Mock up activities• Status
– 12-07-2011 :Reception of the pit table at CERN
– Since a week, installation of the optical fibbers on the mock up, side A done, side C on progress
– Installation and adjustment of the pit table on the rotating table during the week 29
– Installation of the wire tension system during week 29
3
LPSC Tooling fabrication progress
Thin tables and container(delivery week31/32)
Pit table delivered to CERN
Pit table assemble with thin table Intermediate table assembly (delivery week30)
4
Test schedule