OutlinePore Pressure and Fracture GradientDrilling FluidCasing DesignCement DesignDrilling BitEconomic Analysis
![Page 3: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/3.jpg)
Area of Interest
![Page 4: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/4.jpg)
Area of Interest
![Page 5: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/5.jpg)
Area of Interest
![Page 6: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/6.jpg)
Area of Interest
![Page 7: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/7.jpg)
OGIP Surface Map
![Page 8: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/8.jpg)
Porosity Surface Map
![Page 9: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/9.jpg)
Porosity 3D View
![Page 10: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/10.jpg)
Net Pay 3D View
![Page 11: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/11.jpg)
Vertical Well Placement
![Page 12: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/12.jpg)
Horizontal Well Placement
![Page 13: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/13.jpg)
Future Production Estimate
![Page 14: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/14.jpg)
Fracturing Well #1
![Page 15: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/15.jpg)
Pore Pressure and Fracture Gradient
Equation used Pff = 0.33 x [(σOB / d) + 2 x (σpore / d)]
Pore Pressure Gradient
Approximately 0.42 psi/ft
Fracture Gradient
Approximately 0.73 psi/ft
![Page 16: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/16.jpg)
Casing DesignAPI GRADE Yield Strength Min Ultimate Strength Min Elongation J-55 40K (min) – 80K (max) [psi] 60K psi 29.5%[Table 7.1 from text]
Based off of the calculated yield strength: around 42,000 psi No need for larger ultimate strength Water Table between 500 – 2000 foot (From NE)
Conductor Casing: 50 feet Surface Casing: 2200 feet Intermediate Casing: 6000 feet Production Casing: 12000 feet
50
2200
6000
12000
![Page 17: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/17.jpg)
Casing Design cont’d Casing Diameter Casing Pressure
Conductor 23.125 in 20 in 35 psi
Surface 19.2 in 14 in 1100 psi Intermediate 13.5 in 11.25 in
2460 psi Production 9.4 in 8.4 in 4850 psi
• SF = 1.7
![Page 18: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/18.jpg)
Casing Design cont’d Casing Collapse Res.
Conductor 480 psi Surface 1875 psi Intermediate 5500 psi Production 10200 psi
MW = Pressure x (0.052 x TVD)
![Page 19: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/19.jpg)
Drilling Fluid Casing Mud Weight
Conductor 13.4 ppg Surface 8.76 ppg Intermediate 7.58 ppg Production 6.16 ppg
MW = Pressure x (0.052 x TVD)
![Page 20: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/20.jpg)
Cement DesignType: Class C High early strength properties which allows cement to be used at high water levels.Regularly used for shallow well cementing operations through salt beds.
Density of the cement = 11.53 ppg
![Page 21: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/21.jpg)
Cement Design cont’dAc = ( dout
2 – din
2) / 1029.4 (bbl/ft)Volume = Ac (bbl/ft) * Depth (ft) Casing Cement Volume Conductor 6.5 bbl 36.498 ft3
Surface 368.9 bbl 2071.37 ft3
Intermediate 324.58 bbl 1822.52 ft3
Production 207.49 bbl 1165.07 ft3
Total cement Volume 907.47 bbl 5095.44 ft3
![Page 22: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/22.jpg)
Drilling BitDrilling through shale and sandstone We will use Poly diamond crystal bit (because
they are faster and tend not to break as often as other bits)
Use multi pad drilling (Will use 75% less land)
![Page 23: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/23.jpg)
DrillingHow many days to reach depth?It will take about 14 and half days to drill to the
pay zone with an average rate of penetration of 34.3 ft/hr
![Page 24: Outline](https://reader035.vdocument.in/reader035/viewer/2022062816/56814588550346895db26d68/html5/thumbnails/24.jpg)
How much will it cost per day?rule-of-thumb for trip-time estimations is 1
hr/1,000 ft of a well.C= [(R=$1125)( (t=12 hrs) +(td=350hrs)+Cb
$25,000]/(F=12,000ft) = $36.02/ft$29,652.35How much will it cost total to drill?$432,331.27