 209•El Morro ..................................................... 212•Inca de Oro ................................................ 216•Lobo-Marte ............................................... 219•Mina Ministro Hales .................................. 221•Relincho ..................................................... 226•Sierra Gorda .............................................. 229•Volcán ........................................................ 232
Exploración / Exploration•Antakena (Ex Apoquindo) ........................ 235•Cluster Toki ................................................ 239•Minera Patricia .......................................... 242•Santo Domingo ......................................... 244•Telégrafo .................................................... 247•Vizcachitas ................................................ 249
capítulo 4 / Chapter 4 ........................251Proyectos en Perú / Projects in Peru4.1 Perú - Brownfield
•Antamina .................................................. 252Expansión / Expansion ........................................ 252
•Cuajone ...................................................... 257Expansión / Expansion ........................................ 257
•Toquepala .................................................. 259Expansión / Expansion ........................................ 259
4.2 Perú - GreenfieldConstrucción / Construction
•Antapaccay ............................................... 262•Azulcocha .................................................. 265•Tantahuatay ............................................... 269
Estudio / Study •Cañariaco .................................................. 273•Conga ........................................................ 276•Constancia ................................................ 279•El Galeno ................................................... 282•Huaquira .................................................... 285•Las Bambas .............................................. 288•Los Chancas ............................................. 292•Magistral .................................................... 294•Marcobre / Mina Justa ............................. 299•Michiquillay ................................................ 303•Ollachea ..................................................... 306•Pico Machay ............................................. 308•Quellaveco ................................................. 312•Río Blanco ................................................. 315•Tía María .................................................... 320•Toromocho ................................................ 323
Exploración / Exploration•Berenguela ................................................ 327
•Bongará ..................................................... 330•La Libertad ................................................ 333
capítulo 5 / Chapter 5 .................. 335Proyectos en Brasil / Projects in Brazil5.1 Brasil - Brownfield
•Carajás ..............................................................336130 Mtpa ...............................................................336
•Chapada ...........................................................338Expansión / Expansion ...............................................338
•Paragominas ...................................................342Ampliación III / Expansion III ........................................342
•Turmalina ...........................................................344Expansión I / Expansion I ............................................344
5.2 Brasil - GreenfieldConstrucción / Construction
•Barro Alto ...........................................................346•Minas Río ...........................................................350•Salobo .................................................................353
Estudio / Study•Arapiraca ............................................................357•C1 Santa Luz ....................................................360•Carajás Serra Sul ............................................363•Cristalino ............................................................366•Níquel do Vermelho ........................................368•Pedra de Ferro .................................................371•Proyecto 118 Cobre ......................................374•Tucuma – Boa Esperança ............................376•Jacaré .................................................................378
capítulo 6 / Chapter 6 .........................381Otros proyectos en Latinoamérica/ Others projects in Latin AmericaConstrucción / Construction
•Fénix - Guatemala ..........................................382Estudio / Study
•Gaby - Ecuador ...............................................385•La Verde - México ...........................................388•Río Blanco - Ecuador ....................................390
Exploración / Exploration•Yuty - Paraguay ...............................................393
capítulo 7 / Chapter 7 .........................397Directorios de empresas de ingeniería y construcción ...................................................................398/ Directory of engineering and construction companies chapter 8 / Chapter 8 Directorio de empresas juniors .............................419/ Directory of junior companies
6 CATASTRO DE PROyECTOS MINEROS / 2011 - 2012
Mining Projects Survey 2011-2012
anexo - tablas / Tables............. 435
Tabla 1 / Table 1 .................................................. 436• Proyectos según país, etapa, inversión y
orígen de inversión / Projects by country, stage, investment and origin of investment
Tabla 2 / Table 2 .................................................. 444• Proyectos según etapa, mineral, reserva/
recurso y ley de mineral / Projects by stage, ore, reserve/resource and ore grade
Tabla 3 / Table 3 .................................................. 449• Proyectos según mineral, producción anual
y vida útil / Projects by ore, annual production and life of mine
Tabla 4 / Table 4 .................................................. 453• Proyectos según mineral, tipo de explotación
y proceso / Projects by ore, type of production and process
Tabla 5 / Table 5 .................................................. 456• Proyectos en Argentina según etapa,
empresa, mineral e inversión / Projects in Argentina by stage, company, ore and investment
Tabla 6 / Table 6 .................................................. 457• Proyectos en Chile según etapa, empresa,
mineral e inversión / Projects in Chile by stage, company, ore and investment
Tabla 7 / Table 7 .................................................. 459• Proyectos en Perú según etapa, empresa,
mineral e inversión / Projects in Peru by stage, company, ore and investment
Tabla 8 / Table 8 .................................................. 460• Proyectos en Brasil según etapa, empresa,
mineral e inversión / Projects in Brazil by stage, company, ore and investment
Tabla 9 / Table 9 .................................................. 460•Otros proyectos en Latinoamérica según etapa, empresa, mineral e inversión / Other projects in Latin America by stage, company, ore and investment
Tabla 10 / Table 10 ............................................... 461• Proyectos según su ubicación en provincias,
regiones, departamentos y estados / Projects by their location in provinces, regions, departments and states
Índice alfabético de los proyectos por país ... 465
/ Alphabetic index of projects
77CATASTRO DE PROyECTOS MINEROS 2011 - 2012
Mining Projects Survey 2011-2012
Distancia, superficie y volumen / Distance, suface and volumemm Milímetro / Millimeterm Metro / Meterkm Kilómetro / Kilometerm2 Metro cuadrado / Square meterm³ Metro cúbico / Cubic metermsnm Metros sobre nivel del mar masl Meters above sea level
Peso y Medida / Weight and Measureg Gramo / Grammkg Kilogramo / Kilogrammt Tonelada (métrica) / Tonne (metric)kt Kilotonelada / KilotonneMt Millones de toneladas (métricas)
/ Million tonnes (metric)oz Onza / Ouncekoz Miles de onzas / Thousand ouncesMoz Millones de onzas / million ounceslb Libra / PoundMlb Millones de libras / Million pounds
Minerales más comunes / Common mineralsCa Calcio / CalciumCu Cobre / CopperCuEq Cobre equivalente / Copper equivalentCu conc Cobre en concentrado / Copper in concentrateCu cat Cátodos de Cobre / Copper cathodesAu Oro / GoldAuEq Oro equivalente / Gold equivalentAg Plata / SilverMo Molibdeno / MolybdenumNi Níquel / NickelFe Hierro / IronZn Zinc / ZincPb Plomo / LeadI2 Yodo / Iodine SO4 Sulfatos / SulfatesKNO3 Nitrato de potasio / Potassium nitrateTiO2 Rutilio / RutileFsp Feldespato / Feldsparconc en concentrado / in concentratecat en cátodos / in cathodes
Concentración y Tasa de Producción / Concentration and Production Rateppm Partes por millón / Parts per milliongpt Gramos por tonelada / Grammes per tonnetph Toneladas métricas por hora
/ Metric tonnes per hourtpd Toneladas métricas por día
/ Metric tonnes per daytpm Toneladas métricas por mes
/ Metric tonnes per monthtpa Toneladas métricas por año
/ Metric tonnes per yearoz/a Onzas por año / Ounces per yearMoz/a Millones de onzas por año
/ Million ounces per year
Procesos e insumos / Processes and consumablesg/L Gramos por litro / Grams per literkg/L Kilogramos por litro / Kilogrammes por literl/s Litros por segundo / Liters per secondl/m Litros por mes / Liters per monthkV KilovoltioskVA Kilovoltio-amperiosMWh Megawatt-horas / Megawatt-hours
Procesos de Producción / Production ProcessesFlot Flotación / FlotationLix Lixiviación / LeachingSX Extracción por solventes / Solvent extractionEW Electro-obtención / Electro-winning
Moneda y Precios / Currency and PricesUS$ Dólares Estados Unidos / US dollarsMUS$ Millones de dólares / Million dollarsUS$/lb Dólares por libra / Dollars per pound
Tipo de Sociedades y Cargos / Type of Company and PositionsCía. Compañía / CompanyLtda. Responsabilidad Limitada / LimitedS.A. Sociedad anónima / IncorporatedSCM Sociedad contractual Minera / Contract Mining CompanyVP Vicepresidente / Vice president
s/a sin antecedentes / not available
abreviaciones/ Nomenclature
C A p Í T u l O 1la minerÍa en
sudamÉrica
MINING IN S O U T H A M E R I C A
C A T A S T R O D E
M I N E R O SPROYECTOS
MINING PROJECTS SURVEY
20112012www.minsurvey.com
31 años
R E L I A B L E A N D T I M E LY I N F O R M AT I O N
Figura 1.1 Mientras todos los países de Latinoamérica cuentan con algún tipo de producción minera y proyectos relacionados, en el presente Catastro de Proyectos Mineros se incluyen Argentina, Brasil, Chile y Perú (destacados en color ■ en el mapa), dándole un espacio por primera vez a países como Ecuador, México y Paraguay (Otros Latinoamérica, destacados en gris).
Figure 1.1 Although all South American countries have some kind of mining production and related projects, in the present mining Projects Survey the most important for this economic sector are included (as highlighted in red in the map): Argentina, Brazil, Chile and Peru. However, in this edition, provides a new space for outstanding projects in Latin America in countries as Ecuador, Mexico and Paraguay.
BOLIVIA
PARAGUAY
La Paz
Sucre
Brasilia
Caracas
Bogotá
Monterrey
OCÉANOATLÁNTICO
MARCARIBE
OCÉANOPACÍFICO
Santiago
Lima
Quito
Asunción
AMÉRICA DEL SUR
AMÉRICA CENTRAL
AMÉRICA DEL NORTE
PERÚ
ECUADOR
CHILE
URUGUAY
ARGENTINA
MontevideoBuenos Aires
BRASIL
VENEZUELA
GUYANA
COLOMBIA SURINAME
ParamariboGeorgetown
GUATEMALA
MEXICO
Flores
1111
SI BIEN LA MINERÍA MASIvA parece ser un fenómeno de nuestra época, la historia minera en Sudamérica comenzó hace muchos siglos. Aunque con métodos primitivos, las primeras cul-turas indígenas ya utilizaban recursos naturales como el cobre o los metales preciosos, y pirquineros precolombinos extraían mi-nerales de la tierra con martillos de piedra y barretas de madera. Asimismo, culturas desarrolladas como los Incas fueron intensi-vas en el uso de los metales preciosos, en especial para joyería y decoración.
Con la llegada de los conquistadores españoles la minería se convirtió en responsabilidad de los colonizadores, que desde entonces extrajeron y comercializaron oro y plata a gran escala para exportar la mayor parte a los reinos de España o Portugal (este último fue el caso de Brasil), explotando las riquezas de los países sometidos.
Although mining seems to be a phenom-enon of our era, the mining history in South America has started many centuries ago. In spite of the primitive methods utilized in former days, the first indigenous cultures also took advantage of natural resources like copper or precious metals. Pre-Columbian artisan miners utilized stone hammers and wood digging bars to extract minerals from the ground. Moreover, developed cultures such as the Incas used precious metals massively, especially for jewels and decoration
With the arrival of the Spanish conquerors, min-ing was overtaken by the colonizers. They started to mine and trade precious metals at a big scale by ex-ploiting the subdued countries’ wealth and exporting the major part to the Kingdom of Spain, or Portugal in the case of Brazil..
In the present time, all South American coun-
tries have some kind of mining production that, in some of them, involves a high economic importance. Another characteristic of the mentioned countries is that a substantial part of the mining production is exported at large scale.
The most important products in value and vol-ume correspond to oil, copper, bauxite, iron ore, gold and silver. Thanks to massive mining, South America is a world leader in the production of iron ore (Brazil), copper (Chile) and silver (Peru). As well, it is listed among the major producers of molybdenum, lead, zinc, manganese and tin in the world (Table 1.1).
Organizations such as the Metals Econom-ics Group (MEG) indicates that Latin America has dominated for the past three years in the discovery of potential sites for base metals and precious metals.
On the other hand, important reserves of non-metallic minerals such as iodine, lithium, nitrates and borates are found in Chile together with potassium chloride in Argentina.
As far as volumes are concerned, Chile, Peru and Brazil are the countries that produce the higher
Actualmente, todos los países sudamericanos poseen algún tipo de producción minera y, en algunos de ellos, ésta tiene gran importancia en la economía. Otra característica de esta actividad es que parte relevante de la producción es destinada a la expor-tación a gran escala.
Los principales productos –en valor y volumen– son el pe-tróleo, el cobre, la bauxita, el mineral de hierro, el oro y la plata. Gracias a la minería masiva, Sudamérica es líder mundial en la producción de hierro (Brasil), cobre (Chile) y plata (Perú), encon-trándose además entre los mayores productores de aluminio, mo-libdeno, plomo, zinc, manganeso y estaño (Tabla 1.1).
Organizaciones como el Metals Economics Group (MEG) in-dican que Latinoamérica ha dominado durante los últimos tres años en el hallazgo de potenciales yacimientos de metales base y de metales preciosos.
Asimismo, en Latinoamérica existen importantes reservas de minerales no-metálicos como yodo, litio, nitratos y boratos en Chile, y cloruro de potasio en Argentina.
Mining in South America
La Minería en Sudamérica / CAPÍTuLO 1
AunquE COn mÉtodos Primitivos, lAS
pRimERAS culturas inDÍgEnAS yA uTilizAbAn
RECuRSOS nATuRAlES COmO El cobre O lOS
metales pRECiOSOS
C A p Í T u l O 2Proyectos
en arGentina
P R O J E C T S I N A R G E N T I N A
20112012
C A T A S T R O D E
M I N E R O SPROYECTOS
MINING PROJECTS SURVEY
www.minsurvey.com
31 años
R E L I A B L E A N D T I M E LY I N F O R M AT I O N
62 ARgENTINA / CATASTRO DE PROyECTOS MINEROS 2011 - 2012
Mining Projects Survey 2011-2012
ag
ua r
ica
/ S
tud
y
Pro
yect
op
roje
ct
25 km al norte de Andaglalá y 35 km al este de la mina. Bajo la Alumbrera, Provincia de Catamarca.25 km north of Andalgala and 35 km east of Bajo de la Alumbrera mine, Catamarca Province.
Mapa de Ubicación / Map of Location
CATAMARCA
Catamarca
Tucumán
La Rioja
CHILE
Salta
Santiagodel Estero
recursos medidas e indicados / Measured and : 201,00 Mt @ 0,39% Cu; indicated resources 0,039% Mo; 0,14 gpt Au; 2,82 gpt Ag recursos inferidos : 642,11 Mt @ 0,34% Cu; / Inferred resources 0,034% Mo; 0,12 gpt Au; 2,33 gpt Aginversión (millones de us$) : 2.100/ Investment (million US$)Producción anual : 170.000 tpa Cu; 9.200 tpa Mo; / Annual production 148.000 oz AuPuesta en marcha : 2015/ Start-upvida útil (años) : 27/ Life time (years)
etapa actual : Estudio, ingeniería básica/ Actual stage : Study, basic engineering razón social / Company : Minera Agua Ricadomicilio / Address : Av. Libertad esq. San Martínciudad / City : 4740 Andalgalá, Provincia
de CatamarcaPaís / Country : Argentinateléfono / Telephone : (54-3835) 423 153 / 423 161/ 423 166 fax : (54-11) 4312 4424internet : www.aguarica.com.ar eJecutivos a carGo / Executive StaffGerente de desarrollo : José Luis Martín/ Development Managere-mail : [email protected] comunicaciones corporativas : Lisa Doddridge/ VP Corporate Communicationse-mail : lisa.doddridge@ yamana.comcontacto / Contact : Guillermo Piccionee-mail : [email protected] Propiedad / Ownership : Yamana Gold 100% (opción
de compra al 100% entre Xstrata y Goldcorp / purchase option at 100% between Xstrata and Goldcorp)
objetivo : Extracción de mineral de cobre y concentración mediante el proceso de flotación.
/ Objective : Exploitation of copper ores and concentration by a flotation process.
minerales / Minerals : Cu, Mo, Aureservas probadas y probables / Proven & : 908,93 Mt @ 0,49% Cu; probable reserves 0,031% Mo; 0,22 gpt Au; 3,50 gpt Ag
Agua RicaAgua Rica
Argentina - greenfield
Camino / Road
6363Proyectos Greenfield en Argentina en estudio / CAPÍTuLO 2
Greenfield projects in Argentina under study
Descripción del Proyecto project description
DESDE LOS COMIENzOS del siglo XX el sector rico en mi-nerales de cobre, molibdeno y oro alrededor de Agua Rica, ubica-do cerca de 34 km de la Mina Alumbrera, en el noroeste de Argen-tina, atrajo muchos mineros y prospectores. La primera campaña de exploración moderna que se realizó en la región fue en los años 60 y en más detalle en los años 70. Luego, Northern Orion y BHP desarrollaron el primer programa de exploración sistemático du-rante los años 90. El dueño actual es la empresa Minera Agua Rica, una subsidiaria de la compañía canadiense Yamana Gold.
Breve historia:1970’s. Las perforaciones de Cities Service indican un
potencial significativo de cobre y oro. Al final de la década la propiedad vuelve a su propietario argentino original, Recursos Americanos Argentinos (RAA).
1990’s: Al comienzo de la década del ’90 BHP adquiere de RAA una opción (70% BHP/ 30% RAA); Northern Orion adquiere la totalidad de los derechos de RAA y llega a ser socio del negocio de riesgo (joint venture).
1994: Inicio de la exploración sistemática.
ThE AROunD AGuA RICA, rich in copper, molybdenum and gold, is located about 34 km from Alumbrera mine in northwest Argentina, and has attracted miners and prospectors since at least the early 1900s. The first modern exploration began in the early 1960s and more detailed in the 1970s. Then, Northern Orion and BHP conducted their first systematic exploration during the mid 1990s. Presently the deposit is owned by Minera Agua Rica, a subsidiary of the Canadian company Northern Orion Resources.
historical overview:1970s. Cities Service drilling indicates signifi-
cant potential for copper/gold deposit; by decade’s end the property had reverted to original Argentine owner, Recursos Americanos Argentinas (RAA)
Early 1990’s RAA options property to BHP Billiton (30% RAA / 70% BHP); Northern Orion
acquires majority of RAA’s exploration holding and becomes BHP’s joint venture partner.
1994 Joint Venture undertakes extensive exploration
Agua Rica
DESDE lOS comienzos DEl SiglO xx
aGua rica ATRAjO muCHOS mineros y
pROSpECTORES
Etapa / Stage Empresa/ Company
Periodo/ Period
2006 2007 2008 2009 2010 2011 2012
Factibilidad/ Feasibility
s/a 2006 - 2011
Impacto Ambiental(1)
/ Environmental ImpactRescan Environmental
Services2007 - 2010
Factibilidad (actualización)/ Feasibility (update)
s/aQ1 2010 -
2011
Construcción / Construction
s/a 2012 - 2015
etap
as
del p
roye
cto
pro
ject
sta
ges
(1) EIA entregado en 2007 / EIS presented in 2007
C A p Í T u l O 3Proyectos
en chile
P R O J E C T S I N C H I L E
C A T A S T R O D E
M I N E R O SPROYECTOS
MINING PROJECTS SURVEY
20112012www.minsurvey.com
31 años
R E L I A B L E A N D T I M E LY I N F O R M AT I O N
116 ChILE / CATASTRO DE PROyECTOS MINEROS 2011 - 2012
Mining Projects Survey 2011-2012
cer
ro b
ayo
fab
iola
y d
agny
Pro
yect
op
roje
ct
El proyecto se ejecutará en la Región de Aysén, en la provincia General Carre-ra, comuna de Chile Chico, específicamente en sector de Laguna Verde s/n.The project will be implemented in the Aysen region, province of General Carrera, Chile Chico, specifically in Sector Laguna Verde s/n.
Mapa de Ubicación / Map of Location
etapa actual / Actual stage : Construcción razón social / Company : Compañía Minera Cerro
Bayo Limitadadomicilio / Address : Sector Laguna Verde S/Nciudad / City : Chile ChicoPaís / Country : Chileteléfono / Telephone : (56-2) 233 0379fax : (56-2) 233 1962internet : www.mandalayresources.come-mail : g.ditomaso@ mandalayresources.com eJecutivos a carGo / Executive Staff Gerente General mandalay chile : Neal Rigby/ General manager Mandaly ChileGerente General cerro bayo : Dominic Duffy / General Manager Cerro Bayo Propiedad / Ownership (%) : Mandalay Resources
Corporation. 100%objetivo : Reactivación de una mina
de Au-Ag y programas de exploración, con el fin de incorporar nuevos recursos al yacimiento.
/ Objective : Reactivation of Au-Ag mine and exploration programes
minerales / Minerals : Au, Agrecursos / Resources : 475.123 ton @ 2,7 gpt Au,
359 gpt Ag reservas / Reserves : 692.175 ton @ 2,61 gpt Au,
300 gpt Ag ley de corte / Cut-off grade : 0,45 gpt Au
Cerro BayoCerro Bayo
inversión (millones de us$) : 30 / Investment (million US$) Producción anual : 20.000 - 30.000 oz Au; / Annual production 3,5 Moz Ag.Puesta en marcha : 2011/ Start-upvida útil (años) : 5 /Life time (years)
3.1 Chile - Brownfield
Camino / Road
117117Proyectos Brownfield en Chile / CAPÍTuLO 3
Brownfield projects in Chile
Descripción del Proyecto project description
EL PROYECTO CERRO BAYO está alojado en una secuen-cia de tobas de cenizas del jurásico, cuya mineralización de oro y plata se encuentra predominantemente en vetas, stockwors y brechas. La propiedad minera Cerro Bayo se ubica en la región de Aysén, 130 km al sur de Coyhaique, y abarca 23.106 ha de concesiones de explotación y 4.700 ha de concesiones de ex-ploración.
CERRO bAyO PROJECT is located in a Ju-rassic ash tuff sequence whose gold and silver mineralization is mainly in veins, stockworks, and breccias. Cerro Bayo mining property is located in Aysén, 130 Km south of Coyhaique, and includes 23,106 ha exploitation leases and 4,700 ha exploration leases.
The mining plan includes underground operations, Sublevel Long Hole Stoping, and Shrinkage Stoping, which should allow high recovery in areas with better grades. Once the ore is extracted, it will be processes at the con-centrator plant located in the mining property.
El úlTimO rePorte pRESEnTADO En mARzO DEl
AñO 2010, mAnDAlAy RESOuRCES CORp. SE CEnTRó En
4 DE lAS 7 Potenciales vETAS pARA plAnifiCAR
Su REiniCiO DE OpERACiOnES
In sEpTEMBER 2010, dEvElopMEnT
And MInIng started, whIlE ThE
concentrator plAnT opERATIons
sTARTEd on jAnuARy 10, 2010
El plan minero contempla operaciones subterráneas –Sublevel Long Hole Stoping y Shrinkage Stoping–, con lo que se conseguiría alta recuperación de zonas de mejor ley. Una vez extraído el mineral, será procesado en la planta de concentración, ubicada en la propiedad minera.
Breve historiaEl yacimiento aurífero en el distrito de Cerro Bayo fue des-
cubierto en 1984 por la empresa FreePort Chile Exploration S.A., y en 1989 vendió los derechos a Coeur d’Alene Mines Corpo-ration, la que entre 1990 y 1993 concluyó la campaña de ex-ploración. El estudio de factibilidad se concluyo el año 1994, lo que llevó al inicio de las operaciones en 1995. Las operaciones se desarrollaron fundamentalmente mediante cielo abierto y mé-todos subterráneos auto-soportados hasta noviembre del 2000 cuando la caída en el precio de los metales y la profundización de las reservas extraíbles gatilló el cierre de las operaciones. En noviembre del 2002 se dio reinicio a las operaciones, esta vez mediante mineria subterránea en base a la Veta Lucero, operación que Coeur d’Alene Mines Corporation paralizó en 2008, producto del aumento en los costos y la caída en los mercados mundiales. La Compañía Minera Cerro Bayo fue adquirida en agosto del año 2010 por Mandaly Resources Corp.
Reservas y recursosSegún el último reporte presentado en marzo del año 2010,
Mandalay Resources Corp. se centró en 4 de las 7 potenciales vetas para planificar su reinicio de operaciones de estas 4 vetas 3 se encuentran en el sector de Laguna Verde y sólo Marcela Sur
Cerro Bayo
brief historyThe gold deposit in the Cerro Bayo District
was discovered in 1984 by the company Free-Port Chile Exploration S.A., which sold its rights to Coeur d’Alene Mines Corporation in 1989; the latter completed the exploration between 1990 and 1993. The feasibility study was completed in 1994, and operations started in 1995. Opera-tions were mainly open pit and self-supported underground methods until November 2000, when metal prices fell and extractable reserves became deeper and triggered the closure of operations. In November 2002, operation were restarted, this time through underground min-ing based on Lucero vein, an operation Coeur d’Alene Mines Corporation stopped in 2008 due to the increase in costs and falling prices in world markets. Compañía Minera Cerro Bayo was purchased by Mandalay Resources Corp. in August 2010.
C A p Í T u l O 4Proyectos
en Perú
P R O J E C T S I N P E R U
20112012
C A T A S T R O D E
M I N E R O SPROYECTOS
MINING PROJECTS SURVEY
www.minsurvey.com
31 años
R E L I A B L E A N D T I M E LY I N F O R M AT I O N
252 PERú / CATASTRO DE PROyECTOS MINEROS 2011 - 2012
Mining Projects Survey 2011-2012
ant
amin
a e
xpan
sió
n/
Exp
ansi
on
Pro
yect
op
roje
ct
473 km al norte de Lima, Región de Ancash, Provincia de Huari473 km northest Lima, Ancash region, Huari province
Mapa de Ubicación / Map of Location
77% and add 6 years of the project life. Increase copper and zinc production by 31%.
minerales / Minerals : Cu, Znreservas probadas y probables / Proven and : 745 Mt @ 1,06% Cu; probable reserves 0,67% Zn; 11,7 gpt Ag; 0,026% Moinversión (millones de us$) : 1.300/ Investment (million US$) Producción anual : 360.000 tpa Cu; / Annual production 215.000 tpa ZnPuesta en marcha : 2013/ Start-upvida útil (años) : 17/ Life time (years)
etapa actual : Construcción/ Actual Stage : Construction razón social / Company : Compañía Minera
Antamina S.A.domicilio / Address : Av. El Derby 055, torre A,
Piso 8. Santiago de Surcociudad / City : LimaPaís / Country : Perúteléfono / Telephone : (51-1) 217 3000fax : (51-1) 372 6317internet : www.antamina.come-mail : [email protected] eJecutivos a carGo / Executive StaffGerente logística : Saúl Lozano Benique/ Logistic Managere-mail : [email protected] Programa expansión / Expansion : Allan BrownriggProgram DirectorGerente Programa expansión / Expansion : Gustavo BravoProgram Manager
Propiedad : Xstrata Copper 33,75%ownership (%) : BHP Billiton 33,75% : Teck Resources 22,5% : Mitsubishi Corporation 10%objetivo : Elevar la capacidad de
procesamiento de mineral de la planta concentradora en 38% mediante optimiza-ción de algunos circuitos, aumentar reservas procesa-das en 77% y añadir 6 años de vida útil al proyecto. Aumentar la producción de cobre y zinc en 31%.
/ Objective : Increase the treatment capacity of the concentrator plant by 38% by optimization of some circuits, process reserves increase by
Antamina Antamina ExpansiónExpansión
4.1 Perú - Brownfield
Camino / Road
253253Proyectos Brownfield en Perú / CAPÍTuLO 4
Brownfield projects in Perú
Antamina Expansión
Descripción del Proyecto project description
COMPAñÍA MINERA ANTAMINA S.A. está operando des-de 2001 una mina a rajo abierto con procesamiento metalúrgico mediante flotación que produce, principalmente, concentrados de cobre y zinc los que son posteriormente transportados por un mineroducto al puerto ubicado en punta Lobitos provincia de Huarmey, región de Ancash.
COMPAñíA MInERA AnTAMInA S.A., which has been operating since 2001, is an open-pit mining operation with metallurgical processing by means of flotation that produces mainly concentrates of copper and zinc which are later transported through an ore slurry pipeline to the port in Punta Lobitos, District of Huarmey, Ancash Region.
The expansion project aims to incorporate additional reserves into the mining plan and to allow processing of the mineral at a higher level by means of the optimization of some circuits in the concentrator plant.
The main proposed changes are:• Modification of the mine plan
incorporating new, proven and Probable reserves of 745 Mt.
• Increase average ore processing level of the concentrator plant.
• Incorporation of new mine area called Usu Pallares.
• Modification of waste rock deposits Este and Tucush, allowing for an increase in its capacities and prints.
El pROyECTO DE exPansión TiEnE COmO
ObjETivOS El Procesamiento DEl minERAl
A un nivel máS ElEvADO
Etapa / StageEmpresa/ Company
Periodo/ Period 2007 2008 2009 2010 2011
Impacto AmbientalEnvironmental Impact
Golder Associates Perú
Hasta Q3 2007
Estudio de Factibilidad/ Feasibility
s/anot assineg
2009
Construcción (EPCM)/ Construction (EPCM)
Aker Solutions Q1 2010 – Q4 2011
etap
as
del p
roye
cto
pro
ject
sta
ges
EPCM: Gestión de ingeniería, procura y construcción /Engineering, procurement and construction management
El Proyecto de Expansión tiene como objetivos principales el incorporar en el plan minero reservas adicionales y permitir el procesamiento del mineral a un nivel más elevado mediante la op-timización de algunos circuitos en la planta concentradora.
Los principales cambios propuestos son:•IncorporacióndenuevasReservasprobadasyprobables
de 745 Mt.•Aumentoenelniveldeprocesamientopromediodemineral
en la planta concentradora.•Incorporacióndenuevaáreaarajo,denominadaUsuPa-
llares.•Modificación de botaderos de desmonte Este y Tucush,
considerando un aumento en sus capacidades y huellas.
www.minsurvey.com
C A p Í T u l O 5Proyectos
en brasil
P R O J E C T S I N B R A S I L
20112012
C A T A S T R O D E
M I N E R O SPROYECTOS
MINING PROJECTS SURVEY
31 años
R E L I A B L E A N D T I M E LY I N F O R M AT I O N
336 BRASIL / CATASTRO DE PROyECTOS MINEROS 2011 - 2012
Mining Projects Survey 2011-2012
car
ajás
130
mtp
a
Pro
yect
op
roje
ct
Al norte de Carajás, Estado de ParáNorth of Carajás, Pará State.
Mapa de Ubicación / Map of Location
etapa actual : Estudio, Ingeniería de detalles./ Actual Stage : Study, Detail engineering. razón social / Company : Vale – Área Operacional de
Carajásdomicilio / Address : Estrada Raymundo Mascar-
enhasciudad / City : Parauapebas, ParáPaís / Country : Brasilteléfono / Telephone : (55-91) 3327 4705internet : www.vale.comcontacto / Contactcomunicaciones : Lívia Amaral/ Communication teléfono / Telephone : (55-91) 3214 5432e-mail : [email protected] eJecutivos a carGo / Executive StaffGerente de proyectos : Gilberto Acevedo/ Project Manager Propiedad / Ownership : Vale 100%objetivo : Aumentar capacidad de
producción en 30 Mtpa, construcción de nueva planta de chancado y clasi-ficación, y mejoramiento de infraestructura.
/ Objective : Increase production capacity by 30 Mtpa, construction of a new crushing and classification plant, improvement of infrastructure.
minerales / Minerals : Feinversión (millones de us$) : 2.478/ Investment (million US$)Producción anual / Annual production : 130 MtpaPuesta en marcha : Q3 – Q4 2012/ Start-up
CarajásCarajás130 Mtpa130 Mtpa
5.1 Brasil - Brownfield
Camino / Road
337337Proyectos Brownfield en Brasil / CAPÍTuLO 5
Brownfield projects in Brasil
Descripción del Proyecto project description
CARAJáS 130 MTPA es un proyecto tipo brownfield que tiene como objetivo aumentar la capacidad productiva en el norte de la provincia minera de Carajás. La inversión se estima en US$ 2.478 millones, monto que cubrirá la expansión de la actual mina, la instalación de una planta de chancado primario e infraestructura logística.
La operación minera de Carajás está ubicada en la Sierra Nor-te de Carajás, en el Estado de Pará, donde su dueño, la compañía brasileña Vale, ya cuenta con una capacidad de producir 100 Mtpa.
El objetivo de la iniciativa es aumentar la capacidad productiva en 30 Mtpa. Para ello la nueva planta tendrá un chancador primario, además de unidades de beneficio y clasificación. Junto a ello se prevé ampliar la capacidad de transporte, almacenamiento y des-carga en el terminal marítimo de Ponta de Madeira, en el estado de Maranhão.
El costo de capital destinado para este 2011 por la compañía es de US$423 millones, entre otros, para el desarrollo de la ingeniería de detalle, iniciada el 2007. El proyecto ya cuenta con la aprobación del consejo de administración y las licencias de extracción, estimán-dose el inicio de la operación para el primer semestre de 2012.
CARAJáS 130 MTPA is a brownfield project to increase production capacity in the Northern range of the Carajás mineral province. Investment is estimated in US$2.478 billion, an amount that will cover the current mine expansion, the installa-tion of a primary crushing plant, and the logistics infrastructure.
The mine site Carajás is located in Northern Carajás, in the state of Pará, Brazil, with a current production capacity of 100 Mtpa.
Its current owner, the Brazilian company Vale, is developing a project designed to add 30 Mtpa to present capacity. Activities include the construction of a plant with primary crusher, beneficiation and classification units. Expansion of transportation, storage, and unloading capacity at the Ponta de Madeira maritime terminal, State of Maranhão, is also foreseen.
Capital cost assigned by the company for 2011 is US$423 million which includes detail engineering development, started in 2007. The project has already been approved by the adminis-tration council and extraction permits have been granted. The operation estimated start is 2012 first semester.
Carajás 130 Mtpa
El COSTO DE CApiTAl DESTinADO pARA ESTE 2011 pOR
lA comPañÍa ES DE uS$423 millOnES, EnTRE
OTROS, pARA El desarrollo DE lA ingEniERÍA
DE DETAllE, iniCiADA El 2007
Obras Principales / Main tasks
fic
ha t
écni
caTe
chni
cal s
heet
• Planta de chancado primario• Unidades de beneficio y clasificación
Unidades de logística:• Terminales• Canchas de Acopio
Viradores de vagonesVagonesLocomotivas
Equipos y maquinarias / equipment
• Primary Crusher Plant• Beneficiation and classification units
logistics units:• Terminals • Stockyards
Rotary car dumpersWagonsLocomotives
C A p Í T u l O 6otros
Proyectos en latinoamÉrica
O T H E R S P R O J E C T S I N
L AT I N A M E R I C A
20112012
C A T A S T R O D E
M I N E R O SPROYECTOS
MINING PROJECTS SURVEY
31 años
R E L I A B L E A N D T I M E LY I N F O R M AT I O N
www.minsurvey.com
382 LATINOAMéRICA / CATASTRO DE PROyECTOS MINEROS 2011 - 2012
Mining Projects Survey 2011-2012
fén
ix/
Gua
tem
ala
Pro
yect
op
roje
ct
Departamento de Izabal, municipio de El Elestor. Sector Finca Cahaboncito Norte. 400 – 800 msnmDepartment of Izabal, Municipality of El Elestor. Finca Cahaboncito Norte Sector. 400 – 800 masl
Mapa de Ubicación / Map of Location
Puesta en marcha : 2011/ Start-upvida útil (años) : 30Life time (years)
etapa actual : Construcción/ Actual stage : Contruction
razón social / Company : Compañía Guatemalteca de Níquel S.A (CGN)
domicilio / Address : 3ª Avda 13-78 Zona 10 Torre Citibank, Oficina 401.
ciudad / City : GuatemalaPaís / Country : Guatemalateléfono / Telephone : (502) 2419 0200fax : (502) 2419 0201internet : www.cgn.com.gt.e-mail : relacionescorporativas@
cgn.com.gt [email protected]
eJecutivos a carGo / Executive StaffPresidente / President : David Garofalovicepresidente ejecutivo : W. Warren Holmes/ Executive VP Propiedad / Ownership (%) : HudBay Minerals Inc.: 98,2% Gobierno de Guatemala : 1,8%objetivo : Explotación a rajo abierto
de minerales de níquel y habilitación y ampliación de planta de tratamiento existentes.
/ Objective : Exploitation open pit nickel ores and habilitation and expansion of existing processing plant.
minerales / Minerals : Ni, Ferecursos / Resources : 36,2 Mt @ 1,92% Niley de corte : 1,6% Ni/ Cut-off gradeinversión (millones de us$) : 754/ Investment (million US$) Producción anual / : 22.700 tpa ferro-níquel / / Annual production ferro-nickel (35% Ni; 65% Fe)
FénixFénix
Camino / Road
383383Otros proyectos en Latinoamérica en construcción / CAPÍTuLO 6
Others projects in Latin America under construction
Descripción del Proyecto project description
EL PROYECTO féNIx es un proyecto tipo Brownfield ubica-do en la zona oriente de Guatemala, cercano a El Elestor, Izabala. El depósito esta constituido por minerales de níquel laterita en la zona inferior, y en la zona superior una capa de limonita separada por una capa irregular de transición.
La Compañía Guatemalteca de Níquel S.A (CGN) cuya propie-dad está en manos de HudBay Minerals Inc. (98,2%) y el Gobierno Guatemalteco (1,8%), será quien administre la operación durante los 30 años que dure en operación. El modelo de desarrollo con-templa una operación a rajo abierto y en plena producción espera alimentar con 1,5 millones de toneladas de Saprolita con leyes me-dias de 1,6% de níquel a la reacondicionada planta de procesa-miento Exmibal, la que fue utilizada hasta 1980 cuando fue cerrada debido al alza en el precio del petróleo y la devaluación del precio de níquel.
En el año 2005 Skye Resources (Incorporada a la firma Hu-dBay Minerals Inc el 2008) comenzó el desarrollo del estudio de factibilidad, cuyos resultados dio a conocer en septiembre del 2006. El estudio incluía el reacondicionamiento y expansión de la mina y la planta existente, además de la construcción de una planta de generación de energía. Complementariamente se llevó a cabo una evaluación para procesar, mediante hidrometalurgia, la capa de limonita que cubre el depósito principal.
Los estudios de impacto ambiental para la mina, elaborados por Klohn Crippen Berger y la firma local Consultoría y Tecnología Ambiental S.A (CTA), comenzaron en el 2004 y fueron aprobados el 2006. Con la obtención de las licencias el año 2008 se dio inicio a la
FEnIx PROJECT IS A bROwnFIELD-type project located east of Guatemala, near El Elestor, Izabala. The deposit is formed by laterite nickel in the lower and upper parts, a limonite layer separated by an irregular transition layer.
Compañia Guatemalteca de Niquel S.A. (CGN), owned by HudBay Minerals Inc. (98.2%) and the Guatemala Government (1.8%) will manage the operation during its 30 years. The development model includes an open pit opera-tion and, in full production, it is expected to feed 1.5 million tons saprolite, with 1.6% average nic-kel grade, to the remodeled Exmibal processing plant. This plant was used until 1980, and closed due to oil price increase and low nickel price.
In 2005, Skye Resources (incorporated to HudBay Minerals Inc. in 2008) started developing the feasibility study, whose results were publis-hed in September 2006. The study included re-modeling and expansion of the existing mine and plant, in addition to a power plant construction. Also, an assessment was carried out regarding the processing, through hydrometallurgy, of the limonite layer covering the main deposit.
The mine Environmental Impact Studies, carried out by Klohn Crippen Berger and the local company Consultoria y Tecnologia Ambiental
Etapa / Stage Empresa/ Company
Periodo/ Period
2004 2005 2006 2007 2008 2009 2010 2011
Impacto Ambiental(1)
/ Environmental ImpactKlohn Crippen Berger, CTA
2004 - Q2 2006
Ingeniería conceptual/ Conceptual engineering
Hatch Consul-tors
2005 - 09/2006
Ingeniería de detalle / Detailed engineering
s/aQ4 2008 -
2011
etap
as
del p
roye
cto
pro
ject
sta
ges
fénix
397397Directorio de Empresas de Ingeniería y Construcción / CAPÍTuLO 7
Directory of Engineering and Construction Companies
31 años
R E L I A B L E A N D T I M E LY I N F O R M AT I O N
C A p Í T u l O 7directorio
de emPresasde inGenierÍa y construcción
D I R E C T O R Y
O F E N G I N E E R I N G A N D C O N S T R U C T I O N
C O M PA N I E S
C A T A S T R O D E
M I N E R O SPROYECTOS
MINING PROJECTS SURVEY
20112012www.minsurvey.com
31 años
R E L I A B L E A N D T I M E LY I N F O R M AT I O N
398 CATASTRO DE PROyECTOS MINEROS 2011 - 2012
Mining Projects Survey 2010-2012
ACD Consultores AmbientalesEcotecnica GeoconsultGolder Associates ArgentinaHatch Argentina Ingeniería di Bacco
Intergeo Argentina Knight Piésold Argentina ConsultoresLihue IngenieríaLM-ING Penta SurSade Ingeniería y Construcción
Serman & Asoc. SGS Argentina Skanska Techint ArgentinaTecnet Vector Argentina
Argentina
ACD CONSULTORES AMBIENTALES
Dirección / Address : Balcarce 954, Santa FeCiudad / City : RosarioTeléfono / Telephone : (54-341) 440 4399Fax : (54-341) 440 4399Internet : www.acdambiental.com.arE-mail : mandrews@acdambiental.
com.ar
Personal Ejecutivo / executivesDirector : Matthew Andrews
Servicios / services• Estudios de línea de base ambiental
/ Environmental base line studies • Estudios de impacto ambiental
/ Environmental impact studies• Estudios de impacto socioeconómico
/ Socio-economic impact studies• Planes de gestión ambiental
/ Environmental management plans•Planes de cierre / Closure plans•Planificación ambiental / Environmental planning• Programas de rehabilitación y revegetación
/ Programs for rehabilitation and revegetation
ECOTÉCNICA
Dirección / Address : Paraguay 792 piso 5Ciudad / City : Buenos AiresTeléfono / Telephone : (54-11) 4312 6904Fax : (54-11) 4312 6904Internet : www.ecotecnica.com.ar E-mail : [email protected]
Servicios / services• Análisis de riesgos ambientales
/ Environmental risk analysis•Auditorías ambientales / Environmental auditing•Cursos de inducción / Induction courses• Estudios de impacto ambiental
/ Environmental impact studies
•Estudios de línea de base / Base line studies•Planes de cierre / Mine closure plans• Planes de emergencia y contingencia
/ Emergency and contingency plans• Planes de gestión ambiental
/ Environmental management plans•Programas de monitoreo / Monitoring programs
GEOCONSULT
Dirección / Address : General César Días 1651/ 57
Ciudad / City : Buenos AiresTeléfono / Telephone : (54-11) 4103 1820Fax : (54-11) 4103 1820Internet : www.geoconsult.com.arE-mail : [email protected]
Servicios / services•Balance hidrogeológico / Hydrogeological balance• Caracterización geológica preliminar
/ Preliminary geological characterization•Cartografía / Cartography•Climatología / Climatology• Determinación del nivel de base ambiental
/ Determination of environmental base level•Inventario de industrias / Industry inventory• Previsión de impacto ambiental
/ Environmental impact precaution• Técnicas específicas de remediación
/ Specific repair techniques
GOLDER ASSOCIATES ARGENTINA
Dirección / Address : Del Bono 647Ciudad / City : San JuanTeléfonos/ Telephones : (54-264) 426 5844 : (54-264) 426 5944 : (54-264) 426 1377Fax : (54-264) 426 5844Internet : www.golder.com
E-mail : [email protected] [email protected]
Servicios / services• Construcción administración
/ Construction administration•Control medio ambiental / Environmental control• Control y monitoreo de Pendientes y Laderas
/ Control and monitoring of hanging walls•Monitoreo medio ambiental / Environmental monitoring•Cierre de minas / Mine closure•Consultoría en / Consultancy in
- Canchas de lixiviación / Leaching pads- Evaluación de impacto ambiental
/ Environmental impact assessment- Ingeniería geotécnica / Geotechnical engineering- Mecánica de rocas / Rock mechanics- Medio ambiente / Environment- Tratamientos / Processing- Tronadura / Blasting
•Servicios geotécnicos / Geotechnical services
HATCH ARGENTINA
Dirección / Address : Calle Mitre 625Ciudad : San JuanFono : (54-264) 420 3572Fax : (54-264) 420 3572Internet : www.hatch.ca
Servicios / services Ver servicios en Directorio de Chile / For services see Directory Chile
INGENIERÍA DI BACCO
Dirección / Address : Ruta 9 Km. 1298 Ciudad/ City : San Miguel TucumánTeléfono / Telephone : (54-381) 437 2206Fax : (54-381) 437 2194Internet : www.dibacco.com.arE-mail : [email protected]
399399Directorio de Empresas de Ingeniería y Construcción / CAPÍTuLO 7
Directory of Engineering and Construction Companies
Servicios / services• Análisis de constructibilidad / Constructability Estimation•Consultoría / Consultancy • Gestión y Ejecución de Proyectos
/ Project Managment and Development•Ingeniería Básica / Basic Engineering•Ingeniería de detalles / Detail Engineering•Mantenimiento y Reparación / Maintenance and Repair•Montajes Industriales / Industrial Assembly•Presupuestación / Budgeting•Planeamiento integral / Integral Planning•Plantas llave en mano / Turnkey Plants•Proyectos de ingeniería / Engineering Projects• Fabricación de partes y equipos completos / Fabrica-
tion of Parts and Complete Equipmen
INTERGEO ARGENTINA
Dirección / Address : Av. Triunvirato 2976Ciudad / City : Buenos AiresTeléfono / Telephone : (54-11) 455 37266 : (54 -911) 443 86088Fax : (54-11) 455 37266Internet : www.intergeo-consulting.
comE-mail : patricia.marino@intergeo-
consulting.com
Personal Ejecutivo / executivesDirector : Patricia C. MarinoE-mail : patricia.marino@intergeo-
consulting.com
Servicios / services•Análisis de Riesgos / Risk assessment•Auditorías / Auditing• Ingeniería y Consultoría Ambiental
/ Environmental engineering and consultancy• Implementación de sistemas de gestión
/ Implementation of management systems• Proyectos de remediación de suelos y aguas sub-
terráneas y superficiales / Remediation of soils, underground and surface water
KNIGHT PIÉSOLD ARGENTINA CONSULTORES
Dirección / Address : 25 de Mayo 234 OesteCiudad / City : San JuanTeléfono / Telephone : (54-262) 421 0014Fax : (54-262) 421 0014Internet : www.knightpiesold.comE-mail : [email protected]
Servicios / services•Caracterización de desechos / Waste analysis•Cierre de mina / Mine closure
• Diseño de áreas de pilas de lixiviación / Leaching pad design
• Manejo de desechos mineros / Mining waste handling•Manejo de relaves / Tailings handling•Manejo de las aguas / Water handling•Mecánica de rocas / Rock mechanics•Medio Ambiente / Environment
LIHUE INGENIERÍA
Dirección / Address : Diagonal 78 N° 1348. Villa Zagala.
Ciudad / City : Buenos AiresTeléfono / Telephone : (54-11) 471 33137Fax : (54-11) 472 40093Internet : www.lihue.com.ar
Servicios / services•Análisis de riesgo / Risk assessment•Asesoramiento normativo / Normative assessment•Auditoría / Auditing•Control de erosión / Erosion control• Estudios de impacto ambiental
/ Environmental impact studies•Estudios de factibilidad y tratabilidad de residuos
/ Feasibility and residuals treatment studies•Gestión de residuos sólidos urbanos
/ Managment of urban solid residues•Monitoreo y tratamiento de efluentes
/ Effluent monitoring and treatment•Remediación de suelos y aguas contaminadas
/ Remediation of soils and contaminated water•Sistemas de gestión / Management systems
LM-ING
Dirección / Address : Av. 44 esq. 2053, piso 1Ciudad / City : La PlataTeléfono / Telephone : (54-221) 479 5196Fax : (54-221) 470 8307Internet : www.lming.com.ar E-mail : [email protected]
Servicios / services•Diseño de cañerías de procesos / Process piping design•Diseño de instalaciones industriales
/ Design of industrial installations•Ingeniería Básica / Basic engineering•Ingeniería Detalle / Detailed engineering•Inspección de Equipos y Cañerías
/ Equipment and piping inspection
PENTA SUR
Dirección / Address Maipú 780Ciudad / City TucumánTeléfono / Telephone (54-381) 422 6151
Fax (54-381) 497 5757Internet www.penta.netE-mail [email protected]
Servicios / services•Almacenamiento y terminales
/ Bulk storage and terminals •Análisis de medio ambiente / Environmental analysis •Análisis de reservas / Reserve analysis •Diseño de ingeniería / Design engineering •Estudio de plazos / Time studies •Estudios de factibilidad / Feasibility studies •Manejo de material / Material Handling •Minería y excavación de minerales
/ Mining/Quarrying of raw materials •Molienda y procesamiento / Grinding and processing •Presupuestos / Capital budgeting •Presupuestos de operación / Operating budgeting •Servicios de construcción / Construction services •Servicios medioambientales / Environmental services •Ventilación de minas / Mine ventilation
SADE INGENIERÍA Y CONSTRUCCIONES
Dirección / Address : Av. Pte. Roque Saenz Peña 788
Ciudad / City : Buenos AiresTeléfono / Telephone : (54-11) 4341 7000Fax: : (54-11) 4341 7080
Servicios / services•Construcción / Construction•Ingeniería de proyectos / Project engineering
SERMAN & ASOC.
Dirección / Address : Blanco Encalada 2387 P.21Ciudad / City : Buenos AiresTeléfono / Telephone : (54-11) 478 67577Fax: : (54-11) 478 67727Internet : www.serman.com.ar
Servicios / services•Asistencia técnica / Technical assistence•Auditorías / Auditing•Desarrollo institucional / Institutional development•Estrategia y planificación de proyectos
/ Project strategies and planification•Gestión y formulación de proyectos
/ Project managment and formulation•Ingeniería básica / Basic engineering•Ingeniería de detalle / Detailed engineering•Estudios de base / Base studies•Estudios y simulación de fenómenos hidrometeo-
rológicos e inundaciones / Study and simulation of hydrometeorological fenomenom and floodings
419419Directorio de Empresas Junior / CAPÍTuLO 8
Directory of Juniors Companies
C A p Í T u l O 8directorio
de emPresasJunior
D I R E C T O R YO F J U N I O R
C O M PA N I E S
C A T A S T R O D E
M I N E R O SPROYECTOS
MINING PROJECTS SURVEY
20112012
31 años
R E L I A B L E A N D T I M E LY I N F O R M AT I O N
www.minsurvey.com
420 CATASTRO DE PROyECTOS MINEROS 2011 - 2012
Mining Projects Survey 2011-2012
Este capítulo incluye una selección de empresas junior que se encuen-tran desarrollando actividades de exploración en Argentina, Brasil, Chile y Perú. Este tipo de compañías mineras se dedica básicamente a la exploración de yacimientos. En general, no cuentan con operaciones mineras en producción, sino solamente con propiedades en prospec-ción o exploración.
This chapter includes a selection of junior mining companies that are active in South America, particularly in Argentina, Brazil, Chile and Peru. This type of mining companies are mainly dedicated to exploration of ore deposits. In general, they do not have mining sites under operation, but only properties under prospection or exploration.
ACERO-MARTIN RESOURCES
AGUILA AMERICAN RESOURCES
ALDERSHOT RESOURCES
ALEXANDER MINING
ALTURAS MINERALS
AMARILLO GOLD
AMAZON MINING
AMERA RESOURCES
AMERIX PRECIOUS METALS
ANACONDA MINING
ANDEAN AMERICAN MINING
ANDEAN RESOURCES
ANDINA MINERALS
ANTARES MINERALS
APOQUINDO MINERALS
ARGENTEX MINING
ATNA RESOURCES
AUEX VENTURES
AURA MINERALS
AUSTRAL GOLD
BEAR CREEK MINING
BRAZAURO RESOURCES
BRAZILIAN DIAMONDS
BRETT RESOURCES
BROOKMOUNT EXPLORATION
CANADIAN SHIELD RESOURCES
CANDENTE
CAPELLA RESOURCES
CARDERO RESOURCES
CASTILLIAN RESOURCES
CATALINA RESOURCES
CELESTE COPPER
CHARIOT RESOURCES
COLOSSUS MINERALS
CONDOR RESOURCES
CONSTITUTION MINING
CORO MINING
COUGAR METALS
CRUSADER RESOURCES
CUERVO RESOURCES
Empresas Junior
DOREX MINERALS
ECOMETALS
ESPERANZA SILVER CORPORATION
EXETER RESOURCE
EXPLORATOR RESOURCES
FAR WEST MINING
FORTUNE VALLEY RESOURCES
FRANC-OR RESOURCES
GALILEO MINERALS
GEOLOGIX EXPLORATIONS
GINGURO EXPLORATION
GITENNES EXPLORATION
GLOBAL COPPER
GLOBAL GOLD
GLOBAL HUNTER
GOLDEN ARROW RESOURCES
GOLDEN PEAKS RESOURCES
GOLDEYE EXPLORATIONS
GOLDMARK MINERALS
GRENVILLE GOLD
HERENCIA RESOURCES
HIDEFIELDS GOLD
HORIZONTE MINERALS
INCA PACIFIC RESOURCES
INTERNATIONAL MINERALS
INTERNATIONAL NICKEL VENTURES
INTERNATIONAL PBX
INTREPID MINERALS
IRON CREEK CAPITAL
KARMIN EXPLORATION
LA MANCHA RESOURCES
LARA EXPLORATION
LOS ANDES COPPER
LUMINA COPPER
LUNDIN MINING
MAGELLAN MINERALS
MANDALAY RESOURCES
MANSFIELD MINERALS
MEDINAH MINERALS
MINERA ANDES
MINERA IRL
MINERA PEREGRINE
MIRASOL RESOURCES
MUNDO MINERALS
NETWORK EXPLORATION
NEW DIMENSION RESOURCES
NEWGOLD
NGEX RESOURCES
PANAMERICAN SILVER
PANORO MINERALS
PLEXMAR RESOURCES
POLAR STAR MINING
RADIUS GOLD
RED LAKE EXPLORATION
REY RESOURCES
RIO CRISTAL ZINC
ROCKWELL DIAMONDS
SAMEX MINING
SAVANT EXPLORATIONS
SILVER STANDARD RESOURCES
SOLEX RESOURCES
SOLITARIO EXPLORATION & ROYALTY
SOLOMON RESOURCES LIMITED
SOUTH AMERICAN GOLD AND COPPER COMPANY
SOUTH AMERICAN SILVER
SOUTHERN HEMISPHERE MINING
SOUTHWESTERN RESOURCES
SOUTHWESTERN GOLD
ST. ELIAS MINES
STRAIT GOLD
STRIKE RESOURCES
TALON METALS
VALENCIA VENTURES
VENA RESOURCES
WHITE MOUNTAIN TITANIUM
ZINCORE METALS
421421Directorio de Empresas Junior / CAPÍTuLO 8
Directory of Juniors Companies
ACERO-MARTIN RESOURCES
Dirección / Address : 1601, 700 West Pender Street Vancouver, BC, Canada, V6C 1G8
Teléfono / Telephone : (1-877) 646 0067Fax : (1-604) 646 0640Internet : www.aceromartinexp.comE-Mail : [email protected]
Prospectos en Chile / prospects in chile•La Mamita•Minas Lucho•Pinaya Gold
AGUILA AMERICAN RESOURCES
Dirección / Address : 1305 - 1090 W. Georgia Street
: Vancouver, BC, : Canada, V6E 3V7Teléfono / Telephone : (1-604) 633 0998Fax : (1-604) 646 0640Internet : www.aguilaamerican.caE-Mail : [email protected]
Proyecto en Perú / project in peru: •Angostura
ALDERSHOT RESOURCES
Dirección / Address : Suite 209, Old Stock Exchange Building
: 475 Howe Street : Vancouver, B.C. : Canada, V6C 2B3Teléfono / Telephone : (1-604) 682 6718Fax : (1-604) 682 6722Internet : www.aldershotresources.comE-Mail : [email protected]
Prospectos en Chile / prospects in chile•Hornitos (option)
ALEXANDER MINING
Dirección / Address : 1st Floor, 35 Piccadilly, London, W1J 0DW UKTeléfono / Telephone : (44-20) 7292 1300Fax : (44-20) 7292 1313Internet : www.alexandermining.comE-Mail : [email protected]
Prospectos y Proyectos en Chile / prospects and projects in chile: •Argentina•León
•Perú•Malinetes
ALTURAS MINERALS
Dirección / Address : 330 Bay Street, Suite 820 Toronto, ON CanadáTeléfono / Telephone : (1-416) 366 5555Fax : (1-416) 703 6515Internet : www.alturasminerals.com
Perú:Dirección / Address : Manuel de Falla 297, Piso 5,
San Borja Lima, PerúTeléfono / Telephone : (51-1) 475 1700Fax : (51-1) 225 1233
Prospectos y Proyectos en Perú / prospects and projects in peru: •Baños del Indio•Callejones•Ccaccapaqui•Chavina•Huajoto•Huilacollo•La Divina•Pampa Colorada•Pausa•San Antonio•Sombrero•Utupara / Chapi Chapi
AMARILLO GOLD
Dirección / Address : Suite 2833 - 595 Burrard Street Vancouver, BC
Canadá V7X 1C4Teléfono / Telephone : (1-604) 689 1799Fax : (1-604) 689 8199Internet : www.amarillogold.comE-Mail : [email protected]
Brasil / BrazilRazón Social : Amarillo Mineraçao / Business Name do Brasil LtdaDirección / Address : Rua Pernambuco 353, sala
409 : Bairro Funcionarios, Belo
Horizonte, MG Brasil CEP 30130-151Teléfono / Telephone : (55-31) 3261 5974
Proyectos en Brasil / projects in Brazil: •Lavros do Sul•Mara Rosa•Ourolandia•Santo Antonio
AMAZON MINING
United KingdomDirección / Address : Salatin House 19 Cedar Road Surrey SM2 5DA United KingdomTeléfono / Telephone : (44-20) 8816 7641Fax : (44-20) 7405 7773Internet : www.amazonplc.comE-Mail : [email protected]
CanadáDirección / Address : 47 Colborne Street, Suite
307 Toronto, ON Canada M5E 1P8
Teléfono / Telephone : (1-416) 866 2966Fax : (1-416) 866 8829
Brasil / BrazilDirección / Address : 430 Av. Antonio Abrahao
Caram, sala 301 Bairro Sao Jose Belo Horizonte MG
Teléfono / Telephone : (55-31) 3245 0205
Proyecto en Brasil / project in Brazil: •Madeira•Mimoso •Tucano vanadio
AMERA RESOURCES
Dirección / Address : Suite 709, 837 West Has-tings Street Vancouver, BC Canada V6C 3N6
Teléfono / Telephone : (1-604) 687 1828Fax : (1-604) 687 1858Internet : www.ameraresources.comE-Mail : [email protected]
Prospectos / prospects:
Argentina•Mogote
Peru•Acero•Cocha•Fuyani•Loma Colorado•Mitu
AMERIX PRECIOUS METALS
Dirección / Address : 302 - 65 Queen Street West Toronto, ON Canada, M5H 2M5
Teléfono / Telephone : (1-416) 637 4625Fax : (1-416) 203 4197
435435ANExO - TABLAS
Tables
31 años
R E L I A B L E A N D T I M E LY I N F O R M AT I O N
C A T A S T R O D E
M I N E R O SPROYECTOS
MINING PROJECTS SURVEY
20112012
anexo
tablas
TA B L E S
www.minsurvey.com
31 años
R E L I A B L E A N D T I M E LY I N F O R M AT I O N
436 CATASTRO DE PROyECTOS MINEROS 2011 - 2012
Mining Projects Survey 2011-2012
ARGENTINA Pascua Lama * Construcción / Construction 3.300 - 3.600 Barrick Gold Canadá / Canada Don Nicolás Estudio / Study 60 Minera IRL Limited Perú / Peru Calcatreu Estudio / Study 79 Pan American Silver Canadá / Canada Lindero Estudio / Study 228 Mansfield Minerals Canadá / Canada Cerro Negro Estudio / Study 275 Goldcorp Canadá / Canada San Jorge Estudio / Study 277 Coro Mining Canadá / Canada Navidad Estudio / Study 760 Pan American Silver Canadá / Canada Agua Rica Estudio / Study 2.100 Yamana Gold Canadá / Canada Los Azules Estudio / Study 2.800 Minera Andes EE.UU., Canadá / USA, Canada El Pachón* Estudio / Study 2.400 - 3.000 Xstrata PLC Suiza / Switzerland Río Colorado Estudio / Study 3.364 Vale Brasil / Brazil Diablillos Estudio / Study s/a Silver Standard Resources Canadá / Canada Potrerillos Exploración / Exploration 2 Golden Arrow Resources Corporation Canadá / Canada Cerro Cuadrado Exploración / Exploration 7 NGEx Resources Canadá / Canada Vicuña * Exploración / Exploration 13 - 14 NGEx Resources 60% ; Jogmec 40% Canadá, Japón / Canada, Japan Taca Taca Exploración / Exploration s/a Lumina Copper Canadá / Canada Río Grande Exploración / Exploration s/a Regulus Resources 50 %; Pachamama Resources 50% Canadá / Canada Total Inversión / Total Investment 16.115 CHILE El Dorado Construcción / Construction 3 Zapata Inversiones Mineras E.I.R.L Chile Mantos Blancos - Construcción / Construction 26 Anglo American Reino Unido, Sudáfrica / UK, South Africa Expansión Santa Bárbara / Santa Barbara Expansion Cerro Bayo Construcción / Construction 30 Mandalay Resources Corp. Canadá / Canada Codelco El Teniente - Construcción / Construction 61 Codelco - División El Teniente Chile Diablo Regimiento III Lomas Bayas II Construcción / Construction 293 Xstrata Copper Suiza / Switzerland El Abra - Sulfolix Construcción / Construction 725 El Abra (Freeport-McMoRan 51%; Codelco 49%) EE.UU., Chile / USA, Chile Collahuasi Expansión 1 Construcción / Construction 750 Collahuasi (Anglo American plc 44%; Reino Unido-Sudáfrica, Suiza, Japón / Expansion 1 Xstrata 44%; Mitsui & Co. 12%) / UK-South Africa, Switzerland, Japan Codelco - Mina Ministro Hales - Construcción / Construction 1.605 Codelco - División Ministro Hales Chile Caserones Construcción / Construction 1.860 Minera Lumina Copper Chile (Pan Pacific Copper) Japón / Japan Los Bronces Desarrollo Construcción / Construction 2.300 - 2.500 Anglo American Reino Unido, Sudáfrica / UK, South Africa / Development SQM - Pampa Blanca Estudio / Study 20 SQM Chile El Tesoro - Mirador - Estudio / Study 65 Antofagasta Minerals 70%; Marubeni Corporation 30% Chile, Japon / Chile, Japan Mantos Blancos - Mercedes Estudio / Study 68 Anglo American Reino Unido, Sudáfrica / UK, South Africa Codelco El Teniente - Estudio / Study 179 Codelco - División El Teniente Chile Explotación Rajo Sur / Rajo Sur Exploitation Spence Optimización Estudio / Study 200 BHP Billiton Reino Unido - Australia / UK - Australia
TABLA 1 / TABLE 1 PROYECTOS SEgúN PAÍS, ETAPA, INvERSIóN Y ORIgEN DE INvERSIóN proJects By country, staGe, investMent and oriGin of investMent
PAÍS NOMBRE PROYECTO ETAPA INvERSIóN (uS$ MILLONES) EMPRESA PAÍS DE ORIgENcountry proJect naMe staGe investMent (us$ Million) coMpany country of oriGin
*Proyectos binacionales a lo largo de la frontera entre Chile y Argentina. / Binational projects along the frontier between Chile and Argentina.(1) Considera 50% de la inversión de los proyectos Pascua Lama, El Pachón y Vicuña. / Considers only 50% of the investment of the binational projects Pascua Lama, El Pachon and Vicuña.
437437ANExO - TABLAS
Tables
ARGENTINA Pascua Lama * Construcción / Construction 3.300 - 3.600 Barrick Gold Canadá / Canada Don Nicolás Estudio / Study 60 Minera IRL Limited Perú / Peru Calcatreu Estudio / Study 79 Pan American Silver Canadá / Canada Lindero Estudio / Study 228 Mansfield Minerals Canadá / Canada Cerro Negro Estudio / Study 275 Goldcorp Canadá / Canada San Jorge Estudio / Study 277 Coro Mining Canadá / Canada Navidad Estudio / Study 760 Pan American Silver Canadá / Canada Agua Rica Estudio / Study 2.100 Yamana Gold Canadá / Canada Los Azules Estudio / Study 2.800 Minera Andes EE.UU., Canadá / USA, Canada El Pachón* Estudio / Study 2.400 - 3.000 Xstrata PLC Suiza / Switzerland Río Colorado Estudio / Study 3.364 Vale Brasil / Brazil Diablillos Estudio / Study s/a Silver Standard Resources Canadá / Canada Potrerillos Exploración / Exploration 2 Golden Arrow Resources Corporation Canadá / Canada Cerro Cuadrado Exploración / Exploration 7 NGEx Resources Canadá / Canada Vicuña * Exploración / Exploration 13 - 14 NGEx Resources 60% ; Jogmec 40% Canadá, Japón / Canada, Japan Taca Taca Exploración / Exploration s/a Lumina Copper Canadá / Canada Río Grande Exploración / Exploration s/a Regulus Resources 50 %; Pachamama Resources 50% Canadá / Canada Total Inversión / Total Investment 16.115 CHILE El Dorado Construcción / Construction 3 Zapata Inversiones Mineras E.I.R.L Chile Mantos Blancos - Construcción / Construction 26 Anglo American Reino Unido, Sudáfrica / UK, South Africa Expansión Santa Bárbara / Santa Barbara Expansion Cerro Bayo Construcción / Construction 30 Mandalay Resources Corp. Canadá / Canada Codelco El Teniente - Construcción / Construction 61 Codelco - División El Teniente Chile Diablo Regimiento III Lomas Bayas II Construcción / Construction 293 Xstrata Copper Suiza / Switzerland El Abra - Sulfolix Construcción / Construction 725 El Abra (Freeport-McMoRan 51%; Codelco 49%) EE.UU., Chile / USA, Chile Collahuasi Expansión 1 Construcción / Construction 750 Collahuasi (Anglo American plc 44%; Reino Unido-Sudáfrica, Suiza, Japón / Expansion 1 Xstrata 44%; Mitsui & Co. 12%) / UK-South Africa, Switzerland, Japan Codelco - Mina Ministro Hales - Construcción / Construction 1.605 Codelco - División Ministro Hales Chile Caserones Construcción / Construction 1.860 Minera Lumina Copper Chile (Pan Pacific Copper) Japón / Japan Los Bronces Desarrollo Construcción / Construction 2.300 - 2.500 Anglo American Reino Unido, Sudáfrica / UK, South Africa / Development SQM - Pampa Blanca Estudio / Study 20 SQM Chile El Tesoro - Mirador - Estudio / Study 65 Antofagasta Minerals 70%; Marubeni Corporation 30% Chile, Japon / Chile, Japan Mantos Blancos - Mercedes Estudio / Study 68 Anglo American Reino Unido, Sudáfrica / UK, South Africa Codelco El Teniente - Estudio / Study 179 Codelco - División El Teniente Chile Explotación Rajo Sur / Rajo Sur Exploitation Spence Optimización Estudio / Study 200 BHP Billiton Reino Unido - Australia / UK - Australia
TABLA 1 / TABLE 1 PROYECTOS SEgúN PAÍS, ETAPA, INvERSIóN Y ORIgEN DE INvERSIóN proJects By country, staGe, investMent and oriGin of investMent
PAÍS NOMBRE PROYECTO ETAPA INvERSIóN (uS$ MILLONES) EMPRESA PAÍS DE ORIgENcountry proJect naMe staGe investMent (us$ Million) coMpany country of oriGin
Continúa en la próxima página / Continued on the next page
Edición Anual
Bilingüe (español-inglés)
Edición Bienal
Bilingüe (español-inglés)
Bilingüe (español-inglés)
Edición Anual
Más que un directorio, una completa guía de la Minería Chilena.
Recopilación única en su tipo, una completa herramienta de información técnica de equipos en la minería.
Completa información de las principales faenas productivas de la minería en Chile.
Herramienta de consulta para profesionales del sector energético. Permite conocer los diversos aspectos del mercado chileno.
ESTUDIOS & COMPENDIOS
Toda la información que su empresa necesita para acceder a nuevas oportunidades de negocios
LA EDITORIAL TÉCNICA Y DE NEGOCIOS LIDER DE CHILE
Además del ejemplar que tiene en sus manos, el Grupo Editorial Editec, a través de su área de Estudios & Compendios, pone a su disposición toda la información estratégica que su empresa necesita para ser un actor relevante de los sectores minero y energético de Chile.
¿Necesita más información?Contáctenos en [email protected]
Aviso ESTUDIOS.indd 4 23-08-11 18:26