Rapid Response Launcher System (RRLS)
Austin
![Page 2: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/2.jpg)
Ramirez, UrielJohnson, LindaniGonzalez, Austin Solomon-Williams, Cordarryl M. Smith, JosephKnill, Christian
Austin
![Page 3: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/3.jpg)
Problem StatementA rocket system to set a network of Search & Rescue Satellites
?
Austin
![Page 4: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/4.jpg)
““In light of the MH 370 tragedy in the spring of 2014, an interest has arisen to investigate the feasibility of a rapid response launcher system for a constellation of simple, lightweight search satellites with a minimum orbital lifetime of 6 months.”
Austin
![Page 5: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/5.jpg)
Payload - 100lb S&R Satellite
Orbit - Circular Sun Synchronous at an altitude of 165 km
Launch Location - Poker Flat Research Range, AK65.1167° N Lat, 147.4612° W Lon, 436.7 m above sea level
Mission RequirementsAustin
![Page 6: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/6.jpg)
Extraneous RequirementsEnvironmentally Friendly Propellant System
Total system weight less than 10,000kg
Minimum orbital lifetime 6 months
Austin
![Page 7: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/7.jpg)
Missing PlanesAustin
Poker Flat Research Range, AK
MH 370
![Page 8: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/8.jpg)
Orbital Elements from STKPeriod 5267.32 sec
SemiMajor Axis 6543.14 km
Eccencenity 9.33702 e-018
Inclination 96.2587 deg
Argument of Perigee 0 deg
True Anomaly 359.924 deg
Ascending Node 126.994 deg
cordarryl
![Page 9: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/9.jpg)
Satellite Tool Kit Simulation Verification(2D Graphic of Earth)
cordarryl
![Page 10: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/10.jpg)
Satellite Tool Kit Simulation Verification(3D Graphic of Earth)
cordarryl
![Page 11: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/11.jpg)
Preliminary Design?
chris
![Page 12: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/12.jpg)
ΔV Design 1Burnout Velocity -
Velocity of Launch site -
chris
![Page 13: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/13.jpg)
ΔV Design 2Velocity Needed -
Design Velocity -
Assuming losses of 0.9km/s
chris
![Page 14: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/14.jpg)
Three stages:Stage 1 will produce a ΔV = 3.5 km/sStage 2 will produce a ΔV = 3.5 km/sStage 3 will produce a ΔV = 2.25 km/s
Orbit Design
Source: Delta II Payload Planners Guide December 2006
chris
![Page 15: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/15.jpg)
Three Stage DesignPros
◇ Reasonable ISP will meet our needs
◇ Better finert values
Cons◇ More complicated due
to more staging◇ Larger inert mass
chris
![Page 16: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/16.jpg)
System Level Performance?
![Page 17: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/17.jpg)
Propellant ChoiceUriel
![Page 18: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/18.jpg)
Choosing H202 and HTPB allowed us to have a reasonable ISP and good finert that will not be technologically challenging
F2/H2 and O2/H2 had a large ISP, but too toxic.
O2/RP-1- Needed oxygen tanks
Propellant Trade OffsUriel
![Page 19: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/19.jpg)
An initial mass of about 5500 kg, ISP of 285s and finert of 0.28 was chosen.
The ISP of 285 allowed us to account for pressure losses in our system with the chosen propellant.
Preliminary Sizing: Stage 1Uriel
![Page 20: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/20.jpg)
Helium pressurizes the propellant tanks to force the fuel and oxidizer tanks to the combustion chamberPros:◇ Simple, due to less
components◇ Easy to maintain
Cons:◇ Extra weight added
because of the pressurant tanks
Uriel
Pressure-fed engine
![Page 21: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/21.jpg)
Injector in a liquid rocket engine mixes the fuel with the oxidizer to produce efficient and stable combustion
This figure shows an injector designed with propellant valves (remote control)
cordarryl
Injector
![Page 22: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/22.jpg)
Injector Types
![Page 23: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/23.jpg)
AUTOCAD DRAWING Nozzle efficiency 97 %
Lindani
Nozzle Sizes
![Page 24: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/24.jpg)
Our design conditions were best met by ablative coolingThe ablative material absorbs the heat as it ablates
Lindani
Cooling Type
![Page 25: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/25.jpg)
Pros:◇ Simple◇ Capable of stopping
and restarting the engine, as long there is ablative material left
Cons:◇ Increase of weight◇ Limited life in the
engine (usually less than 2000 seconds)
Typical ablative materials: Silica, Quartz, or Carbon Cloth and resin composites
Cooling Type Trade offs
![Page 26: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/26.jpg)
Material Density (kg/m3) Ultimate Tensile Strength (GPa)
Specific Ultimate Tensile Strength (Gpa/(kg/m3))
2219 Aluminum 2800 0.413 15.04
Titanium 4460 1.23 28.81
4130 Steel 7830 0.892 11.23
Graphite 1550 0.895 58.88SOURCE: Space Propulsion Analysis and Design, Humble, Henry, and Larson
Joseph
Pressure Tank Material
![Page 27: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/27.jpg)
Titanium has the best mechanical properties, but is difficult to work with and extremely expensive.
Steel is cheap and easy to work with, but does not have the properties required for our design.
Composites meet the property requirements and are lightweight. Our rocket cost increases, within reason.
Material Trade offsDue to the addition of the pressurant tanks, composite materials were chosen to minimize the mass and therefore increase the ΔVThis increased the cost of our rocket.
![Page 28: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/28.jpg)
Final Predicted Design Results?
Joseph
![Page 29: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/29.jpg)
ISP (s) (from RPA
code)
Initial Mass (kg)
Propellant Mass (kg)
Thrust (kN)
Burn time (s)
ΔV (m/s) (Actual)
Stage 1 287 5550 3904 2698 4 3348
Stage 2 287 900 637 53 33 3317
Stage 3 287 200 109 12 26 2798
Total 9463The actual ΔV, considering all the actual masses, is 2.5% bigger
than design.
Joseph
Final Predicted Results
![Page 30: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/30.jpg)
Altitude SimulationLindani
![Page 31: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/31.jpg)
Velocity SimulationLindani
![Page 32: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/32.jpg)
Mass SimulationLindani
![Page 33: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/33.jpg)
ConclusionTheoretically, it is feasible. ?
Austin
![Page 34: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/34.jpg)
Justifications1. Small propulsion system to achieve an orbit
2. Uses current technologies proven to work
3. Performs a meaningful and desirable task
![Page 35: MMAE 412 Final Briefing (1)](https://reader035.vdocument.in/reader035/viewer/2022062904/58866a3c1a28ab7d408b56e9/html5/thumbnails/35.jpg)
THE END