Parametric Estimationfor reliable IT Project Estimates
Frank VogelezangManager Pricing Office – Ordina MPC Member – COSMIC
![Page 2: Parametric Estimation for rel iable IT Project Estimates](https://reader035.vdocument.in/reader035/viewer/2022062323/56816755550346895ddc0c85/html5/thumbnails/2.jpg)
IntroductionFrank Vogelezang
Pricing Office- Setting commercial price for our service offerings- Challenging internal estimates with parametrics
2 17
120 km new railway
Extending the supportfor the method byby targeted guidelines and improved documentation
![Page 3: Parametric Estimation for rel iable IT Project Estimates](https://reader035.vdocument.in/reader035/viewer/2022062323/56816755550346895ddc0c85/html5/thumbnails/3.jpg)
AgendaParametric Estimation for reliable IT Project Estimates
Estimating
Getting a grip on IT cost and schedule
Functional Size
Translating requirements to manageable numbers
The power of parametrics
Building on proven reference datafor cost and schedule estimationfrom internal or external sources
3 17
![Page 4: Parametric Estimation for rel iable IT Project Estimates](https://reader035.vdocument.in/reader035/viewer/2022062323/56816755550346895ddc0c85/html5/thumbnails/4.jpg)
EstimatingGetting a grip on IT cost and schedule
![Page 5: Parametric Estimation for rel iable IT Project Estimates](https://reader035.vdocument.in/reader035/viewer/2022062323/56816755550346895ddc0c85/html5/thumbnails/5.jpg)
Estimating IT projectsTwo essential routes
Objective
Size
Effort
The Expert
Parametrics
5 17
Schedule & Cost
![Page 6: Parametric Estimation for rel iable IT Project Estimates](https://reader035.vdocument.in/reader035/viewer/2022062323/56816755550346895ddc0c85/html5/thumbnails/6.jpg)
Definition of an estimateGetting grip on IT cost and schedule
An estimate is an analytical and unbiased prediction of how long it takes and what it will cost
The bias comes from the interplay with targets, commitments and plans
6 17
![Page 7: Parametric Estimation for rel iable IT Project Estimates](https://reader035.vdocument.in/reader035/viewer/2022062323/56816755550346895ddc0c85/html5/thumbnails/7.jpg)
Viable estimation = Reliable estimatesGetting grip on IT cost and schedule
Analytical Can you verify in some way what your experts tell you?
Unbiased Will an expert give the same answer twice?
Prediction 100% certainty costs too much time and resources!
7 17
![Page 8: Parametric Estimation for rel iable IT Project Estimates](https://reader035.vdocument.in/reader035/viewer/2022062323/56816755550346895ddc0c85/html5/thumbnails/8.jpg)
Functional SizeTranslating requirements to manageable numbers
2.7
M
![Page 9: Parametric Estimation for rel iable IT Project Estimates](https://reader035.vdocument.in/reader035/viewer/2022062323/56816755550346895ddc0c85/html5/thumbnails/9.jpg)
Functional Size : Function Point AnalysisTranslating requirements to manageable numbers
FPA stands for FunctionPointAnalysis
What the software should be able to do (functionality)Functionexpressed in a number Pointbased on an objectively described method Analysis
Something intangible like functionality becomes a physical number that can be used for calculations
Five ISO/IEC standards: COSMIC, FiSMA, IFPUG, Mk II & NESMA
9 17
![Page 10: Parametric Estimation for rel iable IT Project Estimates](https://reader035.vdocument.in/reader035/viewer/2022062323/56816755550346895ddc0c85/html5/thumbnails/10.jpg)
Exit (X)
COSMIC Function Point Analysis : ISO/IEC 19761Translating requirements to manageable numbers
Entry (E)
Write (W) Read (R)
10 17
![Page 11: Parametric Estimation for rel iable IT Project Estimates](https://reader035.vdocument.in/reader035/viewer/2022062323/56816755550346895ddc0c85/html5/thumbnails/11.jpg)
The power of parametricsBuilding on proven reference data
![Page 12: Parametric Estimation for rel iable IT Project Estimates](https://reader035.vdocument.in/reader035/viewer/2022062323/56816755550346895ddc0c85/html5/thumbnails/12.jpg)
Parametric reality checkBuilding on proven reference data
Paul Masson’sLaw
Parkinson’sLaw
Brooks’Law
Minimal time
Optimal effort
Schedule
Effor
t / C
ost
RealisticProductivity
12 17
![Page 13: Parametric Estimation for rel iable IT Project Estimates](https://reader035.vdocument.in/reader035/viewer/2022062323/56816755550346895ddc0c85/html5/thumbnails/13.jpg)
How much certainty do you needBuilding on proven reference data
Prob
abili
ty
Schedule / Cost
0%
€ 750
.000
50%
€ 1.
000.0
00
75% €
1.25
0.000
90
% € 1.
900.0
00First likely option, overly optimistic
50/50 median result, for a balanced portfolio
75% for fixed price projects
90% for safety critical systems
13 17
![Page 14: Parametric Estimation for rel iable IT Project Estimates](https://reader035.vdocument.in/reader035/viewer/2022062323/56816755550346895ddc0c85/html5/thumbnails/14.jpg)
Keep track of the actual projectWhere will it end?
Schedule Variance
Time Variance
Cost VarianceBudget Variance
Actual costEarned value
14 17
![Page 15: Parametric Estimation for rel iable IT Project Estimates](https://reader035.vdocument.in/reader035/viewer/2022062323/56816755550346895ddc0c85/html5/thumbnails/15.jpg)
Forecast of the outcome with parametricsBuilding on proven reference data for cost and schedule estimation
ScheduleSlippage
CostOverrun
Actual costEarned valueTotal cost (forecast)Total value (planned)
15 17
![Page 16: Parametric Estimation for rel iable IT Project Estimates](https://reader035.vdocument.in/reader035/viewer/2022062323/56816755550346895ddc0c85/html5/thumbnails/16.jpg)
The power of parametricsViable estimates and cost-effective projects
Estimate & Plan Create a baseline parametric estimate Develop a Project Plan
Monitor and Control Document actuals Create forecast based on parametrics Re-estimate and establish new baseline
Measure and Analyse Establish variances for the whole project Determine parametric parameters Incorporate this knowledge in future estimates and plans
Estimate&
Plan
Actuals
Baseline
Baseline(s) vsFinal Actuals
Experience &Knowledge
Measure&
Analyse
Monitor&
Control
16 17
![Page 17: Parametric Estimation for rel iable IT Project Estimates](https://reader035.vdocument.in/reader035/viewer/2022062323/56816755550346895ddc0c85/html5/thumbnails/17.jpg)
17
ThePriceofIT.blogspot.com
@FrankVogelezang
FrankVogelezang
www.linkedin.com/in/frankvogelezang