![Page 1: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/1.jpg)
Moving a cyclotron control room from old to new location with no lost
time
Jozef Orzechowski – TRIUMF – WAO 2012
![Page 2: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/2.jpg)
Introduction
Jozef Orzechowski – TRIUMF – WAO 2012
![Page 3: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/3.jpg)
Jozef Orzechowski – TRIUMF – WAO 2012
Applied Technology Group-Introduction – who we are, what we do?
- Why do we needed a new control room?
- Cyclotron control room move preparation
- Cyclotron control room move
- Verification, validation
- Conclusion
![Page 4: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/4.jpg)
Introduction
Jozef Orzechowski – TRIUMF – WAO 2012
![Page 5: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/5.jpg)
Jozef Orzechowski – TRIUMF – WAO 2012
Applied Technology Group
- ATG is a TRIUMF’s group operating three cyclotrons- ATG provides irradiation services for commercial company NORDION- Beam is used for production of the several isotopes for medical application
![Page 6: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/6.jpg)
Applied Technology GroupWe operate three cyclotrons:-CP42, 42 MeV up to 200 µAmp – 1981-TR30-1, 30 MeV up to 1 mAmp – 1991-TR30-2, 30 MeV up to 1 mAmp – 2003Small group – 30 people, we operates, maintain/repair all our system as well as we design and build equipment
Jozef Orzechowski – TRIUMF – WAO 2012
![Page 7: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/7.jpg)
Three distinctive stages:1980 – first cyclotron - CP421991 – second cyclotron – TR30-12003 – third cyclotron – TR30-2
Jozef Orzechowski – TRIUMF – WAO 2012
![Page 8: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/8.jpg)
Why do we needed a new control room?
Jozef Orzechowski – TRIUMF – WAO 2012
![Page 9: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/9.jpg)
The simple answer is:the old one is too small
Jozef Orzechowski – TRIUMF – WAO 2012
![Page 10: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/10.jpg)
The old control room problems:-Too small- Hallway- Located in the evacuation zone
Jozef Orzechowski – TRIUMF – WAO 2012
![Page 11: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/11.jpg)
Old control room
Jozef Orzechowski – TRIUMF – WAO 2012
![Page 12: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/12.jpg)
Cyclotron control room move preparation
Jozef Orzechowski – TRIUMF – WAO 2012
![Page 13: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/13.jpg)
There was only one requirement:
Move it fast
Jozef Orzechowski – TRIUMF - WAO 2012
![Page 14: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/14.jpg)
Preparation:-Inventory of the modifications-Planning the modifications
-using the cyclotrons maintenance days
- Identifying needed equipment- Implementing the modifications- Regulatory requirements
Jozef Orzechowski – TRIUMF - WAO 2012
![Page 15: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/15.jpg)
Grey Hill PLC
Jozef Orzechowski – TRIUMF - WAO 2012
![Page 16: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/16.jpg)
Iconic Genesis for Windows HMIJozef Orzechowski – TRIUMF - 2012
![Page 17: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/17.jpg)
Regulatory requirements:
-Human Factors Engineering Report-Verification and validation
Jozef Orzechowski – TRIUMF - WAO 2012
![Page 18: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/18.jpg)
Human Factors Engineering Report Human Machine Interface Systems
Job DesignOperating Experience ReviewPhysical Working Environment
Human ReliabilityShift Work Systems and Staffing
ValidationVerification
Jozef Orzechowski – TRIUMF - WAO 2012
![Page 19: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/19.jpg)
Move into new control room
-Fast-Painless
Jozef Orzechowski – TRIUMF - WAO 2012
![Page 20: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/20.jpg)
The new cyclotron control room
Jozef Orzechowski – TRIUMF - WAO 2012
![Page 21: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/21.jpg)
Verification, Validation
Jozef Orzechowski – TRIUMF - WAO 2012
![Page 22: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/22.jpg)
Operators feedback was used to verify and validate that we met all the requirements
Jozef Orzechowski – TRIUMF – WAO 2012
![Page 23: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/23.jpg)
-Some small issues identified and corrected
- Alarm panel size identified as a problem
Jozef Orzechowski – TRIUMF – WAO 2012
![Page 24: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/24.jpg)
New alarm panel
Jozef Orzechowski – TRIUMF – WAO 2012
![Page 25: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/25.jpg)
Move went well, but after ten years in the new (now old)control we discover (surprise) that is small again
Jozef Orzechowski – TRIUMF – WAO 2012
![Page 26: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/26.jpg)
Conclusion
Think big
Jozef Orzechowski – TRIUMF – WAO 2012
![Page 27: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/27.jpg)
Acknowledgement
R. Van den Elzen- TRIUMFJ. Lofvendahl – TRIUMFR. Bloemhard – LBNL
Jozef Orzechowski – TRIUMF – WAO 2012
![Page 28: Moving a cyclotron control room from old to new location with no lost time](https://reader036.vdocument.in/reader036/viewer/2022070420/56815e8b550346895dcd1b52/html5/thumbnails/28.jpg)
Thank you!
Jozef Orzechowski – TRIUMF – WAO 2012