BRACBRACPMO WESTPMO WEST
Petroleum Program UpdatePetroleum Program Update
Wilson DoctorWilson DoctorNavy Project ManagerNavy Project Manager
March 13, 2008March 13, 2008RAB MeetingRAB Meeting
Former NAS Moffett FieldFormer NAS Moffett FieldFormer NAS Moffett Field
![Page 2: Petroleum Program Update](https://reader033.vdocument.in/reader033/viewer/2022060109/5558b5ccd8b42a7e298b4bdc/html5/thumbnails/2.jpg)
BRACBRACPMO WESTPMO WEST
2
Presentation OverviewPresentation OverviewPresentation Overview
• Background
• Petroleum projects– Buildings 29 & 55 pipelines– Additional Building 29 pipelines– Building 55 sump– Site 14 South
![Page 3: Petroleum Program Update](https://reader033.vdocument.in/reader033/viewer/2022060109/5558b5ccd8b42a7e298b4bdc/html5/thumbnails/3.jpg)
BRACBRACPMO WESTPMO WEST
3
BackgroundBackgroundBackground
• 76 petroleum sites - closed to date
• 54 petroleum sites - in progress
![Page 4: Petroleum Program Update](https://reader033.vdocument.in/reader033/viewer/2022060109/5558b5ccd8b42a7e298b4bdc/html5/thumbnails/4.jpg)
BRACBRACPMO WESTPMO WEST
4
Building 29 & 55 PipelinesBuilding 29 & 55 PipelinesBuilding 29 & 55 Pipelines
• Two inactive pipelines not previously investigated
• Building 29 pipelines– Aviation gasoline– Near Hangar 1– Inactive since 1950s– 900 ft, 2-inch and 3-inch diameter, metal
• Building 55 pipeline– Boiler fuel– Near Hangars 2 & 3– Inactive since at least 1994– 1400 ft, 3-inch diameter, metal
![Page 5: Petroleum Program Update](https://reader033.vdocument.in/reader033/viewer/2022060109/5558b5ccd8b42a7e298b4bdc/html5/thumbnails/5.jpg)
BRACBRACPMO WESTPMO WEST
5
Building 29 & 55 PipelinesBuilding 29 & 55 PipelinesBuilding 29 & 55 Pipelines
• Collected soil samples along pipelines every 20 feet
• Fieldwork completed
• Draft report
![Page 6: Petroleum Program Update](https://reader033.vdocument.in/reader033/viewer/2022060109/5558b5ccd8b42a7e298b4bdc/html5/thumbnails/6.jpg)
BRACBRACPMO WESTPMO WEST
6
Building 29 & 55 PipelinesBuilding 29 & 55 PipelinesBuilding 29 & 55 Pipelines
![Page 7: Petroleum Program Update](https://reader033.vdocument.in/reader033/viewer/2022060109/5558b5ccd8b42a7e298b4bdc/html5/thumbnails/7.jpg)
BRACBRACPMO WESTPMO WEST
7
Additional Building 29 PipelinesAdditional Building 29 PipelinesAdditional Building 29 Pipelines
• Background– 3-inch pipeline and 8-inch pipeline
• 4,880 ft and 3,640 ft– Installed in 1930s and 1940s– Inactive since 1960s
• Sampled soil every 50 feet
• Fieldwork completed in November 2007
• Preparing draft report
![Page 8: Petroleum Program Update](https://reader033.vdocument.in/reader033/viewer/2022060109/5558b5ccd8b42a7e298b4bdc/html5/thumbnails/8.jpg)
BRACBRACPMO WESTPMO WEST
8
Additional Building 29 PipelinesAdditional Building 29 PipelinesAdditional Building 29 Pipelines
![Page 9: Petroleum Program Update](https://reader033.vdocument.in/reader033/viewer/2022060109/5558b5ccd8b42a7e298b4bdc/html5/thumbnails/9.jpg)
BRACBRACPMO WESTPMO WEST
9
Building 55 SumpBuilding 55 SumpBuilding 55 Sump
• Sump installed during the Building 55 pipeline investigation in 2005
• 10-foot deep PVC pipe
• Removed sump and collected soil samples February 2008
• Four quarters of groundwater monitoring
• Prepare draft report
![Page 10: Petroleum Program Update](https://reader033.vdocument.in/reader033/viewer/2022060109/5558b5ccd8b42a7e298b4bdc/html5/thumbnails/10.jpg)
BRACBRACPMO WESTPMO WEST
10
Building 55 SumpBuilding 55 SumpBuilding 55 Sump
![Page 11: Petroleum Program Update](https://reader033.vdocument.in/reader033/viewer/2022060109/5558b5ccd8b42a7e298b4bdc/html5/thumbnails/11.jpg)
BRACBRACPMO WESTPMO WEST
11
Site 14 South BackgroundSite 14 South BackgroundSite 14 South Background
• Fuel station
• Site covers about 1 acre
• Two 5,000-gal USTs (Tanks 19 & 20)– Removed in 1986– Contained gasoline and diesel
![Page 12: Petroleum Program Update](https://reader033.vdocument.in/reader033/viewer/2022060109/5558b5ccd8b42a7e298b4bdc/html5/thumbnails/12.jpg)
BRACBRACPMO WESTPMO WEST
12
Site 14 South BackgroundSite 14 South BackgroundSite 14 South Background
![Page 13: Petroleum Program Update](https://reader033.vdocument.in/reader033/viewer/2022060109/5558b5ccd8b42a7e298b4bdc/html5/thumbnails/13.jpg)
BRACBRACPMO WESTPMO WEST
13
Site 14 South BackgroundSite 14 South BackgroundSite 14 South Background
• Previous Investigations:
– Initial soil and groundwater (GW) assessment began 1987
– Periodic GW monitoring mid-1990s
– Site assessment activities 2003
![Page 14: Petroleum Program Update](https://reader033.vdocument.in/reader033/viewer/2022060109/5558b5ccd8b42a7e298b4bdc/html5/thumbnails/14.jpg)
BRACBRACPMO WESTPMO WEST
14
Site 14 South BackgroundSite 14 South BackgroundSite 14 South Background
• Previous investigations (continued):
– Chemical oxidation January 2005
– Quarterly groundwater monitoring 2005 to 2006• levels decreased initially• levels returned
• Previous investigation findings:– No free product observed at the site– Stable contaminant plume
![Page 15: Petroleum Program Update](https://reader033.vdocument.in/reader033/viewer/2022060109/5558b5ccd8b42a7e298b4bdc/html5/thumbnails/15.jpg)
BRACBRACPMO WESTPMO WEST
15
Site 14 SouthSite 14 SouthSite 14 South
Current investigation:
• Final Work Plan February 2008– Additional site characterization– Install seven additional groundwater monitoring wells– Four quarters groundwater sampling
• New wells and nine existing wells– Evaluate data– Potential tank testing
![Page 16: Petroleum Program Update](https://reader033.vdocument.in/reader033/viewer/2022060109/5558b5ccd8b42a7e298b4bdc/html5/thumbnails/16.jpg)
BRACBRACPMO WESTPMO WEST
16
Site 14 South Site 14 South Site 14 South
![Page 17: Petroleum Program Update](https://reader033.vdocument.in/reader033/viewer/2022060109/5558b5ccd8b42a7e298b4bdc/html5/thumbnails/17.jpg)
BRACBRACPMO WESTPMO WEST
17
SummarySummarySummary
• Moffett petroleum program ongoing
• 76 petroleum sites - closed to date
• 54 petroleum sites - in progress
![Page 18: Petroleum Program Update](https://reader033.vdocument.in/reader033/viewer/2022060109/5558b5ccd8b42a7e298b4bdc/html5/thumbnails/18.jpg)
BRACBRACPMO WESTPMO WEST
18
Questions?Questions?Questions?