Transcript

Chapter 1:

Table 10.1 Energy Generation Potential in Floriculture Industry

DistrictPotential Energy Generation (h/yr)Capacity (kW)

Nakuru35,7418,160

Thika8,9352,040

Kiambu7,1481,632

Kajiado6,5521,496

Laikipia4,170952

Nyandarua4,170952

Meru3,574816

Gatundu2,383544

Machakos2,383544

Nyeri2,383544

Trans Nzoia2,383544

Athi River1,787408

Other7,1501,220

Total88,75819,852

Source: Updated Rural Electrification Master Plan, 2009

Table 10.2Biogas Potential from Sisal Production

CompanyGeneration Potential (h/yr)Capacity*

Rea Vipingo8,7501500-2000

DWA Estate Ltd.10,5001800-2400

Taita Estate12,6002150-2870

Mogotio Plantations6,3001080-

Kilifi Plantations1,750300-400

Tabu Estate Ltd.1,750300-400

Voi Sisal Estate700120-160

Note: *Assuming 12 to 16 hours full loadSource: Updated Rural Electrification Master Plan


Top Related