![Page 1: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion](https://reader031.vdocument.in/reader031/viewer/2022021717/5b3b0b0b7f8b9ace408c43f2/html5/thumbnails/1.jpg)
1 Edmonton, Alberta, Canada February 14th-16th, 2017
Performance and Analysis of a New Pipeline Pig Design for the Removal of Deposits from Corrosion Pits
Dan Fletcher, Ph.D., P.Eng.
Vincent Foong, MIET, MCMI, FIDIAG.E Michael Hooper
Fiberbuilt Manufacturing Inc.
![Page 2: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion](https://reader031.vdocument.in/reader031/viewer/2022021717/5b3b0b0b7f8b9ace408c43f2/html5/thumbnails/2.jpg)
2 Edmonton, Alberta, Canada February 14th-16th, 2017
Introduction
• Internal Corrosion cause of 51% [1] of upstream multiphase pipeline failures
• Pitting is a major concern – Under Deposit Corrosion
– Microbe Induced Corrosion
• Need to disrupt deposits
• Improve pig effectiveness
• Improve pigging programs
• Improving pig performance can improve entire mitigation program effectiveness
[1] Alberta Energy Regulator (AER), “Report 2013-B: Pipeline Performance in Alberta, 1990-2012”, August 2013, Available December 2016 at: https://www.aer.ca/documents/reports/R2013-B.pdf
![Page 3: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion](https://reader031.vdocument.in/reader031/viewer/2022021717/5b3b0b0b7f8b9ace408c43f2/html5/thumbnails/3.jpg)
3 Edmonton, Alberta, Canada February 14th-16th, 2017
Mitigating Pit Corrosion (UDC/MIC)
• Disrupt deposits
• Local pit environment
• Improve surfactant efficacy
• Remove Deposits from pit
• Clean to depths of pits
• Get inhibitors to pit bottom
![Page 4: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion](https://reader031.vdocument.in/reader031/viewer/2022021717/5b3b0b0b7f8b9ace408c43f2/html5/thumbnails/4.jpg)
4 Edmonton, Alberta, Canada February 14th-16th, 2017
Background Study
• AITF – PICOM Joint Industry Project Phase 1 – Completed December 2014 – Evaluation of Pig Design for Deposit Removal from Corrosion Pits
• Test Method and Apparatus – 4 Inch Flow Loop (Water), simulated ‘sludge’ – Measure the depth and volume removed from pits
[2] W. Mosher et. al., “Method of Evaluating Cleaning Pig Design for the Removal of Deposits from Corrosion Pits”, NACE NAWC February 2015
[2] [2] [2]
![Page 5: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion](https://reader031.vdocument.in/reader031/viewer/2022021717/5b3b0b0b7f8b9ace408c43f2/html5/thumbnails/5.jpg)
5 Edmonton, Alberta, Canada February 14th-16th, 2017
Results of Background Study [3]
• Evaluation of commercially available pigs
• Brushes are essential to effective pit cleaning
• Brushes did not reach to nominal size
• Effective cleaning to a depth equivalent to only to 25% of Pit Diameter
• Multiple passes provides only a very slight (not statistically significant) cleaning benefit
[3] W. Mosher, “Evaluation of Pig Design for Deposit Removal from Corrosion Pits – Phase 1: Crude Oil Systems and Water Systems”, Alberta Innovates – Technology Futures (InnoTech Alberta), December 2014
![Page 6: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion](https://reader031.vdocument.in/reader031/viewer/2022021717/5b3b0b0b7f8b9ace408c43f2/html5/thumbnails/6.jpg)
6 Edmonton, Alberta, Canada February 14th-16th, 2017
Improved Pit Cleaning Pig and Method
• Significant room for improvement
• Clear need to improve pit cleaning brushes
– Improve effective reach into pits
– Make multiple runs more effective
• Improve pigs and pigging programs
– Increase pig performance
– Develop pig that allows for multiple runs
– Enable pigging in aggressive applications
![Page 7: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion](https://reader031.vdocument.in/reader031/viewer/2022021717/5b3b0b0b7f8b9ace408c43f2/html5/thumbnails/7.jpg)
7 Edmonton, Alberta, Canada February 14th-16th, 2017
New Pit Cleaning Brush Design
• Improved brush geometry
• Combination of Radial and Raked Brushes
• Increase brush oversize
• Brush spacing resists debris buildup and pack-off
• Performance testing completed at the 4” AITF Flow Loop
![Page 8: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion](https://reader031.vdocument.in/reader031/viewer/2022021717/5b3b0b0b7f8b9ace408c43f2/html5/thumbnails/8.jpg)
8 Edmonton, Alberta, Canada February 14th-16th, 2017
Cleaning Performance
![Page 9: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion](https://reader031.vdocument.in/reader031/viewer/2022021717/5b3b0b0b7f8b9ace408c43f2/html5/thumbnails/9.jpg)
9 Edmonton, Alberta, Canada February 14th-16th, 2017
Depth as a % of Pit Diameter
![Page 10: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion](https://reader031.vdocument.in/reader031/viewer/2022021717/5b3b0b0b7f8b9ace408c43f2/html5/thumbnails/10.jpg)
10 Edmonton, Alberta, Canada February 14th-16th, 2017
Depth as a % of Pit Diameter
50% - 70% Improvement
Best AITF JIP Results [3]
![Page 11: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion](https://reader031.vdocument.in/reader031/viewer/2022021717/5b3b0b0b7f8b9ace408c43f2/html5/thumbnails/11.jpg)
11 Edmonton, Alberta, Canada February 14th-16th, 2017
Volume Removed from Test Coupons
![Page 12: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion](https://reader031.vdocument.in/reader031/viewer/2022021717/5b3b0b0b7f8b9ace408c43f2/html5/thumbnails/12.jpg)
12 Edmonton, Alberta, Canada February 14th-16th, 2017
Clean 0.75 inch (19 mm) pit
• Concentric rings in false colour image show conical drill point
![Page 13: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion](https://reader031.vdocument.in/reader031/viewer/2022021717/5b3b0b0b7f8b9ace408c43f2/html5/thumbnails/13.jpg)
13 Edmonton, Alberta, Canada February 14th-16th, 2017
New Pig Seal Design
• Composite Construction
• Brush/Diaphragm/Brush – Brushes = Support
– Diaphragm = Sealing
• Modular Design
• Reduced pressure differential – Pig more often
![Page 14: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion](https://reader031.vdocument.in/reader031/viewer/2022021717/5b3b0b0b7f8b9ace408c43f2/html5/thumbnails/14.jpg)
14 Edmonton, Alberta, Canada February 14th-16th, 2017
Pigging with Reduced Differential Pressure
• New Seals reduce Differential Pressure (DP)
• Can select DP for requirements
• Alternative to Urethane
• Modular and easily adapted for aggressive environments – Aromatics, Bitumen, H2S, CO2,
H2, High Temperatures
![Page 15: Performance and Analysis of a New Pipeline Pig Design for ... · Pipeline Pig Design for the ... Pig Design for the Removal of Deposits from Corrosion ... Deposit Removal from Corrosion](https://reader031.vdocument.in/reader031/viewer/2022021717/5b3b0b0b7f8b9ace408c43f2/html5/thumbnails/15.jpg)
15 Edmonton, Alberta, Canada February 14th-16th, 2017
Improved Pig for Pit Cleaning
New Pit Cleaning Brush
• Novel brush geometry
• Deep pit cleaning: effective to 37-40 % of pit diameter
• Volume cleaning: removes up to 100% of pit deposits
• Performance improves greatly with multiple passes
Multiple Pass Pigging
• Enables improved corrosion pit cleaning – multiple runs
• New seal concept
• Reduced drag and applied differential pressure
• Reduced pigging impact on well production