THE QUOTATION PROCESS
After initial contact was made a DAS Technology Business Development Manager met with the Directors of Parry Group to discuss the benefi ts of Solar PV and what it could deliver for them.
The next stage was a detailed assessment of their requirements and then a bespoke quotation was created by DAS design team ensuring the roof space was maximum to give the best return for Parry.
case
stu
dies
case
stu
dies
case
stu
dies
case
stu
dies THE PAPERWORK
Siemens Energy Effi ciency Financing in conjunction with The Carbon Trust secured funding for Parry Group to enable the install to happen with no initial cost from the client.
After successfully passing their EPC and full site survey the installation was given the go ahead.
SITE ASSESSMENT
Before any installation took place our Project Manager and Technical Manager visited site to discuss Parry Group’s requirements. At this stage the specifi c installation requirements were discussed these included cable runs and equipment locations. With this being a working factory personnel and working hours needed to be taken into account during the installation. With all the information from a detailed site survey, a health and safety plan was created. This plan was agreed with the clients to ensure the installation process had minimal impact on their day to day business operations.
case
stu
dies
case
stu
dies INSTALLATION PROCESS
DAS engineers installed a 135kWp Solar PV roof mounted system which was made up of 540 panels. The panels where fi tted onto two of Parry Groups factory roofs - 144 on roof 1 and 396 on roof 2.
During the installation DAS engineers faced a number of challenges. Parry Group wanted to maximise the roof spaces and have installed as many panels as possible without blocking any of the natural light provided by the roofs sky lights. This issue was taken into account and addressed at design stage of the quotation process.
A special lift was used on site to move the large amount of panels needed to complete the install.
As ever the installation was handled successfully and carried out in record time, even the snow didn’t impact on the installation too much.
Parry Group will now enjoy up to 50+% on their electricity spends for years to coming. Along with receiving excellent feed in tariff payments providing the company with an extra income for the next twenty years.
case
stu
dies
case
stu
dies CLIENT COMMENTS
To say we are happy with the outcome of this installation would be a very big understatement indeed. Not only was the process itself painless, quick and all but disruption free, it has also saved us a substantial amount on our energy bills while requiring relatively little capital outlay.DAS Technology have essentially performed a modern day miracle for our business.
Roger Ismay , Divisional Director – Parry Group
case
stu
dies
case
stu
dies
0844 414 6637
DAS_Technology
facebook/DASTechnology
DASTechnologyUK
Have an online chat with one of our team at www.dastechnology.co.ukOr of course write to us at:
DAS Technology Ltd 2 Hamilton Place Oakham Business ParkMansfield Nottinghamshire NG18 5FA
If you would like to receive a free no obligation survey on your building please contact us on
DAS_Technology
facebook/DASTechnology
DASTechnologyUK
0844 414 6637