Provisioning Activities to Date
1994 to dateDependent on Fixed Line Operator
MTN Pilot projectJune’07 – Aug’07
Rosebank -Illovo -
Sandton
MTN Commercial PilotSept’07
Rosebank -Illovo -
Sandton
• Costly• Lack of supply of
backhaul bandwidth• Roll-out takes long
• Bold investment• Primarily for own use• Secondary to bolster customer capacity• Choice to customers • Quicker Roll-out• Unlimited bandwidth
![Page 3: MTN’s Fibre Optic Networkmtn-investor.com › ... › MTN_SA_Fibre_optic_network... · Metro Fibre The Future • Initially it will be a turf war • Who has fibre and who connects](https://reader030.vdocument.in/reader030/viewer/2022041103/5f0337b07e708231d4081e3e/html5/thumbnails/3.jpg)
Future Plans
• MTN has done extensive research
• Pervasive self provisioning business case is compelling
• Will be going to tender for approximately 5000 km national roll-out
– Intend to assess options on a link by link basis –• Joint Ventures• Partnerships etc.
• Final decision to be made end 2007– Bulk of implementation 2008– Finalisation 2009
““Once rollOnce roll--out has commenced out has commenced we will go as fast as possible to complete itwe will go as fast as possible to complete it””
![Page 4: MTN’s Fibre Optic Networkmtn-investor.com › ... › MTN_SA_Fibre_optic_network... · Metro Fibre The Future • Initially it will be a turf war • Who has fibre and who connects](https://reader030.vdocument.in/reader030/viewer/2022041103/5f0337b07e708231d4081e3e/html5/thumbnails/4.jpg)
Planned National FibreOptic Backbone Design
![Page 5: MTN’s Fibre Optic Networkmtn-investor.com › ... › MTN_SA_Fibre_optic_network... · Metro Fibre The Future • Initially it will be a turf war • Who has fibre and who connects](https://reader030.vdocument.in/reader030/viewer/2022041103/5f0337b07e708231d4081e3e/html5/thumbnails/5.jpg)
MTN Fibre Access
![Page 6: MTN’s Fibre Optic Networkmtn-investor.com › ... › MTN_SA_Fibre_optic_network... · Metro Fibre The Future • Initially it will be a turf war • Who has fibre and who connects](https://reader030.vdocument.in/reader030/viewer/2022041103/5f0337b07e708231d4081e3e/html5/thumbnails/6.jpg)
It is all about SPEED!
![Page 7: MTN’s Fibre Optic Networkmtn-investor.com › ... › MTN_SA_Fibre_optic_network... · Metro Fibre The Future • Initially it will be a turf war • Who has fibre and who connects](https://reader030.vdocument.in/reader030/viewer/2022041103/5f0337b07e708231d4081e3e/html5/thumbnails/7.jpg)
Metro FibreA Competitive Market
• Incumbents– Neotel / Transtel– Telkom
• Mobile Operators– MTN– Vodacom
• Municipalities– Shared sleeves or– resale of managed services
• Others– Shared sleeves
![Page 8: MTN’s Fibre Optic Networkmtn-investor.com › ... › MTN_SA_Fibre_optic_network... · Metro Fibre The Future • Initially it will be a turf war • Who has fibre and who connects](https://reader030.vdocument.in/reader030/viewer/2022041103/5f0337b07e708231d4081e3e/html5/thumbnails/8.jpg)
Metro FibreThe Future
• Initially it will be a turf war• Who has fibre and who connects to the client first
• Soon fibre will be readily available in all key business districts in all major cities
• Even national long distance fibre will become commoditised
• Prices will fall as usageincreases
![Page 9: MTN’s Fibre Optic Networkmtn-investor.com › ... › MTN_SA_Fibre_optic_network... · Metro Fibre The Future • Initially it will be a turf war • Who has fibre and who connects](https://reader030.vdocument.in/reader030/viewer/2022041103/5f0337b07e708231d4081e3e/html5/thumbnails/9.jpg)
MTN Business Positioning
• Technically a market leader– Better SLA
– Better management
– Better implementation of services
• Setting a new bench mark on price
• Ability to offer an end-to-end SLA
• Speed to deploy and scale
• Real alternative to Telkom Diginet and ATM
• Real low cost bandwidth
![Page 10: MTN’s Fibre Optic Networkmtn-investor.com › ... › MTN_SA_Fibre_optic_network... · Metro Fibre The Future • Initially it will be a turf war • Who has fibre and who connects](https://reader030.vdocument.in/reader030/viewer/2022041103/5f0337b07e708231d4081e3e/html5/thumbnails/10.jpg)
High Level Route
Planned
Phase 5
Planned
Phase 6
Phase 1
Phase 4
Phase 2
Phase 3
![Page 11: MTN’s Fibre Optic Networkmtn-investor.com › ... › MTN_SA_Fibre_optic_network... · Metro Fibre The Future • Initially it will be a turf war • Who has fibre and who connects](https://reader030.vdocument.in/reader030/viewer/2022041103/5f0337b07e708231d4081e3e/html5/thumbnails/11.jpg)
Sandton CBD (Phase 1)
![Page 12: MTN’s Fibre Optic Networkmtn-investor.com › ... › MTN_SA_Fibre_optic_network... · Metro Fibre The Future • Initially it will be a turf war • Who has fibre and who connects](https://reader030.vdocument.in/reader030/viewer/2022041103/5f0337b07e708231d4081e3e/html5/thumbnails/12.jpg)
Fricker Road CBD (Phase 2)
![Page 13: MTN’s Fibre Optic Networkmtn-investor.com › ... › MTN_SA_Fibre_optic_network... · Metro Fibre The Future • Initially it will be a turf war • Who has fibre and who connects](https://reader030.vdocument.in/reader030/viewer/2022041103/5f0337b07e708231d4081e3e/html5/thumbnails/13.jpg)
Rosebank CBD (Phase 3)
![Page 14: MTN’s Fibre Optic Networkmtn-investor.com › ... › MTN_SA_Fibre_optic_network... · Metro Fibre The Future • Initially it will be a turf war • Who has fibre and who connects](https://reader030.vdocument.in/reader030/viewer/2022041103/5f0337b07e708231d4081e3e/html5/thumbnails/14.jpg)
Initial Products
• Initial launch of 3 products
– Ethernet MPLS (EMS) service
– Ethernet private line (EPL) service
– Multi-tenant connect service
• All initially a single connect product– Dual connect will be available where feasible
![Page 15: MTN’s Fibre Optic Networkmtn-investor.com › ... › MTN_SA_Fibre_optic_network... · Metro Fibre The Future • Initially it will be a turf war • Who has fibre and who connects](https://reader030.vdocument.in/reader030/viewer/2022041103/5f0337b07e708231d4081e3e/html5/thumbnails/15.jpg)
Future developments
• Ethernet e-LAN
• Dual connect
• Full redundant connect
• Multi-tenant connect service - DSLAM
![Page 16: MTN’s Fibre Optic Networkmtn-investor.com › ... › MTN_SA_Fibre_optic_network... · Metro Fibre The Future • Initially it will be a turf war • Who has fibre and who connects](https://reader030.vdocument.in/reader030/viewer/2022041103/5f0337b07e708231d4081e3e/html5/thumbnails/16.jpg)
Benefits
• Full Fixed Line alternative to Telkom Diginet or ATM• Diverse routing• Greater reliability• Real SLA on the service • On MTN services an end-to-end SLA• Low cost per Mbps• Speed to deploy (6 – 12 weeks)• Services are easy to scale• Multiple increments between 2Mbps – 1Gbps• Run multiple VLANs• Competitive Pricing• Highly Skilled Engineers• Choice!