PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE11
Nevada Copper Corp.
Nevada Copper Corp.
Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine -
April, 2008TSX: NCU
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE22
Certain statements contained in this presentation constitute forward-looking statements. Such forward-looking statements involve a number of known and unknown risks, uncertainties and other factors which may cause the actual results, performance of achievements of the Corporation to be materially different from actual future results and achievements expressed or implied by such forward-looking statements. Investors are cautioned not to place undue reliance on these forward-looking statements.
This presentation describes “Measured”, “Indicated” and/or “Inferred” Resources. U.S. investors are advised that while such terms are recognized and required by Canadian regulations, the Securities and Exchange Commission does not recognize them. “Inferred Resources” have a great amount of uncertainty as to their existence and great uncertainty as to their economic feasibility. It cannot be assumed that all or any part of any inferred resource will ever be upgraded to a higher category. Exploration is an inherently risky proposition and investors are advised that most exploration projects fail to identify economic resources.
The Corporation has at present not confirmed the economic viability of any resources at the project. The company plans drilling programs and studies with the objective of confirmation of Copper and Iron deposits and ultimately completing a feasibility study to demonstrate the economics of the resources. Any historical estimates are not mineral reserves and do not have demonstrated economic viability and should not be relied upon.
Cautionary Note
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE33
Corporate Highlights
Stock Symbol:…..............................TSX: NCU
Shares Outstanding:.……..….........37.0 Million
Fully Diluted:………………………...45.8 Million**Options - 3.6 million @ $1.25 / Warrants – 5.2 million @ $1.80
Cash, March 15, 2008:….…..……...C$ 3.0 Million
Cash on exercise:.……………........C$13.8 Million
Market Cap/Cu Resource lb:……...C$0.011
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE44
Investment Highlights
100% Owned Pumpkin Hollow, Located in Nevada.
NI 43-101 Compliant Resource (Nov.’07): 7.9 Billion Pounds of Copper, 1.3 Million ounces of Gold, 57 million ounces of Silver and 144 million tons of Iron. ► Open Mineralization in Several Directions.
Significant Potential to Expand Resource.
Discovery Potential on Increased Land Position
Premier Permitting Site with Excellent Infrastructure.
Positive Preliminary Economic Assessment - March 2008.
Advanced Stage - Commence Feasibility Study in 2008.
Creation of a Mid-Tier, Well Managed Copper Company.
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE55
Nevada Copper Team
Giulio T. Bonifacio - President, CEO & Director
Joe Kircher - Vice President, COO & Director
Joe Chan - Vice President, CFO
Greg French - Project Manager
World Class Technical Team: Tetra Tech – Resource Estimate, Open Pit & Preliminary Assessment
The Mines Group – Permitting & Environmental
Golder Associates – Geotechnical
Water Management – Hydrology
RDI – Metallurgy and Processing
Hazen Research – Metallurgical
Dynatec – Underground Mining
Harma Associates – Iron Processing and Marketing
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE66
Location Map
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE77
Land PositionYerington
Pumpkin Hollow Property – 21 sq. Miles
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE88
1.9 Billion pounds of copper produced at 0.54% Cu grade; Anaconda Copper Mine - 1953 to 1978.
12 Billion pounds of copper found in other porphyry deposits in the district.
7.9 Billion pounds of copper at Pumpkin Hollow; a high grade large skarn associated with the cluster of porphyry deposits.
NCU holds a commanding land position in an exciting Copper District that hosts in excess of
20 Billion pounds of Copper.
District Summary
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE9
Yerrington
Tertiary volcanics
Cretaceous quartz monzonite
Jurassic Yerrington Batholith
Triassic-Jurassic Sedimentary& metavolcanic rocks
95
95
N
2000 meters
4000 feet
District Geology
MasonDistrict
Ann Mason Deposit810 Mt @???
(7.1 billion lbs. Cu)
Ludwig District
Produced ~700,000
tons3-5% Cu
McArthur Deposit29 Mt @0.2% Cu
(162 million lbs. Cu
Yerington PitProduced 165 Mt
@0.54% Cu(1.9 billion lbs. Cu)
Bear Deposit500 Mt @0.4% Cu
(4.4 billion lbs. Cu)
Blue Jay Mine
Pumpkin Copper780 Mt @0.50% Cu(7.9) Billion lbs. Cu
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE10
Project History - 1960 to 2001
Discovered 1960 by US Steel
Corporation.
Next 30 Years - Anaconda,
Cyprus, Conoco, delineates
large copper and iron resource.
590,000 feet (180,000 meters) of
drilling, metallurgy, mining,
economic studies completed.
US$50 Million in estimated
historical expenditures.
10
1970’s Drill Rigs
Core Sheds
Core Sheds
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE1111
Core Processing Facility
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE12
Nevada Copper History
Acquired Project in 2005, Copper Price $1.40 per lb.
Aug.’2006 Resource Estimate - 6.1 Billion Pounds of Copper.
Nevada Copper goes public on TSX Venture - August 2006.
Nevada Copper lists on Toronto Stock Exchange - August 2007.
2007 - Infill & Step-Out Drilling: (62,000 feet/19,000 Meters).
Baseline Data Collection for Feasibility & Permitting Started in Q1 2007.
Nov.’2007 Updated Resource - 7.9 Billion Pounds of Copper.
Mar.’2008 – Positive Preliminary Assessment/Scoping.
12
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE1313
The Copper Deposits
High Grade Underground
Copper Deposits
NORTH ZONE
SOUTH ZONE
EAST ZONE
SOUTHEAST
ZONE
2,000ft 3,000ft0ft
Outline of Patented Claims
(Note: Property extends off the map in all directions)
Copper - Iron Open Pit Deposits
JK-34 ZONE
E-2 ZONE
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE1414
Increased drill program from 12,000 Meters to 19,000 Meters based on extremely successful in-fill and step out program.
East Deposit - Converted Inferred to Measured & Indicated, increased grade and added metal.
E2 - Converted Inferred to Measured & Indicated, increased
grade.
North Deposit - Converted Inferred to Measured & Indicated, converted waste to ore, added strike and metal.
South Deposit - Confirmed shallow high grade Cu/Au deposit.
2007 Drilling Highlights
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE1515
2007 Measured Indicated & Inferred
Copper Cutoff Tons (000) Cu (%) Cu (lbs/000)
0.20 % 780,899 0.50 7,874,513
0.30 % 458,547 0.69 6,324,491
0.75 % 115,668 1.37 3,168,487
2006 vs. 2007 Cu ResourceNI 43-101 Compliant Estimate
2006 Measured Indicated & Inferred
Copper Cutoff Tons (000) Cu (%) Cu(lbs/000)
0.20 % 766,084 0.40 6,147,300
0.30 % 415,989 0.53 4,437,093
0.75 % 42,056 1.43 1,198,833
HIGHLIGHTS:
32% Increase in Copper Grade
44% Increase in Measured and Indicated Copper Resource
28% Overall Increase in Contained Copper
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE1616
2007Category Tons (000) Cu (%) Cu(lbs/000) Gold (Oz.) Silver (Oz.)
Meas. & Ind. 342,735 0.58 3,967,688 635,000 26,643,000
Inferred 438,164 0.45 3,906,825 647,000 30,680,000
2007 Resource DetailNI 43-101 Compliant Estimate (0.2% Copper Cutoff)
Prepared in Nov.’07 by Tetra Tech MM Inc., an Industry Leading International Engineering Firm.
HIGHLIGHTS:
7.9 Billion Pounds of Contained Copper
Added 1.3 Million Oz. of Gold and 57 million Oz. of Silver
92% Increase in Iron to 144 Million Tons
2006Category Tons (000) Cu (%) Cu(lbs/000)
Meas. & Ind. 312,063 0.44 2,751,700
Inferred 454,021 0.37 3,395,600
6.1 Billion Pounds of Contained Copper plus 75 million tons of Iron Magnetite.
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE1717
2006 vs. 2007 : At 0.75% cutoff M&I increased 303% to 1.2 billion pounds from 301 million pounds. In all categories increased 168% to 1.85 billion pounds from 690 million pounds.
East and E2 UndergroundNI 43-101 Compliant Estimate
2007 Measured & Indicated
Cu Cutoff Tons (000) Cu (%) Cu (lbs/000) Au Oz Ag Oz
0.75 % 41,592 1.46 1,214,000 167,000 5,106,000
1.00 % 26,108 1.81 947,000 128,000 3,562,000
1.40 % 13,555 2.41 653,000 83,000 2,125,000
2007 Inferred
Cu Cutoff Tons (000) Cu (%) Cu(lbs/000) Au Oz Ag Oz
0.75 % 25,333 1.25 634,000 90,000 2,926,000
1.00 % 13,671 1.59 434,000 59,000 1,765,000
1.40 % 5,354 2.25 240,933 31,000 814,000
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE1818
North & South Open PitNI 43-101 Compliant Estimate
2007 Measured & Indicated
Cu Cutoff Tons (000) Cu (%) Cu (lbs/000) Au Oz Ag Oz
0.20 % 161,964 0.51 1,666,216 278,000 12,211,000
0.30 % 104,228 0.68 1,430,626 224,000 8,953,000
0.40 % 75,357 0.82 1,231,800 186,000 7,065,000
2007 Inferred
Cu Cutoff Tons (000) Cu (%) Cu(lbs/000) Au Oz Ag Oz
0.20 % 230,838 0.44 2,022,429 336,000 16,148,000
0.30% 116,338 0.63 1,460,355 230,000 11,892,000
0.40% 73,333 0.80 1,170,554 180,000 6,812,000
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE19
2007
Measured & IndicatedIron Cutoff Tons (000) Iron (%) Tons (000) Cu %
10 % 191,008 27.8 53,154 0.28
20 % 119,755 35.9 42,956 0.31
30 % 76,235 42.2 32,152 0.31
Inferred ResourcesIron Cutoff Tons (000) Iron (%) Tons (000) Cu %
10 % 465,337 19.6 91,363 0.23
20 % 135,144 34.1 46,097 0.37
30 % 74,474 42.1 31,349 0.44
Iron resources amenable to open-pit mining methods in the North and South Deposits. Metallurgical test-work has demonstrated amenability of generating marketable pellet feed.
1996: $ 28 per metric ton iron pellet feed.
2007: > $ 100 per metric ton iron pellet feed.
19
2007 Iron ResourceNI 43-101 Compliant Estimate
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE2020
Resource - 3D
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE2121
N
1500 FEET
48,000 N
56,000 N
50,0
00 E
58,0
00 E
54,0
00 E
52,000 N
Open Targets/ Step-out
JK-34
E-2 Deposit
Open Mineral
Directions
East Deposit
KM-12
E91-1
North Deposit
North down Dip
Southeast Deposit
West East Extensions
NortheastShallow
South Deposit
South Up-dip
Northborder
Southwest extension
Sec 11
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE2222
N
1500 FEET
48,000 N
56,000 N
50,0
00 E
58,0
00 E
54,0
00 E
52,000 N
Exploration Targets
E-2 -Section 11
JK-34
E-2 Deposit
Open Mineral
Trends & Anomalies
East Deposit
FG-20
North Deposit
Southeast Deposit
NorthwestMagneticAnomaly
South Deposit
Between North & South
East Ground Magnetic
Sec 11
SoutheastStrike & dip
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE23
STARTED IN JANUARY
2008 DRILL PROGRAM
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE2424
Premier Development Site
Pumpkin Hollow Site
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE2525
Yerington - Full Services
Ideal Development Site
R&
R 1
0 M
iles
Mining Friendly Nevada
98% of the Resource on Private Ground
Paved Road
Power line
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE2626
Site Layout - Conceptual
Concentrator
Overburden Repository
Dewatered Tailings
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE27
Mine Profile
Integrated open pit and underground
operation.
Throughput, 60,000/tpd, 88% open pit,
12% underground.
Single copper concentrator,
conventional floatation circuit.
Producing an Average of 95,000 tons
of copper per year.
Gold, silver and iron by- products
Mine life 20-30 years.
27
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE2828
Operating Characteristics
* Includes dewatering cost
Open Pit 52,500 tons per day
Truck and Shovel Mining
Avg. 2.9:1 waste/ore Ratio
432,000,000 tons Ore
Cu equiv. Grade 0.62%
$0.99/ton Mining Cost*
$4.96/ton Milling Cost
24 Year Mine Life
7,500 tons per day
Bulk Long-hole Mining
Shaft Access
28,000,000 tons Ore
Cu equiv. Grade 1.82%
$17/ton Mining Cost*
$4.96/ton Milling Cost
14 Year Mine Life
Underground
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE29
Open Pit Excavations
South Deposit
North Deposit
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE3030
Underground – East & E-2
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE3131
Preliminary Economics Financial highlights:
(In Millions of US Dollars and Imperial Units)
CU Price ($/lb)
Base Case Alternative Case
Variable @
$1.75 $2.50 $3.00
Variable @ $1.75 $2.50 $3.00
NPV @ 4 % $ 1,381 $ 2,143 $ 3,396 $ 863 $ 1,623 $ 2,876
NPV @ 8 % $ 765 $ 1,086 $ 1,918 $ 531 $ 851 $ 1,684
IRR (Incl. contingency) 23.8% 20.5% 29.3% 22.9% 19.7% 29.0%Capital (Incl. contingency & working capital) $ 780 $ 780 $ 780 $ 780 $ 780 $ 780
Payback (years) 3.1 4.8 3.6 3.1 4.8 3.6
(1) Recoveries: 89% Cu; 70% Au; 68% Ag; 81% Fe(2) Base Case: Operating Cost of $1.02/lb, net of by-product credits(3) Alternative Case – No Iron: Operating Cost of $ 1.29/lb, net of by-product credits
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE32
7,500 ton per day mine.
Capital: $270 Million / Incl. Working Capital & Contingency
14 Year Mine Life / Payback 4.5 Years
19% IRR & $220 Million NPV @8% / $415 Million NPV @ $3.00 Cu.
Significant upside in Grade and tonnage to be tested in 2008.
Underground Only
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE33
Shallow Open Pit Deposit Extensions in the North, South and
Southeast.
Deposit Extensions in the high grade East and E2 extending mine
life and improving Year 1-5 grade.
Iron Deposit Expansion and Detailed Evaluation.
Grade Increase’s in all Deposits with additional Infill and Step-out
Drilling.
Gold, Silver and Moly Additions from Re-Assay Program.
Green Fields “DISCOVERY” Potential Is Huge.
Value Drivers/ Upside
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE3434
2008 2009 2010 2011 2012
Description1st Q 2nd Q 3rd Q 4th Q 1st Q 2nd Q 3rd Q 4th Q
In-Fill, Step Out and Exploration Drilling
Re-Assay Program
Updated Resource & Feasibility
Permitting
Exploration Pre-Development
Surface Construction
Production
Preliminary Project Timeline
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE3535
2008 Results Oriented Aggressive Drilling Program - In-Fill, Step
Out & Exploration.
Assay Program - Continue Historic Drill Hole assaying program for copper, gold, silver & Moly (Completed 5,300 Meters/
85 Drill Holes).
Steady News Flow - 2008 Drilling Results/ Other.
Commence Bankable Feasibility Study in 2008.
Updated Resource - Late 2008.
Market Catalysts
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE3636
Peer Group ComparablesMarket Value per pound of Copper in situ (Cents per lb)
* Feasibility / ** Acquired / *** Scoping/PEA
Market Comparables @ March 28, 2008
Peer Group Average: 3.8 cents per pound Copper
Industry Average: Plus 5 cents per pound Copper
3.43.93.9
4.5
Peru Copper**Northern Peru **Augusta Resources* Norsemont ***
3.3
1.1Nevada Copper ***
Chariot *
3.8 Average0
1
2
3
4
5
Norsemont Augusta NorthernPeru
PeruCopper
Chariot NevadaCopper
4.53.9 3.9
3.33.4
1.1
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE3737
The following pages present cross sections,photos and 3 D Models of the:
East, E-2 and North Deposits.
Deposit Geology Section
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE3838
Underground Deposits
High Grade Underground
Copper Deposits
NORTH ZONE
SOUTH ZONE
EAST ZONE
SOUTHEAST ZONE
2,000ft 3,000ft0ft
Outline of Patented Claims (Note: Property extends off the map in all directions)
Copper - Iron Open Pit Deposits
JK-34 ZONE
E-2 ZONE
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE3939
East Deposit E-2 Deposit
East Deposit View
South Deposit
Looking East
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE4040
East & E2 Resource – 3D
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE4141
400 FEET
N
NC07-21OPEN
NC07-5
NC07-8
NC07-2
NC07-14
54600N
54200N
53400N
East Deposit – Plan View
Nevada Copperdrill holes
Historic drill holes
OPEN
EAST DEPOSIT
OPEN
Patented property outline only
Nov.’07 43-101 Resource: 50.8 Million tons @
1.38% Copper
@ 0.75% copper cutoff
0ft 2000ft
EAST
DEPOSIT
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE4242
East Section - 54600N
SECTION 49600N
SECTION 54600N
EAST
5800 feet
3500
fee
t
EAST
E2
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE43
0ft 2000ft
43
4800’
3600’
3000’
2400’
NC07-5 NC07-21
HJ-11
39’2.59% Cu
6’2.38% Cu
6’2.89% Cu
J-11
5’2.58% Cu
9’4.74% Cu
40.5’4.08% Cu
57’2.33% Cu
19’2.37% Cu
10.5’5.0% Cu
20’2.10% Cu
2’2.03% Cu
15’2.24% Cu5’
2.03% Cu
87’2.76% Cu
56’4.34% Cu
3.5’2.3% Cu
57.5’3.34% Cu
JK-12
KM-12
Section shortened forvisual efficiency
19’2.37% Cu
Mes
ozo
ic
ConglomerateTertiary volcanicsLimestone, MarbleHornfelsMagnetite skarnCal-silicate skarnIntrusive+ 1% Cu+ 2% Cu
Trace of drill holeIntersected length of Mineralization in feet, %Cu
8’4.59% Cu
400 FEET
4600’3800’
Note: Assays <1% not plotted
Patented Property Outline only NC07 – 540.5 feet @ 4.08% Cu10.5 feet @ 5.00% Cu57.5 feet @ 3.34% Cu
NC07 – 2120 feet @ 2.10% Cu87 feet @ 2.76% Cu56 feet @ 4.34% Cu
East Section - 54600N
EAST
DEPOSIT
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE4444
East Section – 53400N
SECTION 49600NSECTION 53400N
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE4545
19’2.37% Cu
Mes
ozo
ic
ConglomerateTertiary volcanicsLimestone, MarbleHornfelsMagnetite skarnCal-silicate skarnIntrusive+ 1% Cu+ 2% Cu
Trace of drill holeIntersected length of Mineralization in feet, %Cu
Note: Assays <1% not plotted
East Section - 53400N
400 FEET 1800’
2400’
3000’
3600’
4000’4600’
4800’
57800E55400E
NC07-14
111’3.31% Cu
116.2’3.08% Cu
28’3.89% Cu
36’5.04% Cu
44’2.75% Cu
JK-19KM-20
M-20
C-12C-6
C-8
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE4646
E-2 Section – 49600N
SECTION 49600NE2
5800 feet
3500
fee
t
EastE2
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE4747
E-2 Section - 49600N
400 FEET1800’
3800’4600’
4800’
58000E
NC07-23
63’2.29% Cu
145’2.44% Cu
115’4.45% Cu
135’2.66% Cu
C-11
3200’
2000’
2600’
56000E
C-13
KM-45
KM-44
M-44
19’2.37% Cu Trace of drill hole
Intersected length of Mineralization in feet, %Cu
Note: Assays <1% not plotted
Mes
ozo
ic
Tertiary volcanicsLimestone, MarbleHornfelsMagnetite skarnCal-silicate skarnIntrusive+ 1% Cu+ 2% Cu
>0.3% Cu
E-2
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE4848
Open Pit Deposits
High Grade Underground
Copper Deposits
NORTH ZONE
SOUTH ZONE
EAST ZONE
SOUTHEAST ZONE
2,000ft 3,000ft0ft
Outline of Patented Claims (Note: Property extends off the map in all directions)
Copper - Iron Open Pit Deposits
JK-34 ZONE
E-2 ZONE
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE4949
North Deposit View
Looking North
North Deposit
Office
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE5050
North Deposit – 3D
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE5151
North Section – 47700E
SECTION 47700E
North
4500 feet
2000 fe
et
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE5252
19’2.37% Cu Trace of drill hole
Intersected length of Mineralization in feet, %Cu
Note: Assays <1% not plotted
Mes
ozo
ic
Tertiary volcanicsLimestone, MarbleHornfelsMagnetite skarnCal-silicate skarnIntrusive+ 1% Cu+ 2% Cu
>0.3% Cu
North Section - 47700E
400 FEET
4800’
52500N
4000’
2800’
3400’
53000N53500N54000N54500N
NC07-9USS-7999-799-6
USS-70
USS-76
USS-41
99-4
99-2
USS-95
USS-46
99-3
42’2.49% Cu
115.5’2.51% Cu
109.9’3.22% Cu
24.9’3.38% Cu 12.5’
2.53% Cu
North
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE5353
19’2.37% Cu Trace of drill hole
Intersected length of Mineralization in feet, %Cu
Note: Assays <1% not plotted
Mes
ozo
ic
ConglomerateTertiary volcanicsLimestone, MarbleHornfelsMagnetite skarnCal-silicate skarnIntrusive+ 1% Cu+ 2% Cu
North Section - 47900E
400 FEET
4800’
53000N
4000’
2800’
3400’
53500N54000N54500N54500N
NC07-1USS-56 USS-96 USS-34
USS-43
USS-46
USS-88
99-1
USS-70
USS-88
USS-48
USS-76
52500N
342’@ 2.03%
North
PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE5454
Nevada Copper Corp.
Nevada Copper Corp.
Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine -
January, 2008TSX: NCU