Download - NTPC - Finished
-
8/3/2019 NTPC - Finished
1/42
-
8/3/2019 NTPC - Finished
2/42
NTPCNATIONAL THERMAL
POWER CORPORATION
PRESENTED BY:
P. SATHISH KUMARC. SELVAGANESAN
-
8/3/2019 NTPC - Finished
3/42
PROFILE
-
8/3/2019 NTPC - Finished
4/42
Type : State-owned enterprise Public
Industry : Engineer production
Founded : 1975
Headquarters :Delhi, India
Key people : Arup Roy Choudhury
(Chairman & MD)
Products :Electricity
-
8/3/2019 NTPC - Finished
5/42
NTPC, India's largest power company, was set upin 1975 to accelerate power development in India.
With a current generating capacity of 34,854
MW, NTPC has embarked on plans to become a75,000 MW company by 2017.
The company has set a target to have an installedpower generating capacity of 1,28,000 MW by theyear 2032.
-
8/3/2019 NTPC - Finished
6/42
-
8/3/2019 NTPC - Finished
7/42
Vision And Mission
Vision :To be the worlds largest and best power
producer, powering Indias growth.
Mission:Develop and provide reliable power, related
products and services at competitive prices,integrating multiple energy sources withinnovative and eco-friendly technologies andcontribute to society.
-
8/3/2019 NTPC - Finished
8/42
About NTPC
The total installed capacity of the company is 34,854MW (including JVs) with 15 coal based and 7 gasbased stations, located across the country.
In addition under JVs, 5 stations are coal based &another station uses naptha /LNG as fuel.
The capacity will have a diversified fuel mix
comprising 56% coal, 16% Gas, 11% Nuclear and17% Renewable Energy Sources (RES) includinghydro.
-
8/3/2019 NTPC - Finished
9/42
Continue
Although the company has 17.75% of the total nationalcapacity, it contributes 27.40% of total powergeneration due to its focus on high efficiency.
NTPC thus became a listed company in November2004 with the Government holding 89.5% of the equityshare capital.
In February 2010, the Shareholding of Government ofIndia was reduced from 89.5% to 84.5% throughFurther Public Offer.
-
8/3/2019 NTPC - Finished
10/42
Board of Directors
-
8/3/2019 NTPC - Finished
11/42
Chairman
Shri Arup Roy Choudhury,(Chairman & Managing Director)
-
8/3/2019 NTPC - Finished
12/42
Shri A.K. Singhal - Director (Finance)
Shri. I.J.Kapoor - Director (Commercial)
Shri B.P. Singh - Director (Projects)
Shri D.K. Jain - Director (Technical)
Shri S. P. Singh - Director (HR)
Shri N.N.Misra - Director (Operations)
-
8/3/2019 NTPC - Finished
13/42
RECRUITMENT
The company recruits every year through a highlycompetitive ET test. Every year about 1.5 Lacsstudents take the exam and 500600 candidates areselected after an interview.
The Stream wise distribution is as follows:
Mechanical Engineers 40%
Electrical engineers 25% Instrumentation Engineers 10%
Civil Engineers- 10%
HR and Finance 15%
-
8/3/2019 NTPC - Finished
14/42
NTPC PLANTS
-
8/3/2019 NTPC - Finished
15/42
NTPC HEADQUARTERS
NTPC Limited is divided in 8 HQ.Headquarter City
NCR HQ Delhi
ER-I, HQ Patna
ER-II, HQ Bhubaneshwar
NR HQ Lucknow
SR HQ Hyderabad
WR-I HQ Mumbai Hydro HQ Delhi
WR-II HQ Raipur
-
8/3/2019 NTPC - Finished
16/42
13 Coal Stations7 Gas Stations
15 Coal Stations
7 Gas Stations
-
8/3/2019 NTPC - Finished
17/42
NTPC PlantsThermal-Coal based
City State Inst. Capacity
Singrauli UttarPradesh 2,000
Korba Chhattisgarh 2,600
Ramagundam Andhra Pradesh 2,600
Farakka West Bengal 2,100
Vindhyachal Madhya Pradesh 3,260
Rihand Uttar Pradesh 2,000
Kahalgaon Bihar 2,340
Dadri Uttar Pradesh 2,310
Talcher Orissa 3,000
Unchahar Uttar Pradesh 1,050
Talcher Thermal Orissa 460
Simhadri Andhra Pradesh 1,500
Tanda Uttar Pradesh 440 Badarpur Delhi 705
Sipat Chhattisgarh 1660
Sipat (erection phase) Chhattisgarh 1980
Bongaigaon (erection phase) Assam 750
Mouda (erection phase) Maharashtra 1000
(2x500MW) Total 25,815
-
8/3/2019 NTPC - Finished
18/42
Coal Based (Owned by JVs)
Name of the JV City State Inst.Capacity
NSPCL Durgapur West Bengal 120 NSPCL Rourkela Orissa 120
NSPCL Bhilai Chhattisgarh 574
NPGC Aurangabad Bihar 1980
NPGC Kanti Bihar 110
Total 2904
-
8/3/2019 NTPC - Finished
19/42
GAS based
City State Inst .Capacity
Anta Rajasthan 413
Auraiya Uttar Pradesh 652
Kawas Gujarat 645Dadri Uttar Pradesh 817
Jhanor Gujarat 648
Kayamkulam Kerala 350
Faridabad Haryana 430
Total 3995
http://../New%20Folder/National_Thermal_Power_Corporation.wike.htmhttp://../New%20Folder/National_Thermal_Power_Corporation.wike.htm -
8/3/2019 NTPC - Finished
20/42
Installed Capacity
-
8/3/2019 NTPC - Finished
21/42
Regional Spread of Generating
Facilities
-
8/3/2019 NTPC - Finished
22/42
PERFORMANCE
-
8/3/2019 NTPC - Finished
23/42
Power Generation
Presently, NTPC generates power from Coal and Gas.With an installed capacity of 34,854 MW, NTPC isthe largest power generating major in the country.
It has also diversified into hydro power, coal mining,power equipment manufacturing, oil & gasexploration, power trading & distribution.
With an increasing presence in the power value chain,NTPC is well on its way to becoming an IntegratedPower Major.
-
8/3/2019 NTPC - Finished
24/42
Operations
In terms of operations, NTPC has always beenconsiderably above the national average.
The availability factor for coal based powerstations has increased from 89.32% in 1998-99
to 91.62% in 2010-11, which compares
favourably with international standards.
The PLF has increased from 76.6% in 1998-99
to 88.29% during the year 2010-11.
-
8/3/2019 NTPC - Finished
25/42
Subsidiaries NTPC Electric Supply Company Ltd. (NESCL)
NTPC Vidyut Vyapar Nigam Ltd. (NVVN)
NTPC Hydro Ltd. (NHL)
Pipavav Power Development Co. Ltd. (PPDCL)
Kanti Bijlee Utpadan Nigam Limited, (formerly
known as Vaishali Power Generating Company
Limited)
Bharatiya Rail Bijlee Company Limited (BRBCL)
-
8/3/2019 NTPC - Finished
26/42
JOINT VETURE COMPANIES
NTPC-SAIL POWER COMPANY (PVT) LTD (NSPCL)
NTPC TAMILNADU ENERGY COMPANY LIMITED
KANTI BIJLEE UTPADAN NIGAM LTD
ARAVALI POWER COMPANY PRIVATE LTD
BHARATIYA RAIL BIJLEE COMPANY LTD
MEJA URJA NIGAM PRIVATE LIMITED
-
8/3/2019 NTPC - Finished
27/42
Continues
RATNAGIRI GAS & POWER PVT. LIMITED
NABINAGAR POWER GENERATING CO. PVT. LTD.
NTPC -ALSTOM POWER SERVICES PVT. LTD. (NASL)
UTILITY POWER TECH LTD
NATIONAL HIGH POWER TEST LABORATORY PVT. LTD.(NHPTL)
PTC (India) Ltd
NATIONAL POWER EXCHANGE LTD.(NPEX)
-
8/3/2019 NTPC - Finished
28/42
Continues
NTPC SCCL GLOBAL VENTURES PRIVATE LTD
INTERNATIONAL COAL VENTURES PVT. LIMITED (ICVL)
NTPC-BHEL POWER PROJECTS PVT.LTD
BF NTPC ENERGY SYSTEM LIMITED.
NTPC-TELK
ENERGY EFFICIENCY SERVICES LTD. (EESL)
CIL-NTPC URJA PRIVATE LIMITED (CNUPL)
ANUSHAKTI VIDHYUT NIGAM LIMITED (ASHVINI)
-
8/3/2019 NTPC - Finished
29/42
Environment Safety
Systems
-
8/3/2019 NTPC - Finished
30/42
Pollution Control Systems
Electrostatic Precipitators
Flue Gas Stacks
Neutralisation Pits
Coal Settling Pits / OilSettling Pits
Ash Disposal Systems
Ash Water Recycling
System Dry Ash Extraction System
(DAES)
Liquid Waste Treatment Plants &Management System
Municipal Waste Management
Hazardous Waste Management
Bio-Medical Waste Management
Land Use / Bio-diversity
Upgradation & Retrofitting ofPollution Control Systems
-
8/3/2019 NTPC - Finished
31/42
Continues
Sewage Treatment Plants &Facilities
Environmental Institutional Set-up
Environment Management DuringOperation Phase
Monitoring of Environmental
Parameters
On-Line Data Base Management
Resources Conservation
Waste Management
Bio-Medical Waste Management
Land Use / Bio-diversity
Reclamation of Abandoned Ashponds
Green Belts, A forestation &Energy Plantations
Environment Review
-
8/3/2019 NTPC - Finished
32/42
Ash Utilization
Road Embankment Construction & Filling Works
Concrete Works
Building Construction Works
Mine Filling
Railway Embankment
Showcase Projects on use of Ash in Agriculture
-
8/3/2019 NTPC - Finished
33/42
NTPC is:
1 in the world in capacity utilization
3 in Asia in electricity output and # 10 in the
world
3 in the world in plant availability
.
-
8/3/2019 NTPC - Finished
34/42
COMPETITORS
NHPC
Tata Power
Reliance Power
Adani Power
Damodar Valley
Corporation
Lanco Infratech
SJVN
Nuclear Power
Corporation of India
CLP Power
Neyveli Lignite
Corporation
Torrent Power
-
8/3/2019 NTPC - Finished
35/42
AWARDS
Ranked 348th in Global ranking amongGlobal 2000 list of companies compiled byForbes in 2011.
Platts Top 250 Global Energy CompanyRankings2010
NTPCthe Most Respected Company inPower Sector awarded by Business world
-
8/3/2019 NTPC - Finished
36/42
Continues
NTPC has been ranked Number One News Maker in
the Power Sector of India by the Business Today
Indias Biggest News Makers Survey.
NTPC ranked amongst top 10 companies by the
premier business daily Business Standard in the 'BS
1000' listing of India's corporate giants for the year
2009. NTPC ranked 9th in the list of 1000 companies.
-
8/3/2019 NTPC - Finished
37/42
NTPC ranked 19th by the GPTW for 2011 amongst25 top Best Companies in India
NTPC ranked 6th amongst 25 top Best Employers inCountry
Exemplary Leadership Award to Shri Arup Roy
Choudhury for People Excellence
NTPC wins Star TV Talent Leadership and HRAward
Two Awards for NTPC at Asia Best Employer BrandAwards
-
8/3/2019 NTPC - Finished
38/42
Overall 7th in Indias Best Companies to Work for2010, 1st amongst the PSUs and 1st in Manufacturing& Production Industry Segment.
Great Places to Work Award 2010
NCPEDP-Shell Helen Keller Award 2009
Vishwakarma Rashtriya Puraskar (VRP)2007
Best Companies to Work For2009
SCOPE Meritorious Award for Best Practices inHuman Resource Management
-
8/3/2019 NTPC - Finished
39/42
NTPC - 2017
An Indian MNC with presence in many countries
Diversified utility with multiple businesses
Amongst top five market capitalization in theIndian market
Group turnover of over Rs. 1,400 Bn with 30000+employees
Setting benchmarks in project construction andavailability and efficiency
-
8/3/2019 NTPC - Finished
40/42
Continue
Have a strong research and technologybase
Loyal customer base in both bulk and retailsupply
Preferred employer
A leading corporate citizen with a keenfocus on executing its social responsibility
-
8/3/2019 NTPC - Finished
41/42
STOCK PRICE
BSE - 172.00NSE - 172.45
-
8/3/2019 NTPC - Finished
42/42
THANK YOU