MKE4 Rearrangement - TCM 25 August 2015 1
MKE4 Rearrangement
- Updated Drawings- Visit to ECA4- Visit to LSS4- SPS Safety File- Safety during intervention
MKE4 Rearrangement - TCM 25 August 2015 2
Drawings ECA4 – Present configuration
Drawings for present configuration were found !
- Drawings now up to date.
- Needs to be validated and published to CDD
(Drawing number problem ?)
MKE4 Rearrangement - TCM 25 August 2015 3
Drawings ECA4 – Future configuration
- Drawings up to date.
- Minor corrections requested
- Needs to be validated and published to CDD
(Drawing number problem ?)
Should we show the spare parts(PFN/ switches/DB) ?
MKE4 Rearrangement - TCM 25 August 2015 4
Drawings LSS4 – Present configuration
- Drawings up to date for present configuration.
- Needs updated drawings for future configuration.
- Needs to be validated and published to CDD
Þ Required for ECR !
LSS4 Integration drawing to be updated by EN/MEF and TE/VSC
MKE4 Rearrangement - TCM 25 August 2015 5
Visit to ECA4 – Water pipes
Two visit with people from:TE/ABT, EN/MEF, BE/ASR, DGS/SEE, etc…
Water distribution for GEN1:- Remove water pipes on ground- Remove clarinette behind pillar
=> Done by FPS.
(GEN2 is connected to another clarinette).
MKE4 Rearrangement - TCM 25 August 2015 6
Visit to ECA4 – Cable support
Cable support for GEN1:- Remove cables- Remove cable support / pillars
Copper plan to be cut and removed
=> Done by FPS.
Cleaning of concreate after removal of copper plan (glue):
=> Done by external company ? (Patrick Vincent EN/MEF)
MKE4 Rearrangement - TCM 25 August 2015 7
Visit to ECA4 – Barrier not on wall
Reduction of kicker zone:
- Remove old barrier and move it to close zone.
=> Done by external company ? (Patrick Vincent EN/MEF)
Problems:- Water pipes- Cables support- Wall not vertical
=> Difficult to completely close the kicker area
HSE (Ana):L’idéal serait que les parois coupe-feu vont jusqu’au mur pour avoir une étanchéité maximum du local et par conséquente la meilleure protection contre un possible feu.
MKE4 Rearrangement - TCM 25 August 2015 8
Visit to LSS4 / LSS6 during next TS
Visit of LSS4 / LSS6 during next TS:
- Impact: 68200 / 68484– Waiting for approval
- With people from TE/ABT, EN/MEF, BE/ASR, DGS/SEE, etc…
=> Please give me the list of people to add to the Impact.
MKE4 Rearrangement - TCM 25 August 2015 9
SPS Safety filesContact BE/ASR : Anne Funken / Lisa Kobzeva
SPS safety file not yet available, in preparation.
- BE/ASR will prepare the safety file.- Nothing to do from our side, just answer questions…- Needs a visit to LSS4 (planned for next TS).- Needs updated drawing Present / Future
Example: PS safety files available on EDMS: CERN-0000094160
=> Invite Lisa or Anne to explain about SPS safety file in another TCM ?
MKE4 Rearrangement - TCM 25 August 2015 10
SPS Safety files - QuestionsAlready answered some questions (Thanks to Francesco):
- Type of oil in generators: Code SCEM : 57.97.20.099.9 : https://edh.cern.ch/edhcat/Images/192536/57.97.20.100.FSFR.pdf
- Quantity of oil in generators (ECA4):- 1x PFN = 1200 L- 2x Switch = 1000 L- 1x TDR = 10 L
=> ~ 3210 L per generator
Total present configuration: 5x generators = ~16000 LTotal future configuration: 1x generator = ~ 3200 L
- Type of material used for barrier = Fire resistant.
- Etc..
MKE4 Rearrangement - TCM 25 August 2015 11
Safety during InterventionContact DGS/SEE: Ana Marta Formigo Da Cunha
‘Launch Safety Agreement’ to come after vacations…
Already some info on ‘la manipulation, transport et stockage, d’huile’:
1 – Contacter Claudia Bruggmann du Centre de stockage de déchets chimiques bât.2622 - Identifier le récipient avec l’étiquette 10 ou 11 du SCEM 50.55.20 3 – Il faut tenir en compte les règles de Sécurité CERN suivantes:- SR-C - Agents chimiques- GSI-C1 - Prévention et mesures de protection- Guide de Sécurité C-1-0-1 - Stockage des agents chimiques dangereux
=> TE/ABT procedure for manipulation and transport of oil ?