Page 1: Neutrino Factory Target Vessel Concept

Neutrino Factory Target Vessel Concept

V. Graves

Target Studies EVOMay 1, 2012

Page 2: Neutrino Factory Target Vessel Concept

2 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

Review – Two Target Vessel Ideas• Solid billet does not provide adequate shielding

• Continue with shell concept and refine it for IPAC paper

Hollow SS Shell with Tungsten Beads

Machined SS Billet with Cooling Channels

Page 3: Neutrino Factory Target Vessel Concept

3 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

Page 4: Neutrino Factory Target Vessel Concept

4 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

Page 5: Neutrino Factory Target Vessel Concept

5 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

Page 6: Neutrino Factory Target Vessel Concept

6 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

Page 7: Neutrino Factory Target Vessel Concept

7 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

Page 8: Neutrino Factory Target Vessel Concept

8 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

Secondary Helium outlet

Primary Helium inlet Primary

Helium outlet

Secondary Helium

inlet

Hg return

Beam pipe

Hg drain

Hg jet inlet

Hg chambervent line

Maintenance Handle

Page 9: Neutrino Factory Target Vessel Concept

9 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

Helium outlet

Helium inlet

Hg return

Beam pipe

Hg drain

Hg jet inlet

Hg chambervent line

Page 10: Neutrino Factory Target Vessel Concept

10 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

Page 11: Neutrino Factory Target Vessel Concept

11 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

Page 12: Neutrino Factory Target Vessel Concept

12 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

Page 13: Neutrino Factory Target Vessel Concept

13 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

Page 14: Neutrino Factory Target Vessel Concept

14 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

Page 15: Neutrino Factory Target Vessel Concept

15 Managed by UT-Battellefor the U.S. Department of Energy Target Vessel Concept 1 May 2012

Comments

• Concept assumes helium cooling – water cooling will add significant complexity because of draining issues• Locating and positioning guides not included yet• Handling will be extremely complicated