![Page 1: NASA Technology Infusion Road Tour Clark Atlanta University · 2018. 4. 26. · SGT Overview SGT PRIMARY PROGRAMS Core Competencies: Performing work: (Highly recognized for Engineering](https://reader034.vdocument.in/reader034/viewer/2022051922/600fcb68d6c8320f6e532b47/html5/thumbnails/1.jpg)
Prime Opportunity BriefingChemise Smith
Small Business Liaison Officer
March 27, 2018
NASA Technology Infusion Road TourClark Atlanta University
![Page 2: NASA Technology Infusion Road Tour Clark Atlanta University · 2018. 4. 26. · SGT Overview SGT PRIMARY PROGRAMS Core Competencies: Performing work: (Highly recognized for Engineering](https://reader034.vdocument.in/reader034/viewer/2022051922/600fcb68d6c8320f6e532b47/html5/thumbnails/2.jpg)
SGT Overview
SGT PRIMARY PROGRAMSCore Competencies: Performing work: (Highly recognized for Engineering Services)Ø Engineering: Spacecraft, Systems and Instruments, Software Engineering,
Systems Engineering and Integration Ø Scientific Analysis: Orbital and Global Climate Change AnalysisØ Mission Operations: Human Spacecraft and Weather OperationsØ Information technology: Cyber Security, Enterprise Computing
Supports (6) NASA Centers:
Ames, Glenn, Goddard, Johnson , Kennedy, and Langley
Additional Federal Clients: Dept. of Transportation/FAA, Dept. of Interior, Dept. of Defense, GSA, and National Oceanic and Atmospheric Admin (NOAA)
Page 2
![Page 3: NASA Technology Infusion Road Tour Clark Atlanta University · 2018. 4. 26. · SGT Overview SGT PRIMARY PROGRAMS Core Competencies: Performing work: (Highly recognized for Engineering](https://reader034.vdocument.in/reader034/viewer/2022051922/600fcb68d6c8320f6e532b47/html5/thumbnails/3.jpg)
SGT Requirements
Page 3
WHAT DOES SGT PURCHASE?qSpace Flight Hardware and SoftwareqMechanical HardwareqIT Software Maintenance and HardwareqEngineering Services qInformation Technology Services
UPCOMING PROCUREMENTSSGT releases procurements on an on-going basis. Solicitation periods are short in duration and require Suppliers to be extremely responsive as our customer’s needs are constantly changing.
![Page 4: NASA Technology Infusion Road Tour Clark Atlanta University · 2018. 4. 26. · SGT Overview SGT PRIMARY PROGRAMS Core Competencies: Performing work: (Highly recognized for Engineering](https://reader034.vdocument.in/reader034/viewer/2022051922/600fcb68d6c8320f6e532b47/html5/thumbnails/4.jpg)
Partnering with a Prime Contractor
Initial Preparation: Ø Establish your strategy and direction. (i.e., Identify
core technology strengths, types of opportunities seeking)
Ø Capability Statement – Provide core technical skills Ø Research and identify Prime Contractors – TO
determine if there’s value-add to Prime’s Federal programs
Ø Contact LB Prime SB Office for an introduction to Business Development team
Page 4
![Page 5: NASA Technology Infusion Road Tour Clark Atlanta University · 2018. 4. 26. · SGT Overview SGT PRIMARY PROGRAMS Core Competencies: Performing work: (Highly recognized for Engineering](https://reader034.vdocument.in/reader034/viewer/2022051922/600fcb68d6c8320f6e532b47/html5/thumbnails/5.jpg)
Partnering with SGT
Criteria for Consideration: ØRelevant work and successful past
performance ØNiche capabilities specific to SGT programs,
and our customer’s requirements. ØUnderstanding customer’s the mission ØQuality assurance industry certifications
such as ISO, AS9100, CMMI
Page 5
![Page 6: NASA Technology Infusion Road Tour Clark Atlanta University · 2018. 4. 26. · SGT Overview SGT PRIMARY PROGRAMS Core Competencies: Performing work: (Highly recognized for Engineering](https://reader034.vdocument.in/reader034/viewer/2022051922/600fcb68d6c8320f6e532b47/html5/thumbnails/6.jpg)
Key to successful partnerships
Ø Be familiar with the RFP process, proposal delivery requirements and expectations. Pre planning takes place early before the RFP is released (i.e. Teaming arrangements are developed)
Ø Get to know the Prime’s Program Team - Discuss the expectations of RFP (i.e., Scope of Work (SOW), contract commitments, and delivery)
Ø Responsive to the Prime during the development of the proposals, as information/data maybe required.
Ø Prepare for potential long proposal cycle. Ø As a subcontractor, be familiar with the contract requirements,
and identify where you can participate.
Page 6
![Page 7: NASA Technology Infusion Road Tour Clark Atlanta University · 2018. 4. 26. · SGT Overview SGT PRIMARY PROGRAMS Core Competencies: Performing work: (Highly recognized for Engineering](https://reader034.vdocument.in/reader034/viewer/2022051922/600fcb68d6c8320f6e532b47/html5/thumbnails/7.jpg)
Final Thoughts
Recommendations:q Ensure Capability Briefing highlights HBCU/MSI’s relevant
technology expertise, process of how to do business with your University, and designated POC.
q Stay engaged with the Proposal Team during the proposals process, as information/data may be required.
q As a subcontractor, be familiar with the Program Team and proactive in identifying subcontracting opportunities.
q Be responsive to timelines and schedules to meet contract delivery requirements.
Page 7
![Page 8: NASA Technology Infusion Road Tour Clark Atlanta University · 2018. 4. 26. · SGT Overview SGT PRIMARY PROGRAMS Core Competencies: Performing work: (Highly recognized for Engineering](https://reader034.vdocument.in/reader034/viewer/2022051922/600fcb68d6c8320f6e532b47/html5/thumbnails/8.jpg)
SGT Small Business Office
Chemise Smith Small Business Liaison Officer
7701 Greenbelt RoadGreenbelt, MD 20770
[email protected] www.sgt-inc.com
Thank you!!
Page 8