Module 14 Cost Behavior and Cost Estimation
2
Introduction
What is the nature of costs and how are they used in decision making?Do they increase or decrease as production volume changes?Do they remain stable?How can we use cost behavior to predict future costs?
3
The Behavior of Fixed Costs
Fixed Costs remain the same in total, but may vary per unit when production volume changes.
Examples: Rent, Depreciation, Salary of a Plant Manager, Insurance, Property Taxes
Volume
$ Total Fixed Costs
Volume
$Fixed Cost Per Unit
100
25 50 75
4
25 50
2
75
1.33
4
The Behavior of Variable Costs
Variable Costs vary in direct proportion to changes in production volume, but are fixed when expressed as per-unit amounts.Examples: Direct material, some direct labor, and other unit-level costs like factory supplies.
Volume
$ Total Variable Costs
Volume
$ Variable Cost Per Unit
25
50
50
100
75
150
25 50 75
2
0
5
Cost
Volume
Relevant Range
Straight-Line
Approximation
Curvilinear
Function
Curvilinear Costs and the Relevant Range
6
Costs Within the Relevant Range
Within the relevant range:Total fixed costs are constant.Fixed cost per unit decreases as units
increase. Total variable costs increase as units
increase. Variable cost per unit is constant.
Use the constant measures to create a linear relationship.
7
Cost
Volume
Mixed Costs (Fixed and Variable)
Fixed
Variable
00
8
The Cost Equation(for mixed costs)
Y = a + bX
Y = total costs.
a = total fixed costs (intercept of line).
b = variable cost per unit (slope of line).
X = units produced.
9
Cost Behavior and Decision Making
For Pizza Pete’s:
Assume that direct materials were $2 per pizza, direct labor was $1.50 per pizza, and variable overhead was $1.00 per pizza, and that $6,300 is fixed overhead.
What would be the cost of goods sold
(1) for 2,600 pizzas?(2) for 1,000 pizzas?
10
Cost Behavior and Decision Making
Direct materials
Direct labor
Variable OH
Fixed OH
Total COGS
COGS per Unit
$2.00
$1.50
$1.00
$5,200
3,900
2,600
6,300
$18,000
2,600 1,000
$ 2,000
1,500
1,000
6,300
$10,800
$6.92 $10.80
Alternative – use formula: Y = a + bX
11
Mixed Costs
Fixed and Variable Components of Pizza Pete’s:
Fixed: lease payment each month.
Variable: pizza components, wages, electricity, etc., that vary with the number of deliveries made (and miles driven).
12
Separating Mixed Costs into their Fixed and Variable Components
•High-Low Method: an algebraic technique of solving for the slope (variable cost per unit) and intercept (fixed costs) of a line, by using the high and low observations (coordinates) of the line.
•Regression Analysis: A statistical technique used to estimate the slope (VCU) and intercept (FC) components of a mixed cost is called least squares regression. Regression analysis uses statistical methods to fit a cost line (regression line) through a set of points which minimizes the sum of the squared distance from each data point to the line (hence the name least squares regression).
13
Estimating Slope and Intercept Using the High-Low Method
1. Use only two data points, the high and low levels of activity and their related total overhead costs.
2. Subtract the smallest from the largest for each and use the changes in the following formula.
Change in volume= Variable cost per unit
3. Change in Cost
14
Estimating Slope and Intercept Using the High-Low Method
4. Substitute the total cost and activity of one of the points for “y” and “x” in the equation y = a + bx .
5. Substitute the variable cost found using high-low for “b” .
6. Solve for fixed costs “a” .
7. Determine the formula to use in estimating the mixed costs at various levels .
15
Estimating Slope and Intercept Using the High-Low Method
Example:1. High Point = 2,500 units at $12,450 Low Point = 1,950 units at $10,5252. 2,500 - 1,950 = 550 units (change in units) $12,450 - $10,525 = $1,925 (change in cost)3. $1,925 / 550 units = $3.50 variable cost/unit
16
Estimating Slope and Intercept Using the High-Low Method
Steps 4,5,6 Y =
$12,450 =
$12,450 =
$3,700 =
Y =
a + bx
a + $3.50 (2,500)
a + $8,750
a
$3,700 + $3.50x
7. Y = $3,700 + $3.50 (X) (formula to use to estimate costs)
Cost at high pt
Volume at high pt
Fixed Costs
Variable Costs
17
Least Squares Regression Analysis
TotalCosts
Slope of Regression Line = Variable Cost
per unit
Fixed
Cost
Regression Line =Total Overhead Cost
Volume1 unit
? $
Slope represents the change in $ for a 1 unit change in volume
18
Regression StatisticsBenefits of regression:Uses all of the observations, not just high and low.Resulting measures offer insight into the quality of the output.R2 (r-squared) indicates the goodness of fit for the model. Range between 0 and 1, a high R2 indicates that the relationship between the independent variable and the dependent variable explains most of the change in cost.Problem: output may indicate a relationship, even when there is no relationship.
19
Using a Spreadsheet Program to Perform Regression Analysis
Using the actual values of the mixed costs (dependent variable) and the volume of production (independent variable) and a spreadsheet program such as Excel, you can compute a regression line using least squares regression.