1. Why we observe OEE ?
Overall equipment effectiveness (OEE)Definition of Overall Equipment Effectiveness OEEis an indicator of how a machine , production line or a process are performing in terms of Availability , Performance (Speed) and Quality .
OEE 指的是生产过程中 ,机器 ,生产线或者一个流程的生产能力的效率和质量的具体体现 .
How actually can look 8 hour on the machine ?
Loss from start machine
Adjust machine
Personel fault
Planned downtime
Product changeover
Failure machine
Cycle optimatization
Production
开机损失 更换定单
机器调整 机器故障
个人失误 周期优化
Planned production time
Gross operating time
Net operating time
Valuable operating time
Planned down-time
Unplenned down-time losses
Speed losses
Quality losses
Availability(A)
Performance(P)
Quality(Q)
Defects in process
Idling & MinorStoppages
Reduced speed
Equipment failure
Set up & Adjustment
Theoretical production time , 365 days , 24 hours
= X XOEE
Planning factor(Pf)
= X OEE
Availability(A)
Performance(P)
Quality(Q)
TOEE
Planning factor(Pf)
Six big losses
Start up losses
Total Productivity
理论年度 ,每天生产时间
1. Why we observe OEE ?
Key requirement for stabilization and betterment OEE are :关键设备的稳定性和 OEE改进 Strong maintenance 加强维护保养 Good molds (tools) and trim tools 良好模具和相关工具 Stable and Manage proceses 过程稳定和可控性 Strong process TPM (Total Productive Maintenance)加强全过程的生产保养 Quickly change molds processes 快速的模具更换流程 Professionally schooled worker oriented on the work in team 专业的职工队伍
1. Why we observe OEE ?
OEE is tool for measuring most important managerial parameters and give answer of most main question
give information about weak spots in production process
support expansion of production (stability production process)
help to see production process in detail
make possible benchmark with others companies in branch
OEE helps predictability in production
Planned production time
Gross operating time
Net operating time
Valuable operating time
Planned down-time
Unplenned down-time losses
Speed losses
Quality losses
Availability(A)
Performance(P)
Quality(Q)
Defects in process
Idling & MinorStoppages
Reduced speed
Equipment failure
Set up & Adjustment
Theoretical production time , 365 days , 24 hours
= X XOEE
Planning factor(Pf)
Availability(A)
Performance(P)
Quality(Q)
Six big losses
Start up losses
2. Definition OEE
OEE
TOEE
2. Definition
Planned downtime计划停机时间 :- dowtime approved management companies as planned down-time
- we could also say : planned down-time which production teams aren´t
influence
- examples : Sampling , Mold cleaning , Machine cleaning , power cutting , planned maintenance ,
planned maintenance periphery , NO production order
OEE
TOEE
Planned production time Planned down-time
Planning factor(Pf)
Total Productivity
2. Definition
(A)
Availability factor is calculated on the basis of the Planned production time and Unplanned dowtime losses , and is the ratio of the planned production time to the gross operating time .
Availability factor most influence : - failures (maintenance and process) and machine defects (maintenance) ,
edfects equipments , operator errors , tool changes , unplanned cleaning , time for adjustment machines / tools / equipments , communications , .....
* for the easy analysis dowtime we have cods
OEE
Gross operating timeUnplenned down-time losses
Equipment failure
Set up & Adjustment
Availability
Six big losses
2. Definition
OEE
Performance factor is calculated on the basis of the Gross operating time and the
Performance (speed) losses = difference between norm and really cycle
time
Performance factor most influence : - performance reduction
(P)
PerformanceNet operating time Speed
losses
Idling & MinorStoppages
Reduced speed
Six big losses
2.Definition
(Q)
OEE
Quality factor we here mean the product quality which influences the production yield .
Quality factor is calculated on the basis of the Net operating time and Quality . Losses due to „Defects in process“ and „Start up losses“ .
* we have cods for quality faults – FA , FU , FO .
Valuable operating time
Quality losses
Defects in process
Start up losses
Quality
2. Definition
=X
X
OEE
= X OEE
Availability(A)
(P)
Quality(Q)
TOEE
Planning factor(Pf)
OEE
TOEE
Performance
Planned dow- time
Total Productivity
Planned production time
Gross operating time
Net operating time
Valuable operating time
Planned down-time
Unplenned down-time losses
Speed losses
Quality losses
Availability(A)
Performance(P)
Quality(Q)
Defects in process
Idling & MinorStoppages
Reduced speed
Equipment failure
Set up & Adjustment
Theoretical production time , 365 days , 24 hours
= X XOEE
Planning factor(Pf)
Availability(A)
Performance(P)
Quality(Q)
Six big losses
Start up losses
2. Definition OEE
OEE
TOEE
Total Productivity
5. Finish
Where is our competition ?
0
102030405060708090
100
Average in branche
The best
Qualities of best companies : • Great experience with the measuring of losses in production process • Systematicle improvement • Improving of employees qualification