P6 as Cost Management System

Prepared by:Patrick O’ConnellProject Control Group LeadGeorgia Transmission Corporation

Budgeting and Integrating Costs Into P6 From Finance System

Session ID#: 15459

Page 2: P6 as cost management system - Oracle Primavera P6 Collaborate 14

Georgia Transmission Corporation

■ GTC - owned by 39 Electric Membership Cooperatives (EMCs) in Georgia

■ Build, operate and maintain Transmission Lines and Substations ▪ Not only for the EMC’s but also for the ITS▪ ITS – shared transmission system in Georgia with 4 members:

GTC, GPC, MEAG and Dalton▪ That means we have access to any Station or Line▪ Very good reliability for our members

Page 3: P6 as cost management system - Oracle Primavera P6 Collaborate 14

Project Teams

■ How we do it:▪ We are a matrix organization

— PM Group

— Functional Managers supplying team members

▪ Divided into Project Teams— North, South and Bulk teams

— Some resources hard matrixed to a team

— Others assigned based on availability

▪ Project Reporting (PR) supports not only the Project Managers but also Planning, Environmental, Land Acquisition, Design, Construction and Maintenance

▪ PR also works with Accounting, Finance and IT and almost everyone else including HR and others

Page 4: P6 as cost management system - Oracle Primavera P6 Collaborate 14

Project Control Specialists

■ Assigned to a SS and TL Project Manager■ Estimate, Maintain and Closeout

▪ Approximately 400 - 450 active projects▪ 100 mile Transmission lines to small substation modifications▪ Schedule updates semi-monthly▪ Responding to schedule and cost variance reports for EMC, ITS

and BOD▪ Responding to PM, timesheet users, functional managers

Page 5: P6 as cost management system - Oracle Primavera P6 Collaborate 14

Capital Projects - Projects in Primavera

■ All capital projects and some others for timesheet users■ Schedules created from standard templates

▪ Provide standard lead times for common projects▪ Proper coding for time, contracting and invoices

■ Resource loaded▪ Timesheet users may be assigned in template or

— Assigned by their matrix assignment or

— Assigned by department

▪ Expense codes for payments— Consistent across all projects

■ Project schedule has all cost – BAC, AC, ETC, EAC■ One Stop Shop (almost)

Page 6: P6 as cost management system - Oracle Primavera P6 Collaborate 14

Primavera Tools

■ Client▪ Power users

■ Timesheets▪ Time entry and status activities▪ Time entry only▪ Status activities only

■ Web Access▪ Admin users▪ Function Managers▪ Project Managers

Page 7: P6 as cost management system - Oracle Primavera P6 Collaborate 14

Primavera Supplemented by:

■ MS Access / SQL Server▪ Standardized and ad-hoc queries▪ Backbone for reporting

■ Excel▪ Daily Digest▪ Waterfalls for FM and PM

■ Business Objects▪ Cost reporting from Lawson (accounting)▪ Contract reporting▪ Validation of cost load

■ TPOP ▪ Planning Dept legacy web tool, where projects start

Page 8: P6 as cost management system - Oracle Primavera P6 Collaborate 14

Primavera Output from a Program Perspective■ Prepared from Primavera

▪ Annual Budget for Capital Projects— Major Expenditures

— Workforce planning

▪ Capital Projections— Major Expenditures

— Variance Reporting

▪ Semi – monthly resource waterfalls— FM and group leads have ability to provide feedback

— Construction

— Other – Quality Assurance, As-Built Tracking, Performance reporting

Page 9: P6 as cost management system - Oracle Primavera P6 Collaborate 14

Primavera Interfaces

■ Employee data from Lawson HR to Primavera resources— Contact info, payroll codes, etc

— Including contractors using the Timesheet tool

■ Primavera Project activity structure and resources to Lawson Activities

— Activity one to one

— Resources become sub accounts (expense codes)

■ Actual cost from Lawson GL to Primavera Activity / Resource■ TPOP to Primavera ■ Primavera to TPOP■ Timesheet to Lawson Payroll (ON DEMAND)

▪ By resource assignment

Page 10: P6 as cost management system - Oracle Primavera P6 Collaborate 14

PrimaveraTimesheet

PrimaveraProjectManager

LawsonPayroll

IntelliPlant

Lawson G/L& Activity Ledger

LawsonRequisition

LawsonInventory

Project data

LawsonProcurement

LawsonAP

Contract Line Itemsby CU & Activity

IssuedMaterials

AllocatedMaterials

LawsonHR

JournalEntries

Invoices byCLI/CU/Activity

CompletedTimesheet

On de

man

d MsAccess v

oucher validation ag

ainst a

ctivity

 data

Payroll Data

EmployeeData

WO Chargesby Activity

ProjectStatus &Man‐hours

TPOP

Primavera Web Access

Request AccountingProject Nbr

Built in PrimaveraFunctionality

Project Activity Structure

Page 11: P6 as cost management system - Oracle Primavera P6 Collaborate 14

Capital Projects - Projects in Primavera

■ Schedules created from standard templates▪ Proper coding for time, contracting and invoices

■ Resource loaded▪ Cost Resources

— Assigned to LOE and WBS summary activities

— LOE allows us to stagger cost (we don’t accrue)

▪ Man-hours— Roles and hard assigned resources

— Standards and some with plugged hours

Page 12: P6 as cost management system - Oracle Primavera P6 Collaborate 14

Capital Projects - Projects in Primavera

■ Schedules created from standard templates▪ Proper coding for time, contracting and invoices

■ Matrix for all departments▪ Contracts

— Construction, survey, environmental consulting all use the correct activity ids

▪ Payments— Voucher validation using the P6 database

– Payments from invoices matched against resource assignments– Contractors using timesheets– Import files for AP after signature

Page 13: P6 as cost management system - Oracle Primavera P6 Collaborate 14

Primavera Reports

■ We generate from the client first then go to other tools as needed (which is a lot)▪ Estimates▪ Current Cost / Man-hour Status▪ Scope Changes▪ Closeouts

■ Publish▪ Activity Layouts – somewhat of a savior▪ Project Websites – very painful (for my coop)

■ Data – for the web▪ Think of P6 Web as a reporting tool for the PM

Page 14: P6 as cost management system - Oracle Primavera P6 Collaborate 14

Client Demo

■ EPS / Projects – cost roll up■ Activities

▪ Show Admin Hammock▪ Show LOW / WBS

■ Resource Assignments▪ Estimate▪ Closeout

■ Reports – Closeout ■ Globals

▪ Save RPE▪ Save Scope Change▪ Closeout Fill in the blanks

Page 15: P6 as cost management system - Oracle Primavera P6 Collaborate 14

Please complete the session evaluationWe appreciate your feedback and insight

You may complete the session evaluation either on paper or online via the mobile app


Top Related