Onondaga County CSO Abatement Gray Project Update
![Page 2: Onondaga County CSO Abatement Gray Project Update](https://reader033.vdocument.in/reader033/viewer/2022051419/56815a69550346895dc7bc01/html5/thumbnails/2.jpg)
2
2012 Gray Project Update• Harbor Brook Intercepting Sewer Replacement
Project• CSO 044 Conveyance Pipeline• CSO 022/045 Sewer Separation Projects• Clinton CSO Storage Facility• Lower Harbor Brook CSO Storage Facility• CSO 063 Conveyance Project• Floatables Assessment Plan
![Page 3: Onondaga County CSO Abatement Gray Project Update](https://reader033.vdocument.in/reader033/viewer/2022051419/56815a69550346895dc7bc01/html5/thumbnails/3.jpg)
3
Harbor Brook Intercepting Sewer Replacement Project – ACJ Milestone Date 12/31/2013• Replaces a significant portion
of infrastructure that was originally installed in the early 1900’s.
• 7500 feet of interceptor sewer replacement, 5200 feet of local sewer replacement and 1860 feet of sewer rehabilitation.
• Project green infrastructure elements included tree basins, rain gardens and bio-retention basins.
• Estimated annual CSO capture is 0.9% or 36 million gallons.
• Included separation of CSO 013 (Seymour Street) and CSO 016 (Lydell Street)
![Page 4: Onondaga County CSO Abatement Gray Project Update](https://reader033.vdocument.in/reader033/viewer/2022051419/56815a69550346895dc7bc01/html5/thumbnails/4.jpg)
4
CSO 044 Conveyance Project-ACJ Milestone Date 12/31/2011• 500 foot long 96-inch
diameter conveyance pipe line.
• Conveyance will capture the full 1 year 2 hour storm volume from CSO 044.
• Project incorporated storm water capture for pipe line flushing.
• Final restoration included rain gardens.
• Estimated annual CSO capture is 0.3% or 12 million gallons.
![Page 5: Onondaga County CSO Abatement Gray Project Update](https://reader033.vdocument.in/reader033/viewer/2022051419/56815a69550346895dc7bc01/html5/thumbnails/5.jpg)
5
CSO 022/045 Sewer Separation Project• Combined project into one
construction contract to minimize administration costs.
• CSO 022 – Fayette Street and West Genesee Street near Dinosaur BBQ. (Clinton Lower Main Intercepting Sewer CSO Area)
• CSO 045 – Hudson Street and Crescent Street. (Midland CSO Area)
![Page 6: Onondaga County CSO Abatement Gray Project Update](https://reader033.vdocument.in/reader033/viewer/2022051419/56815a69550346895dc7bc01/html5/thumbnails/6.jpg)
6
Clinton CSO Storage Facility – ACJ Milestone 12/31/2013
• 6.5 million gallon storage capacity - volume of storage was increased by 40%.
• Facility will employ green and innovative technologies to reduce operating costs.
• Very challenging construction▫ Limited site space▫ High chloride
concentration in groundwater
![Page 7: Onondaga County CSO Abatement Gray Project Update](https://reader033.vdocument.in/reader033/viewer/2022051419/56815a69550346895dc7bc01/html5/thumbnails/7.jpg)
7
Clinton CSO Storage Facility (cont.)
![Page 8: Onondaga County CSO Abatement Gray Project Update](https://reader033.vdocument.in/reader033/viewer/2022051419/56815a69550346895dc7bc01/html5/thumbnails/8.jpg)
8
![Page 9: Onondaga County CSO Abatement Gray Project Update](https://reader033.vdocument.in/reader033/viewer/2022051419/56815a69550346895dc7bc01/html5/thumbnails/9.jpg)
9
![Page 10: Onondaga County CSO Abatement Gray Project Update](https://reader033.vdocument.in/reader033/viewer/2022051419/56815a69550346895dc7bc01/html5/thumbnails/10.jpg)
10
Lower Harbor Brook CSO Storage Facility – ACJ Milestone 12/31/2013
• 4.9 million gallon storage capacity – volume of storage was increased by 35%.
• Facility will employ green and innovative technologies to reduce operating costs.
• Very challenging construction▫ Limited site space▫ High chloride
concentration in groundwater
![Page 11: Onondaga County CSO Abatement Gray Project Update](https://reader033.vdocument.in/reader033/viewer/2022051419/56815a69550346895dc7bc01/html5/thumbnails/11.jpg)
11
![Page 12: Onondaga County CSO Abatement Gray Project Update](https://reader033.vdocument.in/reader033/viewer/2022051419/56815a69550346895dc7bc01/html5/thumbnails/12.jpg)
12
![Page 13: Onondaga County CSO Abatement Gray Project Update](https://reader033.vdocument.in/reader033/viewer/2022051419/56815a69550346895dc7bc01/html5/thumbnails/13.jpg)
13
Future Projects• Floatables Control
Plan• CSO 063 (Emerson
Avenue – Harbor Brook CSO Area) Conveyance Pipe Line.
• CSO 061 (Crehange Street – Midland CSO Area) Sewer Separation
![Page 14: Onondaga County CSO Abatement Gray Project Update](https://reader033.vdocument.in/reader033/viewer/2022051419/56815a69550346895dc7bc01/html5/thumbnails/14.jpg)
Questions!
Please Visit:www.SaveTheRain.us