RESOLVED That the Design Commission, having considered designs for the installation of a
prototypical newsstand, 1362 Jerome Avenue, southeast corner Jerome Avenue and Elliot
Place, Bronx, submitted by the Department of Consumer Affairs and the Department of
Transportation, represented by exhibits 7260-D & E of record in this matter, hereby gives to the
same unanimous final approval.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25976
RESOLVED That the Design Commission, having considered designs for the installation of a
prototypical newsstand, 418 11th Avenue, southeast corner of 11th Avenue and West 36th
Street, Manhattan, submitted by the Department of Consumer Affairs and the Department of
Transportation, represented by exhibits 7259-D & E of record in this matter, hereby gives to the
same unanimous final approval.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25977
RESOLVED That the Design Commission, having considered designs for the installation of a
condensing unit and louver, Bronx Family Criminal Courthouse, 215 East 161st Street, Bronx,
submitted by the Department of Consumer Affairs and Department of Citywide Administrative
Services, represented by exhibits 3935-AQ, AR, AS & AT of record in this matter, hereby gives
to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25978
RESOLVED That the Design Commission, having considered final photographs for the
installation of Double Sun by Mary Temple, McCarren Park Play Center, 776 Lorimer Street,
Brooklyn, submitted by the Department of Cultural Affairs’ Percent for Art Program and the
Department of Parks & Recreation, represented by exhibits 580-BU & BV of record in this
matter, hereby gives to the same unanimous final approval.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25979
RESOLVED That the Design Commission, having considered final photographs for the
installation of Peace Clock by Lina Viste Grønli, Trygve Lie Plaza, First Avenue between East
41st Street and East 42nd Street, Manhattan, submitted by the Department of Cultural Affairs’
Percent for Art Program and the Department of Parks & Recreation, represented by exhibits
2716-BH & BI of record in this matter, hereby gives to the same unanimous final approval.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25980
RESOLVED That the Design Commission, having considered designs for the
construction of a netted course and playground (Nature Trek), Bronx Zoo, 2300 Southern
Boulevard, Bronx, submitted by the Department of Cultural Affairs, the Department of Parks &
Recreation, and the Wildlife Conservation Society, represented by exhibits 2336-NE, NF, NG &
NH of record in this matter, hereby gives to the same unanimous preliminary and final
approval.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25981
RESOLVED That the Design Commission, having considered designs for the
construction of a zipline (Treetop Adventure), Bronx Zoo, 2300 Southern Boulevard, Bronx,
submitted by the Department of Cultural Affairs, the Department of Parks & Recreation, and the
Wildlife Conservation Society, represented by exhibits 2336-NI, NJ, NK & NL of record in this
matter, hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25982
RESOLVED That the Design Commission, having considered designs for the installation of
rooftop HVAC equipment, Engine Company 207 and 84th Police Precinct, 301 Gold Street,
Brooklyn, submitted by the Department of Design and Construction, represented by exhibits
3699-E, F, G & H of record in this matter, hereby gives to the same unanimous preliminary and
final approval.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Signe Nielsen,
Hank Willis Thomas, Shin-pei Tsay, Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25983
RESOLVED That the Design Commission, having considered designs for the installation of
lighting, New York Public Library for the Performing Arts, 40 Lincoln Center Plaza, Lincoln
Center, southwest corner of Amsterdam Avenue and 65th Street, Manhattan, submitted by the
Department of Design and Construction and the New York Public Library, represented by
exhibits 3470-GA, GB, GC & GD of record in this matter, hereby gives to the same unanimous
preliminary and final approval. Commissioners Morgenthau, Sheffer, and Tenenbaum recused
themselves.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25984
RESOLVED That the Design Commission, having considered designs for the installation of
aeration tank mixer platforms, piping, conduit, louvers and lighting as part of a Level 1
Biological Nutrient Removal Upgrade, Coney Island Wastewater Treatment Plant, 2591 Knapp
Street, Brooklyn, submitted by the Department of Environmental Protection, represented by
exhibits 1928-EG, EH, EI & EJ of record in this matter, hereby gives to the same unanimous
preliminary and final approval with the understanding that DEP will (1) inspect the artwork,
Coney Island Wave Wall in Green by Ned Smyth; (2) report back to the Commission on any
damage; and (3) make any repairs necessary.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25985
RESOLVED That the Design Commission, having considered designs for the reconstruction of
the Mason Avenue Pumping Station, 949 Mason Avenue, Staten Island, submitted by the
Department of Environmental Protection, represented by exhibits 5636-L, M, N, O & P of
record in this matter, hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25986
RESOLVED That the Design Commission, having considered designs for the installation of a
guardrail, Robert N. Davoren Center, 11-11 Hazen Street, Rikers Island, Bronx, submitted by
the Department of Correction, represented by exhibits 1554-RA, RB, RC & RD of record in this
matter, hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25987
RESOLVED That the Design Commission, having considered designs for the installation of an
ADA lift, 119 Grove Street, Brooklyn, submitted by the Department of Transportation,
represented by exhibits 7268-A, B, C & D of record in this matter, hereby gives to the same
unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25988
RESOLVED That the Design Commission, having considered designs for the installation of M-
poles, Vanderbilt Avenue between Atlantic Avenue and Plaza Street, Brooklyn, submitted by
the Department of Transportation, represented by exhibits 7269-A, B & C of record in this
matter, hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25989
RESOLVED That the Design Commission, having considered designs for the installation of
photovoltaic panels and lighting on prototypical bus shelters, citywide, submitted by the
Department of Transportation, represented by exhibits 6816-GE, GF, GG & GH of record in this
matter, hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25990
RESOLVED That the Design Commission, having considered a proposal for the repainting of
the Cropsey Avenue Bridge over Coney Island Creek, Brooklyn, submitted by the Department
of Transportation, represented by exhibits 1708-E, F & G of record in this matter, hereby gives
to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25991
RESOLVED That the Design Commission, having considered designs for the installation of a
prototypical automatic public toilet (APT), Williamsburg Bridge Plaza, Havemeyer Street
between Broadway and South 5th Street, Brooklyn, submitted by the Department of
Transportation, represented by exhibits 702-C, D & E of record in this matter, hereby gives to
the same unanimous final approval.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25992
RESOLVED That the Design Commission, having considered designs for the reconstruction of
athletic courts, City Line Park, adjacent to Transit Tech Career and Technical High School,
Conduit Boulevard, Fountain Avenue, and Wells Street, Brooklyn, submitted by the the
Department of Parks & Recreation, represented by exhibits 7270-A, B, C, D & E of record in
this matter, hereby gives to the same unanimous preliminary approval.
Preliminary approval is conditioned upon submission of this project for final review and
approval before December 12, 2018.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25993
RESOLVED That the Design Commission, having considered designs for the rehabilitation of a
comfort station, Dutch Kills Playground, Crescent Street and 36th Ave, Long Island City,
Queens, submitted by the Department of Parks & Recreation, represented by exhibits 2843-E &
F of record in this matter, hereby gives to the same unanimous preliminary approval with the
understanding that (1) the paving will be coordinated with the revised Dutch Kills Playground
design and (2) all doors and metals will be painted black per the approved prototype comfort
station renovation kit of parts.
Preliminary approval is conditioned upon submission of this project for final review and
approval before December 12, 2018.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25994
RESOLVED That the Design Commission, having considered designs for the reconstruction of
One Room Schoolhouse Park, Astoria Boulevard and 90th Street, Astoria, Queens, submitted
by the Department of Parks & Recreation, represented by exhibits 7271-A & B of record in this
matter, hereby gives to the same unanimous preliminary approval.
Preliminary approval is conditioned upon submission of this project for final review and
approval before December 12, 2018.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25995
RESOLVED That the Design Commission, having considered designs for the reconstruction of
Playground 123, Phase II, Morningside Park, West 123rd Street and Morningside Avenue,
Manhattan, submitted by the Department of Parks & Recreation, represented by exhibits 56-
CV, CW & CX of record in this matter, hereby gives to the same unanimous preliminary
approval.
Preliminary approval is conditioned upon submission of this project for final review and
approval before December 12, 2018.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25996
RESOLVED That the Design Commission, having considered designs for the reconstruction of
Stapleton Playground, adjacent to P.S./I.S. 78, Tompkins Avenue between Broad Street and
Hill Street, Stapleton, Staten Island, submitted by the Department of Parks & Recreation,
represented by exhibits 4029-E, F, G & H of record in this matter, hereby gives to the same
unanimous preliminary approval with the understanding that the final submission will include
asphalt paths at the picnic table area along Tompkins Avenue.
Preliminary approval is conditioned upon submission of this project for final review and
approval before December 12, 2018.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25997
RESOLVED That the Design Commission, having considered designs for the reconstruction of
Tribute Park, 116th Street and Beach Channel Drive, Far Rockaway, Queens, submitted by the
Department of Parks & Recreation, represented by exhibits 6596-K, L & M of record in this
matter, hereby gives to the same unanimous preliminary approval.
Preliminary approval is conditioned upon submission of this project for final review and
approval before December 12, 2018.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25998
RESOLVED That the Design Commission, having considered designs for the reconstruction of
the shoreline, southern portion of Pelham Bay Park, Pelham Parkway, Bruckner Boulevard,
Watt Avenue and Middletown Road, Bronx, submitted by the Department of Parks &
Recreation, represented by exhibits 1842-HM, HN & HO of record in this matter, hereby gives
to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25999
RESOLVED That the Design Commission, having considered designs for the rehabilitation of a
nature center, Fulton Avenue between Claremont Parkway and East 172nd Street, Crotona
Park, Bronx, submitted by the Department of Parks & Recreation, represented by exhibits 177-
DS, DT, DU, DV, DW & DX of record in this matter, hereby gives to the same unanimous
preliminary and final approval.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 26000
RESOLVED That the Design Commission, having considered designs for the construction of a
dog run and reconstruction of a basketball court, Triborough Bridge Playground, Hoyt Avenue
North, 23rd Street, Hoyt Avenue South, and 24th Street, Astoria, Queens, submitted by the
Department of Parks & Recreation, represented by exhibits 2202-J K, L & M of record in this
matter, hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 26001
RESOLVED That the Design Commission, having considered designs for the reconstruction of
a playground and adjacent site work, Asser Levy Park, Sea Breeze Avenue, West Fifth Street,
and Surf Avenue, Brooklyn, submitted by the Department of Parks & Recreation, represented
by exhibits 1340-BF, BG, BH & BI of record in this matter, hereby gives to the same unanimous
final approval.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 26002
RESOLVED That the Design Commission, having considered designs for the reconstruction of
Frank Principe Park artifical turf ballfields and soccer field, Maurice Avenue, 54th Avenue, and
Borden Avenue, Maspeth, Queens, submitted by the Department of Parks & Recreation,
represented by exhibits 5341-K, L & M of record in this matter, hereby gives to the same
unanimous final approval.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 26003
RESOLVED That the Design Commission, having considered designs for the reconstruction of
Spuyten Duyvil Playground, Douglas Avenue between West 236th Street and West 235th
Street, Bronx, submitted by the Department of Parks & Recreation, represented by exhibits
2980-H, I & J of record in this matter, hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay, Mary Valverde,
Commissioners
December 12, 2016
CERTIFICATE 26004
RESOLVED That the Design Commission, having considered designs for the reconstruction of
the perimeter landscaping between West 86th Street and West 90th Street, Central Park,
Manhattan, submitted by the Department of Parks & Recreation and the Central Park
Conservancy, represented by exhibits 5124-K & L of record in this matter, hereby gives to the
same unanimous final approval. Commissioner Sheffer recused herself.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 26005
RESOLVED That the Design Commission, having considered designs for the construction of a
shipping booth, sales counter, and roll-up doors, 410 Halleck Street, west side of Hunts Point
Produce Market Row B, Bronx, submitted by the Economic Development Corporation,
represented by exhibits 3394-HN, HO, HP & HQ of record in this matter, hereby gives to the
same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 26007
RESOLVED That the Design Commission, having considered designs for the construction of
streetscape improvements, Hart Place, Stillwell Avenue, Surf Avenue, Parachute Way, Ocean
Way, West 24th Street, Mermaid Avenue, West 21st Street, Neptune Avenue, West 17th Street,
Coney Island, Brooklyn, submitted by the the Economic Development Corporation and the
Department of Transportation, represented by exhibits 1170-KH, KI, KJ & KK of record in this
matter, hereby gives to the same unanimous preliminary and final approval with the
understanding that DOT will conduct a traffic study to determine the feasibility of adding a bike
lane on Surf Avenue.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Ann Tenenbaum, Hank Willis Thomas, Shin-pei Tsay,
Mary Valverde, Commissioners
December 12, 2016
CERTIFICATE 25942
RESOLVED That the Design Commission, having considered designs for the installation of a
prototypical newsstand, 516 West 34th Street, southeast corner of West 34th Street and
Hudson Boulevard, Manhattan, submitted by the Department of Consumer Affairs and
Department of Transportation, represented by exhibits 7262-A, B & C of record in this matter,
hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before December 12, 2018, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on December 12, 2016.
Keri Butler
Deputy Director