2018/19 Performance Benchmark
Report
Director’s Office of Asset Management
1
Tab 19
![Page 2: Performance Objective Report...Slide 2 What is the Performance Benchmark Report? • CTC Guidelines: CTC Guidelines require an annual report to the Commission showing progress toward](https://reader034.vdocument.in/reader034/viewer/2022050604/5fac0c6d3f91516c4b5fcf06/html5/thumbnails/2.jpg)
Slide 2
What is the Performance Benchmark Report?
• CTC Guidelines:CTC Guidelines require an annual report to the Commission showing progress toward asset management and SB1 performance targets
• What’s in the Report:Reports the current condition and future projections relative to the 19 established baseline conditions 2017-2027.
• Timing:The 2018/19 Performance Benchmark Report is presented in October of each year. This is the second reporting with actual conditions through 20% of the time period (2017-2027)
![Page 3: Performance Objective Report...Slide 2 What is the Performance Benchmark Report? • CTC Guidelines: CTC Guidelines require an annual report to the Commission showing progress toward](https://reader034.vdocument.in/reader034/viewer/2022050604/5fac0c6d3f91516c4b5fcf06/html5/thumbnails/3.jpg)
Slide 3
Benchmark Development
![Page 4: Performance Objective Report...Slide 2 What is the Performance Benchmark Report? • CTC Guidelines: CTC Guidelines require an annual report to the Commission showing progress toward](https://reader034.vdocument.in/reader034/viewer/2022050604/5fac0c6d3f91516c4b5fcf06/html5/thumbnails/4.jpg)
Slide 4
Report Features
![Page 5: Performance Objective Report...Slide 2 What is the Performance Benchmark Report? • CTC Guidelines: CTC Guidelines require an annual report to the Commission showing progress toward](https://reader034.vdocument.in/reader034/viewer/2022050604/5fac0c6d3f91516c4b5fcf06/html5/thumbnails/5.jpg)
Slide 5
Summary of Progress on SB1 Targets
![Page 6: Performance Objective Report...Slide 2 What is the Performance Benchmark Report? • CTC Guidelines: CTC Guidelines require an annual report to the Commission showing progress toward](https://reader034.vdocument.in/reader034/viewer/2022050604/5fac0c6d3f91516c4b5fcf06/html5/thumbnails/6.jpg)
Slide 6
Culvert Condition Detail
![Page 7: Performance Objective Report...Slide 2 What is the Performance Benchmark Report? • CTC Guidelines: CTC Guidelines require an annual report to the Commission showing progress toward](https://reader034.vdocument.in/reader034/viewer/2022050604/5fac0c6d3f91516c4b5fcf06/html5/thumbnails/7.jpg)
Slide 7
TMS Projection
![Page 8: Performance Objective Report...Slide 2 What is the Performance Benchmark Report? • CTC Guidelines: CTC Guidelines require an annual report to the Commission showing progress toward](https://reader034.vdocument.in/reader034/viewer/2022050604/5fac0c6d3f91516c4b5fcf06/html5/thumbnails/8.jpg)
Slide 8
TMS Challenges
• Data quality and business process for post project updates• Reporting of project level accomplishments
![Page 9: Performance Objective Report...Slide 2 What is the Performance Benchmark Report? • CTC Guidelines: CTC Guidelines require an annual report to the Commission showing progress toward](https://reader034.vdocument.in/reader034/viewer/2022050604/5fac0c6d3f91516c4b5fcf06/html5/thumbnails/9.jpg)
Slide 9
Summary of Progress on Asset Management Targets
![Page 10: Performance Objective Report...Slide 2 What is the Performance Benchmark Report? • CTC Guidelines: CTC Guidelines require an annual report to the Commission showing progress toward](https://reader034.vdocument.in/reader034/viewer/2022050604/5fac0c6d3f91516c4b5fcf06/html5/thumbnails/10.jpg)
Slide 10
Bridge Condition
![Page 11: Performance Objective Report...Slide 2 What is the Performance Benchmark Report? • CTC Guidelines: CTC Guidelines require an annual report to the Commission showing progress toward](https://reader034.vdocument.in/reader034/viewer/2022050604/5fac0c6d3f91516c4b5fcf06/html5/thumbnails/11.jpg)
Slide 11
SHOPP Bridge Project Timeline
Planning Capital Outlay Support (COS) COS Closeout
Programming PA&ED Complete
Des
ign
Com
plet
e, R
TL a
ndRi
ght o
f W
ay C
ertif
icat
ion
PA&EDPID
PS&E (Design) Construction
Right of Way
Programming & Allocation
Allocation
AllocationNeed & Priority
Identified
ProgramTAMP
Begi
n C
onst
ruct
ion
End
Con
stru
ctio
n End Project
DEFINITIONSTAMP Transportation Asset Management PlanPID Project Initiation DocumentPA&ED Project Approval and Environmental DocumentPS&E Plans, Specifications and EstimateRTL Ready to List for Advertising
Re - inspection
Average Time Period = 9.5 Years
On -going
2 Years
1 Year
2.2 Years
1.6 Years
0.5 Year 1.2Years
1 Year
![Page 12: Performance Objective Report...Slide 2 What is the Performance Benchmark Report? • CTC Guidelines: CTC Guidelines require an annual report to the Commission showing progress toward](https://reader034.vdocument.in/reader034/viewer/2022050604/5fac0c6d3f91516c4b5fcf06/html5/thumbnails/12.jpg)
Slide 12
Bridge Corrective Strategies
• Permit streamlining – AB 1282• Increase the Bridge Project Portfolio
• Utilize quicker delivery programs• SHOPP
• Potential Programming Changes• Liberal use of Long Lead for Bridges• Innovative Delivery (Design Build, CMGC)
• Inspection Data Update• Post project update coordination
![Page 13: Performance Objective Report...Slide 2 What is the Performance Benchmark Report? • CTC Guidelines: CTC Guidelines require an annual report to the Commission showing progress toward](https://reader034.vdocument.in/reader034/viewer/2022050604/5fac0c6d3f91516c4b5fcf06/html5/thumbnails/13.jpg)
Slide 13
Conclusion
• Overall, we are making good progress• Watching LOS and TMS • Need to make changes to achieve bridge condition targets