OTC 2017May 1-4, 2017 | Houston, Texas | NRG Center | Booth #2827
Offshore Technology Conference
an unconventional approach to minimizing OPEX and maximizing reservoir contact in deepwater completions
Press Event: Monday, May 1st
at 10:30 a.m.Baker Hughes Booth #2827
Join Jim Sessions, Vice President, Completions at Baker Hughes, as he unveils the
Take the Rig Out of the Workover
Minimize deferred production, increase recovery, and prolong ESP life
Better, Safer Stimulations with Less Cost
Boost the ROI of your sandstone acid diverter
Cost-effective Well Abandonment
Reduce time, footprint, NPT… and your budget
Good Vibrations? In Drilling, There’s No Such Thing
Mitigate lateral vibrations and stick-slip with enhanced bit technology
An Unconventional Approach to Deepwater Completions
Minimize OPEX and maximize reservoir contact with tools and techniques perfected on land
Mud Means More in the Reservoir
Protect your pay zone and injectors without sacrificing drilling performance
Mon 3:00 | Tues 10:30 | Tues 4:00 | Wed 1:00 | Thurs 9:30
Mon 2:30 | Tues 9:30 | Tues 3:00 | Wed 11:00 | Wed 4:30
Mon 1:30 | Tues 2:30 | Wed 10:30 | Wed 4:00
Mon 1:00 | Tues 1:30 | Wed 9:30 | Wed 3:00 | Thurs 11:30
Press Event - Mon 10:30 | Mon 4:30 | Tues 1:00 | Wed 2:30 | Thurs 11:00
Mon 4:00 | Tues 11:00 | Tues 4:30 | Wed 1:30 | Thurs 10:30
Press Event: Monday, May 1st
at 10:30 a.m.Baker Hughes Booth #2827
In-B
ooth
Pre
sent
atio
ns
Time Topic
9:30 Digital Artist
10:30
DEEPFRAC™ Service Press Event:An Unconventional Approach to Deepwater Completions Minimize OPEX and maximize reservoir contact with tools and techniques perfected on land
11:30 Digital Artist
1:00 Good Vibrations? In Drilling, There’s No Such Thing
1:30 Cost-effective Well Abandonment
2:00 Digital Artist
2:30 Better, Safer Stimulations with Less Cost
3:00 Take the Rig Out of the Workover
3:30 Digital Artist
4:00 Mud Means More in the Reservoir
4:30 An Unconventional Approach to Deepwater Completions
Time Topic
9:30 Better, Safer Stimulations with Less Cost
10:00 Digital Artist
10:30 Take the Rig Out of the Workover
11:00 Mud Means More in the Reservoir
11:30 Digital Artist
1:00 An Unconventional Approach to Deepwater Completions
1:30 Good Vibrations? In Drilling, There’s No Such Thing
2:00 Digital Artist
2:30 Cost-effective Well Abandonment
3:00 Better, Safer Stimulations with Less Cost
3:30 Digital Artist
4:00 Take the Rig Out of the Workover
4:30 Mud Means More in the Reservoir
Monday, May 1 Tuesday, May 2In
-Boo
th P
rese
ntat
ions
BUMPSTER Wireless Speaker
Time Topic
9:30 Good Vibrations? In Drilling, There’s No Such Thing
10:00 Digital Artist
10:30 Cost-effective Well Abandonment
11:00 Better, Safer Stimulations with Less Cost
11:30 Digital Artist
1:00 Take the Rig Out of the Workover
1:30 Mud Means More in the Reservoir
2:00 Digital Artist
2:30 An Unconventional Approach to Deepwater Completions
3:00 Good Vibrations? In Drilling, There’s No Such Thing
3:30 Digital Artist
4:00 Cost-effective Well Abandonment
4:30 Better, Safer Stimulations with Less Cost
Time Topic
9:30 Take the Rig Out of the Workover
10:00 Digital Artist
10:30 Mud Means More in the Reservoir
11:00 An Unconventional Approach to Deepwater Completions
11:30 Good Vibrations? In Drilling, There’s No Such Thing
Wednesday, May 3 Thursday, May 4
In-B
ooth
Pre
sent
atio
ns
Meeting Room
Presentation Area
ChargingStation
3D Art
Camer
a
Phot
o Op
portu
nity
1 2
3
4
56
79
1211 1013
14
8
15
16
17
18
20
21
23
24
25
22
19
Bake
r Hug
hes
Boot
h
1. DEEPFRAC™ Deepwater Multistage Fracturing Service
2. Baker Hughes Innovation3. Production Monitoring Services 4. CENtrilift PASS™ Slimline ESP System5. Artificial Lift Solutions6. Electronic Permanent Downhole
Monitoring Systems § SureSENS™ SPTV § SureSENS™ QPT ELITE
7. TransCoil™ Rigless-deployed ESP System8. EQUALIZER JET™ Stimulation
Flow Control Device with MTV9. EQUALIZER LIFT™ Inflow Control Device10. Drilling and Completion Fluids 11. FATHOM™ XT Deepwater
Subsea-certified Chemicals12. Production Chemical Solutions
13. GaugePro™ Echo On-command Digital Reamer
14. FASTrak™ HD LWD Fluid Analysis Sampling and Testing Service
15. FTeX™ Advanced Wireline Formation Pressure Testing Service
16. Integrity eXplorer™ Cement Evaluation Service
17. Cementing Services18. Stimulation Services19. AutoTrak™ Rotary Steerable Systems20. TeleCoil™ Intelligent Coiled Tubing Service 21. WellLink™ Digital Solutions22. Technology Direct and
ShopBakerHughes.com23. Dynamus™ Extended-life Drill Bit24. TerrAdapt™ Adaptive Drill Bit25. Kymera™ XTreme Hybrid Drill Bit
Join us each day as artist Jennifer Stelco showcases her live speed-painting skills while working in a virtual world of her own creation.
Tuesday 10:00 | 11:30 | 2:00 | 3:30
Wednesday 10:00 | 11:30 | 2:00 | 3:30
Thursday 10:00
Monday 9:30 | 11:30 | 2:00 | 3:30
Taking the Art of Innovation Into the Digital Realm
You’ll even have a chance to explore the world on your own and get your photo taken next to one of her virtual creations.
Kymera™ XTreme Hybrid Drill Bit
Deep Shear Wave Imaging Processing Service
CND500 Multifunctional Microemulsion
Near-Wellbore Treatment
GelBlock™ Temporary Annular Isolation System
Hart’s E&P Meritorious Awardfor Engineering Innovation Winners
Tech
nica
l Pap
ers* Monday, May 1 Tuesday, May 2
Time Paper Number/Title Authors
HP/HT Applications and Technology
11:42 27827 - Ultra HP/HT Removable Production Packer for Deep Water Applications
A. Velasco Suarez, C. Young, L. Urban, G. Anderson, S. Bisset
Cost-Effective Solutions for a New Oil and Gas Scenario
10:14 27811 - Reducing Subsea Technology Development Lead-Times - A Case Study
L.N. Portman, Baker Hughes J. Gonzalez, L. Bay, J. Margulis, Aker Solutions
Materials and Innovations for Deepwater Reliability and Affordability
2:22 27914 - Effect of Hydrogen Bake-out on Copper Plated Alloy 718
D. Kumar, Z. Xu, P. Agosta, B.M. Bailey
3:06 27609 - Nano-Enhanced Elastomers for Oilfield Applications
R. Dolog, D. Ventura, V.N. Khabashesku, Q. Darugar
3:28 27538 - Development of Advanced Seal Material and Downhole Packer for High Temperature Applications
C. Yu, Z. Xu, G. Shyu, C. Prieto
Production Chemistry: Managing Physicochemical Challenges to Unlock Value
3:06 27653 - Cleanup of Organic and Inorganic Wellbore Deposits Using Microemulsion Formulations: Assessment and Field Applications
L. Quintero, R. Ponnapati, M.J. Felipe
Time Paper Number/Title Authors
Well Completions
9:30 27897 - Optimizing Proppant Surface Properties to Improve Formation Flow in Offshore Frac-Packs
N. Spurr, D.G. Stanley, V. Williams, M.J. Usie, H. Nguyen, Baker Hughes; E. Hoffpauir, LLOG Exploration
10:58 27935 - Innovation in Reservoir-Driven Shaped Charges Enhances Productivity
S. Zuklic, R.P. Satti, W.D. Myers, D. Betancourt, W. Harvey, T. Sampson, R. White
Impact of US Shale Swing Production on Deepwater Development and the Global Energy Landscape
Chairperson: Partha Ganguly
2:44 27894 - Degradable Thermoset Polymer Composite for Intervention-Less Downhole Tools
S. Khatiwada; P. Duan, R.R. Garza, A.K. Sadana
3:28 27905 - Novel Degradable Polymer Composite Balls for Hydraulic Fracturing Applications
R.R. Garza, P. Duan, A.K. Sadana, S. Khatiwada
Time Paper Number/Title Authors
Technology Development and Maturation
10:36 27805 - Accelerated Innovation as the Great Enabler for Well Completions - Tools for Cheaper, Safer and Faster Ways of Completing Wells
P. Ganguly
Advances in Abandonment and Decommissioning Technologies
10:14 27807 - We’re Stuck: Efficient Casing Removal for Well Abandonment Applications
L.C. Joppe, G.L. Kelman, J.F. Nelson
Well Logging
2:00 27817 - Advanced Petrophysical Evaluation of a Low-Resistivity Laminated Shaly Sand Formation Showed Significant Increase in Reserves Calculations
A. Kukharchuk, X. An, Baker Hughes; E. Doss, Tana Exploration Co.
2:22 27758 - Development of Reliable Transducer and Electronics Technology for an LWD Ultrasonic Imaging Tool
Z.S. Leonard, S. Rahman, R.R. Steinsiek
2:44 27723 - Petro-physically Driven Quality Control Of Dielectric Logging
B. Kouchmeshky, O.N. Fanini
3:06 27553 - Selective Perforation and Design of Multi-Pattern Infill Wells in Field Development Planning and Optimization under Geological Uncertainty
J. Oppelt, Baker Hughes; O. Bello, D.D. Awofodu, Clausthal University of Technology; L. Ganzer, Clausthal University of Technology
3:50 27642 - New Dual Digital On-command Under Reamer Solution Performed Multiple Activation Cycles in Challenging Exploration Well not Compromising Acoustic Measurements
S. Grymalyuk, M. Schimanski, J. Herlitzius
Wednesday, May 3 Thursday, May 4
Time Paper Number/Title Authors
Advancements in Offshore Drilling Technology
9:30 27592 - Johan Sverdrup. Creating a Unique Environment for Successful Drilling Operations in an Accelerating Spotlight Project
B. Jones, K. Henriksen, Baker Hughes; J. Øregaard, J.A. Carlsen, S.I. Rafoss, T. Tonnessen, Statoil; T. Gloppen, Odfjell Drilling
Uncertainty of Laboratory Measurements: Challenges for Offshore Field Development Planning
9:52 27604 - Kinetics Of Fluid Phase Behavior Changes: A Critical Uncertainty For Offshore Field Development
L. Portman, Baker Hughes; D.M. Lavenson, A. Kelkar, Chevron ETC; N.B. Joshi, Anadarko Petroleum Corp; S. Scott, Petroleum ETC
Intervention, Abandonment and Decommissioning
2:44 27585 - Breakthrough Technology Overcomes Long Standing Challenges and Limitations in Cement Integrity Evaluation at Downhole Conditions
S. Kamgang, A. Hanif, R. Das
3:28 27618 - Efficient and Safe Casing Removal with Downhole Hydraulic Pulling Assembly
C. Hartman, J. Cullum, J. Melder
*Cur
rent
as
of A
pril
12,2
017
Tech
nica
l Pap
ers*
© 2017 Baker Hughes Incorporated. All rights reserved. 45149 04/2017
| bakerhughes.com/otc